Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

Text of ICC-001 Attachment 5.pdf

Extracted from the file · 67 pages · 136,480 characters

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

  1. Page 31 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 31 of 74 ATTACHMENT I INTERCONNECTION REQUEST Capacity addition to or Material Modification of an existing Generating Facility: Yes ___No ___ Commencement of participation in the wholesale markets by an existing Generating Facility: Yes ___No ___ If capacity addition to or Material Modification of an existing facility, please describe: Will the Generating Facility be used for any of the following? To Net Meter? Yes ___ No ___ To Supply Power to the Generating Facility? Yes ___No ___ To Supply Power to Others? Yes ____ No ____ Is the Interconnection Request for:: A retail customer interconnecting a new Generating Facility that will produce electric energy to be consumed only on the retail customer’s site? Yes_____No_____ If onsite use of power, describe the mode of operation: (Please Check all that Apply) □ Peak Shaving □ Demand Management □ Primary Power/Base Load □ Combined Heat and Power or Cogeneration □ Stand By/Emergency/Back-up Paralleling: Will the Generating Facility operate in parallel with the EDC for any amount of time? Yes_____No_____ If No: Then Generator is operating as Open Transition If Yes: Will the Generating Facility operate in parallel with EDC for longer than 100 milliseconds Yes_____No_____ If No: Then Generator is operating as Closed Transition If Yes: Then Generator is operating as Parallel Operation Will it vary by season? (please describe) A Qualifying Facility where 100% of the output will be sold to its host utility? Yes_____No_____ I-3
  2. Page 32 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 32 of 74 ATTACHMENT I INTERCONNECTION REQUEST A Generator interconnecting a new Generating Facility that plans to participate in the wholesale markets? Yes_____No_____ An existing Generating Facility commencing participation in the wholesale markets? Yes_____No_____ For installations at locations with existing electric service to which the proposed Generating Facility will interconnect, provide: (Local Electric Service Provider) _____________________________________________ (Existing Account Number) ____________________________________________________ Contact Name: _______________________________________________________________ Title: ______________________________________________________________________ Address: ___________________________________________________________________ Telephone (Day): _____________________Telephone (Evening): ______________________ Fax: ________________________________ E-Mail Address: _________________________ Requested Point of Interconnection: ___________ Generating Facility's Requested In-Service Date: EDC Account #________________________________________________________________ EDC Meter #________________________________________________________________ Will there be a new service request / or new construction associated with this generation project? Generating Facility Information (For each Generator if there are than one ) Data apply only to the Generating Facility, not the Interconnection Facilities. Energy Source: ___ Solar ___ Wind ___ Hydro ___ Hydro Type (e.g. Run-ofRiver):_____________Diesel ___ Natural Gas ___ Fuel Oil ___ Other (state type) ___________________________ Prime Mover: Steam Turbine Fuel Cell Reciprocating Engine Micro-turbine PV I-4 Gas Turbine Other
  3. Page 33 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 33 of 74 ATTACHMENT I INTERCONNECTION REQUEST Type of Generator: ____Synchronous ____Induction ____ Inverter________________ Generator Nameplate Rating: ________kW (Typical) Generator Nameplate kVAR: __________________________________________ Generator Nameplate BIL Rating: _______kV Generating Facility or Customer-Site Load: _________________kW (if none, so state) Typical Reactive Load (if known): _________________ Maximum Physical Export Capability Requested: ______________ kW List components of the Generating Facility equipment package that are currently certified: Equipment Type 1. 2. 3. 4. 5. Certifying Entity Is the prime mover compatible with the certified protective relay package? ____Yes ____No Generator ________________________________________________________ Manufacturer, Model Name & Number: Version Number: Nameplate Output Power Rating in kW: (Summer) _____________ (Winter) ______________ Nameplate Output Power Rating in kVA: (Summer) _____________ (Winter) ______________ Individual Generator Power Factor Rated Power Factor: Leading: _____________Lagging: _______________ Total Number of Generators in wind farm to be interconnected pursuant to this I-5
  4. Page 34 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 34 of 74 ATTACHMENT I INTERCONNECTION REQUEST Interconnection Request: __________ Elevation: ______ ___Single phase ___Three phase Inverter Manufacturer, Model Name & Number (if used): _____________________________________ List of adjustable set points for the protective equipment or software: __________________________ __________________________ Note: A completed Power Systems Load Flow data sheet must be supplied with the Interconnection Request. Generating Facility Characteristic Data (for inverter-based machines) Max design fault contribution current: Instantaneous Harmonics Characteristics: Start-up requirements: Available fault current: Generating Facility Characteristic Data (for rotating machines) RPM Frequency: _____________ Neutral Grounding Resistor (If Applicable): ____________ Synchronous Generators: Direct Axis Synchronous Reactance, Xd: _______ Per Unit Direct Axis Transient Reactance, X d’:___________ Per Unit Direct Axis Sub transient Reactance, X d”: ______________ Per Unit Negative Sequence Reactance, X2: _________ Per Unit Zero Sequence Reactance, X0: ____________ Per Unit KVA Base: __________________________ Field Volts: ______________ Field Amperes: ______________ Induction Generators: Motoring Power (kW): ______________ I22t or K (Heating Time Constant): ______________ I-6 or RMS?
  5. Page 35 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 35 of 74 ATTACHMENT I INTERCONNECTION REQUEST Rotor Resistance, Rr: ______________Per Unit Stator Resistance, Rs: ______________ Per Unit Stator Reactance, Xs: ______________Per Unit Rotor Reactance, Xr: ______________ Per Unit Magnetizing Reactance, Xm: ______________Per Unit Short Circuit Reactance, Xd'': ______________Per Unit Exciting Current: ______________Amps Temperature Rise: ______________ Frame Size: ______________ Design Letter: ______________ Reactive Power Required In Vars (No Load): ______________ Reactive Power Required In Vars (Full Load): ______________ Total Rotating Inertia, H: _____________ Per Unit on kVA Base Excitation and Governor System Data for Synchronous Generators Only. Provide appropriate IEEE model block diagram of excitation system, governor system and power system stabilizer (PSS) in accordance with the regional reliability council criteria. A PSS may be determined to be required by applicable studies. A copy of the manufacturer's block diagram may not be substituted. Interconnection Facilities Information An Interconnection transformer is required unless waived by the Interconnecting EDC. Transformer Data (If Applicable, for Generating Facility-Owned Transformer): Is the transformer: ____single phase _____three phase? Size: ___________kVA Transformer Impedance: _______% on __________kVA Base Transformer Positive-Sequence Short Circuit Impedances (pu): Zps= _______, Zpt=_______, Zst=_______ Transformer Zero-Sequence Impedances (pu): ): Zpm0= _______, Zsm0=_______, Zmg0=_______ Transformer Neutral Grounding Reactor/Resistor Impedance (Ohms): Transformer BIL Rating _______kV If Three Phase: Transformer Primary: _____ Volts _____ Delta _____Wye _____ Wye Grounded Transformer Secondary: _____ Volts _____ Delta _____Wye _____ Wye Grounded Transformer Tertiary: _____ Volts _____ Delta _____Wye _____ Wye Grounded Transformer Fuse Data (If Applicable, for Generating Facility-Owned Fuse): I-7
  6. Page 36 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 36 of 74 ATTACHMENT I INTERCONNECTION REQUEST (Attach copy of fuse manufacturer's Minimum Melt and Total Clearing Time-Current Curves) Manufacturer: __________________ Type: _______________ Size: ________Speed: ______________ Interconnecting Circuit Breaker (if applicable): Manufacturer: ____________________________ Type: __________ Load Rating (Amps): _______ Interrupting Rating (Amps): ________ Trip Speed (Cycles): __________ Interconnection Protective Relays (If Applicable): If Microprocessor-Controlled: List of Functions and Adjustable Set points for the protective equipment or software: Set point Function Minimum Maximum 1. 2. 3. 4. 5. 6. If Discrete Components: (Enclose Copy of any Proposed Time-Overcurrent Coordination Curves) Manufacturer: Manufacturer: Manufacturer: Type: Type: Type: Style/Catalog No.: Style/Catalog No.: Style/Catalog No.: I-8 Proposed Setting: Proposed Setting: Proposed Setting:
  7. Page 37 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 37 of 74 ATTACHMENT I INTERCONNECTION REQUEST Manufacturer: Manufacturer: Type: Type: Style/Catalog No.: Style/Catalog No.: Proposed Setting: Proposed Setting: Current Transformer Data (If Applicable): (Enclose Copy of Manufacturer's Excitation and Ratio Correction Curves) Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: ____ Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: ____ Potential Transformer Data (If Applicable): Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: ____ Manufacturer: Type: Accuracy Class: Proposed Ratio Connection: ____ General Information Enclose two D-sized (24” x 36”) copies of site electrical one-line diagram showing the configuration of all Generating Facility equipment (unless waived by the EDC), current and potential circuits, and protection and control schemes. This D-sized one-line diagram must be signed and stamped by a licensed Professional Engineer if the Generating Facility is larger than 50 kW. Are two copies of One-Line Diagram Enclosed? ____Yes ____No Enclose copy of any site documentation that indicates the precise physical location of the proposed Generating Facility (e.g., USGS topographic map or other diagram or documentation). Proposed location of protective interface equipment on property (include address if different from the Generating Facility's address) _________________________________________________ Enclose copy of any site documentation that describes and details the operation of the protection and control schemes. Is Available Documentation Enclosed? ___Yes ____No Enclose copies of schematic drawings for all protection and control circuits, relay current circuits including CT’s wiring connection and their ratios, relay potential circuits including Potential I-9
  8. Page 38 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 38 of 74 ATTACHMENT I INTERCONNECTION REQUEST Transformer’s (PT’s) wiring connection and their ratios, any alarm/monitoring circuits (if applicable). Are Schematic Drawings Enclosed? ___Yes ____No Applicant Signature I have read the Guidelines for Generator Interconnection – Fast Track and Study Processes and agree to abide by all terms and conditions as provided for in theses Guidelines. I understand that my Interconnection Request may be rejected by the Interconnecting EDC or there may be a delay in processing my Interconnection Request if the Interconnecting EDC determines that I have not complied with these Guidelines. I hereby certify that, to the best of my knowledge, all the information provided in this Interconnection Request is true and correct. For Generator: __________________________________________ Date: ____________ I-10
  9. Page 39 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 39 of 74 ATTACHMENT II APPLICATION ACKNOWLEDGEMENT RECEIPT-SAMPLE FORM Receipt of Interconnection Application (Eversource Energy/UI Use Only) Generator Name: ______________________ Date Interconnection Request Received: ________________ Received By: ________________________________________ Application Number ______________________ II-1
  10. Page 40 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 40 of 74 ATTACHMENT III INFORMATION REQUEST- SAMPLE FORM Missing Application Information (Eversource Energy/UI Use Only) Interconnection Application #: ______________________ Generator Name: ______________________ Missing Elements: Payment Deficient Signed Application One Line Schematic Site Plan Technical Data Insurance Date Cured: __________ Date Cured: __________ Date Cured: __________ Date Cured: __________ Date Cured: __________ Date Cured: __________ Date Deemed Valid Interconnection Request: __________ Deemed Valid By: ____________________________ III-1

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)