Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

Text of ICC-001 Attachment 5.pdf

Extracted from the file · 67 pages · 136,480 characters

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

  1. Page 5 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 5 of 74 SECTION 1 The state-jurisdictional Interconnection process begins when a Generator submits an application to the EDC. The EDC will review the application and submittals and work with the customer to resolve any discrepancy and obtain any missing information. The EDC will then conclude the application review within fifteen (15) Business Days and submit the results to the Generator. Upon completion of the application review, if an Interconnection Study (Feasibility, Impact and/or Facility) is required, the EDC will provide a Study Agreement and an estimate of the costs to complete the Study. The EDC will request that the Generator execute the Agreement within fifteen (15) Business Days and pay the estimated cost of the Study. Some or all of the Studies may be required and the EDC will work with the Generator to identify the required Studies. Each Study will require its own Study Agreement. Distribution Studies usually require approximately thirty (30) Business Days for completion of each Study and may include a Feasibility Study, an Impact Study and a Facility Study. Transmission studies may be required for some Interconnections even if the Generator Interconnection falls under state rules. Transmission studies are more complex and must be conducted in accordance with applicable ISO-NE rules and procedures. These Guidelines do not address the transmission studies process required by ISO-NE. The Generator may obtain guidance from the ISO-NE Tariff, Schedule 22 and 23 and Section I.3.9. However, during the Interconnection process, the EDC will provide guidance including information concerning the scope, duration and cost of the transmission studies. At the conclusion of the studies, the EDC will submit an Interconnection Agreement (IA) to the Generator. The Generator will be required to sign the IA and submit full payment for the estimated costs for upgrades required to interconnect the Generating Facility. At the conclusion of the project, the EDC will reconcile actual vs. estimated cost and reimburse or bill the Generator accordingly. Once the upgrades are implemented, the following steps will be required to allow the Generator to interconnect to the EDC. • Provide Proof of Municipal approval for the Generating Facility. • Request the EDC to witness the commissioning test. Within ten (10) Business Days of the receipt of the Municipal approval, the EDC will witness the commissioning test and following successful completion of that test, the EDC will send a final approval authorizing the interconnection to the Generator. 3
  2. Page 6 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 6 of 74 SECTION 1 The following Interconnection Process Flow Chart provides an overview of the steps necessary for a successful interconnection: Figure 1: Interconnection Process Flow Chart Pre-Application Discussion & Scoping meeting & Application Submital Application Request Complete Customer submits all information No No Application Withdrawn Yes Yes Inverter based & Certified =2 MW No Conduct Application Review (30 Business Days) Generator => 5 MW Yes No Passes Screen Studies Required No Yes Yes ISO-NE Generator Interconnection Process (I.3.9 ) Conduct Studies as appropriate: 1-Feasibility Study 2-Impact Study 3- Facility Study 4- Transmission Studies No Yes Conduct Application Review (15 Business Days) No Yes Customer Signs IA & authorizes EDC modification Yes Customer installs generator and returns certificate of completion to EDC Witness Commissioning Test Studies Completed EDC issues final approval to energize. Additional Process Steps for Generators greater than 5 MW: Regardless of the Interconnection jurisdiction, each Generator wishing to interconnect a Generating Facility larger than 5 MW must comply with the ISO-NE Planning Procedure 5 (PP5), which is the procedure for a Proposed Plan Application (PPA) under Section I.3.9 of the ISO-NE Tariff. This process must be completed before the Generator may Interconnect such Generating Facility. It is important to note that the PPA process is an ISO-NE requirement, even if the Interconnection of such facility falls under state jurisdiction. 4
  3. Page 7 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 7 of 74 SECTION 1 While the Generator is ultimately responsible for the PPA application and the associated data to be submitted to ISO-NE, the EDC will provide support to the Generator if the Generator is not a “Governance Participant” (as such term is defined in the Participants Agreement; among ISO-NE and the New England Power Pool) at the time the PPA is submitted to the EDC. Typically, the EDC will file the PPA on behalf of such nonGovernance Participant Generator. Additionally, the EDC will represent such Generator in ISO-NE proceedings in accordance with the current ISO-NE rules; provided, however, that such Generator shall remain solely responsible for, among other things: (a) the completion of the PPA and the accuracy of the information contained therein, (b) the advance payment based on a non-binding good faith estimate of all costs in connection with any required Transmission System Impact Study, and (c) the payment of all costs associated with transmission upgrades identified through the ISO-NE approval process. Each non-Governance Participant Generator wishing to Interconnect a Generating Facility larger than 5 MW must read and be familiar with PP5, Section I.3.9 of the ISONE Tariff and other relevant ISO-NE guidance on the PPA process. Further, such nonGovernance Participant Generator can communicate directly with ISO-NE to seek assistance concerning the applicable PPA requirements and associated issues. For non-Governace Participant Generators the EDC notifies ISO-NE of receipt of the Interconnection Application, under current ISO-NE practice. Further, the EDC submits a complete copy of the PPA application to ISO-NE in order to secure an ISO-NE queue position. An ISO-NE queue position will not be established by ISO-NE until all the data required by ISO-NE is complete. Governance Participants are responsible for filing their own PPA with the ISO-NE and representing themselves in connection with all ISO-NE proceedings. Interconnection Process for Generators greater than 20 MW: The time frames and processes described in these guidelines are applicable to Generating Facilities smaller than 20 MW and represent the majority of Distribution interconnections. Generating Facilities larger than 20 MW are only rarely interconnect to the EPS. However, from time to time the EDC will receive requests for Interconnecting Generating Facilities greater than 20 MW seeking an interconnection to the EPS. When this situation occurs and provided that an interconnection to the EPS is feasible and appropriate, the EDC will use these Guidelines; however, the time frames to conduct the Application Review and Studies will be adjusted in accordance with the ISO-NE Tariff, Schedule 22. 5
  4. Page 8 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 8 of 74 SECTION 2 2.0 Pre Application 2.1. After presenting a proposed Interconnection project for a specific site, the Generator may request information regarding the application process from an EDC Facilitator. The most current contact information for EDC Facilitators is available on each EDC’s website listed below. 2.2 The EDC Facilitator will serve as the primary point of contact for all Interconnections. Copies of these Guidelines, information and forms can be obtained from the EDC Facilitator . 2.3 The EDC Facilitator for Eversource can be contacted: by phone: [phone removed]; or by mail or courier: Eversource Energy Distributed Energy Resources Department P.O. Box 1409 Hartford, CT 06143-1409 Updated information regarding EDC Facilitator contact information can be found at https://www.eversource.com/content/ct-c/about/about-us/doing-business-withus/builders-contractors/interconnections . 2.4 The EDC Facilitator for UI can be contacted: via email: [email removed] by phone: [phone removed]; or by mail or courier: The United Illuminating Company Distributed Energy Resources Department 180 Marsh Hill Rd. Orange, CT 06477 Updated information regarding EDC Facilitator contact information can be found at https://www.uinet.com 6
  5. Page 9 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 9 of 74 SECTION 3 3.0 Application 3.1 Applicability 3.1.1 These Guidelines are applicable to Interconnection Requests for Generating Facilities which fall under DPUC jurisdiction. Generators unsure as to whether the proposed Interconnection is subject to these Guidelines should contact the appropriate EDC Facilitator. 3.1.2 Requests for Interconnection received by an EDC shall be processed as follows: 3.1.2.1 A request to interconnect a certified inverter-based Generating Facility no larger than 20 kW shall be evaluated under the “Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities, 20 kW (ac) or Less.” 3.1.2.2 A request to interconnect a Generating Facility no larger than 2 MW shall be evaluated under either the Fast Track Process (Section 4) or the Study Process (Section 5). A description of certification criteria is set forth in Attachment I. 3.1.2.3 A request to interconnect a Generating Facility larger than 2 MW or a Generating Facility that does not meet the criteria for the Fast Track Process shall be evaluated under the Study Process (Section 5). 3.2 . Interconnection Request 3.2.1 Prior to making an Interconnection Request, Generators should contact the EDC Facilitator to determine where to apply. If an Interconnection Request is sent to an EDC in error (e.g., ISO-NE jurisdiction or wrong EDC) the EDC will return such Interconnection Request to the Generator. 3.2.2 An Interconnection Request must be in the form of Attachment I, and addressed to the appropriate EDC Facilitator. A processing fee is required with each Interconnection Request. The applicable fee is as follows: Table 1 Fees Process Generator Applicability Fast Track (1) 0-2 MW, unless Generating Facility does not qualify for the Fast Track process, or (2) is 20 kW or less, certified 7 Application Fee $500 Each Study Fee Actual Cost Based
  6. Page 10 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 10 of 74 SECTION 3 but did not pass the 20 kW or Less screen(s). Study 3.3 (1) is larger than 2 MW but no larger than 20 MW, (2) is 2 MW or less and is not certified, or (3) is 2 MW or less and is certified but did not pass the Fast Track Process. $1000 Actual Cost Based 3.2.3 The Interconnecting EDC shall date- and time-stamp the Interconnection Request upon receipt. Such date- and time-stamp shall used for the purposes of the timetables set forth in these Guidelines. 3.2.4 Within three (3) Business Days of the receipt of the Interconnection Request, the Interconnecting EDC shall confirm receipt of such Interconnection Request using the form attached hereto as Attachment II. 3.2.5 Within ten (10) Business Days of the receipt of the Interconnection Request, the Interconnecting EDC shall notify the Generator if such Interconnection Request is incomplete using the form attached hereto as Attachment III. The Generator will have fifteen (15) Business Days from the date of such notice to submit the listed information or to request an extension of time to provide such information. If the Generator does not provide the listed information or a request for an extension of time within such fifteen (15) day period, then the Interconnection Request will be deemed withdrawn, and such deemed withdrawal shall be subject to Section 3.8. An Interconnection Request will be deemed complete upon receipt of the listed information by the Interconnecting EDC. Insurance Requirements Generators interconnecting a Generating Facility to the EPS of an EDC shall maintain general liability insurance in the amounts set forth in the following table, per Interconnection at all times during the Interconnection. Liability Insurance Nameplate Rating* Less than 100 kW Minimum Liability Insurance Required $300,000 Greater than 100 kW to 1 MW Greater than 1 MW to 5 MW $1,000,000 $2,000,000 8
  7. Page 11 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 11 of 74 SECTION 3 Greater than 5 MW $5,000,000 *All Nameplate Ratings are based on aggregate generation at the site. 3.3.1 General Liability: In connection with Generator’s performance of its duties and obligations under the Interconnection Agreement, Generator shall maintain, at all times during the Interconnection, general liability insurance with a combined single limit of not less than: Three hundred thousand dollars ($300,000) per occurrence and in the aggregate for bodily injury and/or property damage claims where the Gross Nameplate Rating of the Generators Facility is less than or equal to 100 kW. One million dollars ($1,000,000) per occurrence and in the aggregate for bodily injury and/or property damage claims where the gross nameplate rating of the Generators Facility is greater than 100 kW and less than or equal to 1 MW. Two million dollars ($2,000,000) per occurrence and in the aggregate for bodily injury and/or property damage claims where the gross nameplate rating of the Generators Facility is greater than 1 MW and less than or equal to 5 MW. Five million dollars ($5,000,000) per occurrence and in the aggregate for bodily injury and/or property damage claims where the gross nameplate rating of the Generators Facility is greater than 5 MW and less than or equal to 20 MW. 3.3.2 Insurer Requirements and Endorsements All required insurance shall be carried by reputable insurers qualified to underwrite insurance in Connecticut. In addition, all insurance shall: (a) include the EDC as an additional insured for all Generating facilities greater than 1 MW; (b) contain a severability of interest clause or cross-liability clause; (c) provide that the EDC shall not incur liability to the insurance carrier for payment of premium for such insurance; and (c) provide for thirty (30) Calendar Days’ written notice to the EDC prior to cancellation, termination, or material change of such insurance. 3.3.3 Evidence of Insurance Evidence of the insurance required shall state that coverage provided is primary, and is not in excess of or contributing with any insurance or self-insurance maintained by the EDC. The Generator is responsible for providing the EDC with evidence of insurance in compliance with this Guideline on an annual basis. Prior to the EDC commencing work on system modifications, the Generator shall have its insurer furnish to the EDC certificates of insurance evidencing the insurance coverage required above. The Generator shall notify and send to the EDC a certificate of insurance for any policy written on a "claims-made" basis. The EDC may at its discretion require the 9
  8. Page 12 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 12 of 74 SECTION 3 Generator to maintain tail coverage for three years on all policies written on a "claims-made" basis. All insurance certificates, statements of self insurance, endorsements, cancellations, terminations, alterations, and material changes of such insurance shall be issued and submitted to the appropriate EDC Facilitator. 3.4 Infrastructure Security The security of the electric system infrastructure is essential. FERC requires the EDCs, market participants, and Generating Facilities interconnected with an EDC’s EPS to comply with the recommendations offered by the National Infrastructure Advisory Council and best practice recommendations from NERC. All public utilities must meet basic standards for electric system infrastructure and operational security, including physical, operational, and cyber-security practices where required. Interconnection Requests will be reviewed in light of infrastructure security concerns. 3.5 Modification Any modification to machine data, equipment configuration or the Interconnection site not agreed to in writing by the Interconnecting EDC may be deemed a withdrawal of the Interconnection Request. In the event of a deemed withdrawal, the provisions of Section 3.8 shall apply. 3.6 Site Control Documentation evidencing site control must be submitted with the Interconnection Request. Site control may be demonstrated through: 3.7 3.6.1 Ownership of, a leasehold interest in, or a right to develop a site for the purpose of constructing the Generating Facility; 3.6.2 An irrevocable option to acquire any of the property rights set forth in Section 3.6.1; or 3.6.3 An exclusivity or other business relationship between the Generator and an entity having the right to sell, lease, or grant the Generator the right to possess or occupy a site for such purpose; or 3.6.4 Filed applications for required permits with respect to a site on Federal or State property. Queue Position 3.7.1 The Interconnecting EDC shall assign to each Interconnection Request a queue position based upon date of the date-stamp described in Section 3.2.3. The queue position of each Interconnection Request will be used to determine the cost responsibility for any upgrades necessary to accommodate the Interconnection. The EDC shall maintain a single Distribution queue. 10
  9. Page 13 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 13 of 74 SECTION 3 3.8 Withdrawal 3.8.1 The Generator may withdraw its Interconnection Request at any time by written notice of such withdrawal to the Interconnecting EDC. 3.8.2 In addition, if the Generator fails to adhere to all requirements of these Guidelines, subject to Section 3.8.3, the Interconnecting EDC shall deem the Interconnection Request to be withdrawn and shall provide written notice to the Generator of the deemed withdrawal and an explanation of the reasons for such deemed withdrawal. 3.8.3 Upon receipt of such written notice, if the Generator wishes to dispute the withdrawal notice, the Generator shall have fifteen (15) Business Days in which to either respond with information or actions that cure the deficiency or to notify the Interconnecting EDC of its intent to pursue dispute resolution in accordance with Section 6.2. 3.8.4 Withdrawal of an Interconnection Request shall result in the loss of queue position assigned to such Interconnection Request. 3.8.5 If a Generator disputes such withdrawal and loss of queue position, then the Generator’s Interconnection Request shall be removed from the queue until such time that the outcome of the dispute restores its queue position. 3.8.6 Within thirty (30) days following a withdrawal, a Generator that withdraws or is deemed to have withdrawn its Interconnection Request shall pay to the Interconnecting EDC and any Affected Parties all costs prudently incurred with respect to such Interconnection Request prior to the receipt of notices described Section 3.8.1 or 3.8.2, as the case may be. 3.8.7 A Generator who fails to pay all monies due pursuant to Section 3.8.6 shall not be eligible to obtain any Interconnection Study reports or submit subsequent Interconnection Requests. 11
  10. Page 14 of 74

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 14 of 74 SECTION 4 4.0 Fast Track Process 4.1 Applicability The Fast Track Process is available to any Generator proposing to interconnect its Generating Facility with the Distribution System if (a) the proposed Generating Facility is 20 kW or less, certified, but did not pass the 20 kW or less screen(s) (b) the proposed Generating Facility is no larger than 2 MW and (c) the proposed Generating Facility (i) meets the Codes and Standards and other certification requirements of these Guidelines or (ii) is determined to be safe to operate by the Interconnecting EDC, in its sole discretion. 4.2 Initial Review Within fifteen (15) Business Days after the Interconnecting EDC notifies the Generator it has received a complete Interconnection Request, the Interconnecting EDC shall perform an initial review using the screens set forth below, shall notify the Generator of the results, and include with the notification copies of the analysis and data underlying the determinations under the screens. 4.2.1 The EDC will use the following criteria for performing screening evaluations: 4.2.1.1 For Interconnection of a proposed Generating Facility to a radial distribution circuit, the aggregated generation, including the proposed Generating Facility, on the circuit shall not exceed fifteen percent (15%) of the Line Section annual peak load as most recently measured at the substation. A line section is that portion of an Interconnecting EDC’s electric system connected to a customer bounded by automatic sectionalizing devices or the end of the distribution line. 4.2.1.2 For Interconnection of a proposed Generating Facility to the load side of Spot Network protectors, the proposed Generating Facility must utilize an inverter-based equipment package and, together with the aggregated other inverter-based generation, shall not exceed the lesser of five percent (5%) of a Spot Network's maximum load or 50 kW. 4.2.1.3 For Interconnection of a proposed Generating Facility to the load side of an area network, the following screen will be conducted: a) The unit is a Certified Inverter-based generator or inverter based using a utility grade relay package exclusively in its design. 12

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026