Interrogatory responses
Answers to questions 1, 2, 4, 10, 18, 20
Files13
ICC-001_Final.pdf
PDF · 114 KB · 1 pageText searchable
Download ICC-001_Final.pdfRead the text of ICC-001_Final.pdf
ICC-001 Attachment 1.pdf
PDF · 3.4 MB · 28 pagesText searchable
Download ICC-001 Attachment 1.pdfRead the text of ICC-001 Attachment 1.pdf
ICC 001 Attachment 2.pdf
PDF · 4.0 MB · 68 pagesText searchable
Download ICC 001 Attachment 2.pdfRead the text of ICC 001 Attachment 2.pdf
ICC-001 Attachment 3.pdf
PDF · 1.1 MB · 34 pagesText searchable
Download ICC-001 Attachment 3.pdfRead the text of ICC-001 Attachment 3.pdf
ICC-001 Attachment 4.pdf
PDF · 1.3 MB · 34 pagesText searchable
Download ICC-001 Attachment 4.pdfRead the text of ICC-001 Attachment 4.pdf
ICC-001 Attachment 5.pdf
PDF · 3.5 MB · 67 pagesText searchable
Download ICC-001 Attachment 5.pdfRead the text of ICC-001 Attachment 5.pdf
ICC-002_Final.pdf
PDF · 143 KB · 2 pagesText searchable
Download ICC-002_Final.pdfRead the text of ICC-002_Final.pdf
ICC-002 Attachment 1.pdf
PDF · 1.1 MB · 29 pagesText searchable
Download ICC-002 Attachment 1.pdfRead the text of ICC-002 Attachment 1.pdf
ICC-002 Attachment 2.pdf
PDF · 1.5 MB · 74 pagesText searchable
Download ICC-002 Attachment 2.pdfRead the text of ICC-002 Attachment 2.pdf
ICC-002 Attachment 3.pdf
PDF · 2.5 MB · 27 pagesText searchable
Download ICC-002 Attachment 3.pdfRead the text of ICC-002 Attachment 3.pdf
ICC-004_Final.pdf
PDF · 127 KB · 1 pageText searchable
Download ICC-004_Final.pdfRead the text of ICC-004_Final.pdf
ICC-010_Final.pdf
PDF · 168 KB · 4 pagesText searchable
Download ICC-010_Final.pdfRead the text of ICC-010_Final.pdf
ICC-018_Final.pdf
PDF · 135 KB · 2 pagesText searchable
Download ICC-018_Final.pdfRead the text of ICC-018_Final.pdf
Text of ICC-001 Attachment 3.pdf
Extracted from the file · 34 pages · 76,972 characters
Text of ICC-001 Attachment 4.pdf
Extracted from the file · 34 pages · 72,650 characters
Text of ICC-001 Attachment 5.pdf
Extracted from the file · 67 pages · 136,480 characters
Text of ICC-002_Final.pdf
Extracted from the file · 2 pages · 2,788 characters
Text of ICC-002 Attachment 1.pdf
Extracted from the file · 29 pages · 46,015 characters
Page 61 of 74
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 61 of 74 ATTACHMENT VI FACILITY STUDY AGREEMENT IN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed by their duly authorized officers or agents on the day and year first above written. [Insert name of the Generator] ___________________________________ Signed______________________________ Name (Printed): ___________________________________ Title_______________________________ [Insert name of the EDC] ___________________________________ Signed______________________________ Name (Printed): ___________________________________ Title_______________________________ VI-6Page 62 of 74
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 62 of 74 ATTACHMENT VI FACILITY STUDY AGREEMENT EXHIBIT A DATA The Facility Study shall be based upon the conclusions of the System Impact Study(ies), and the following data provided by Generator: VI-7Page 63 of 74
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 63 of 74 ATTACHMENT VII CONTINGENT APPROVAL TO INTERCONNECT Contingent Approval to Interconnect ( Eversource Energy/UI Use Only) Elec. Inspector Signoff/ Copy of Inspection Sticker Signed IA’s Witness Test Date Cured: __________ Date Cured: __________ Date Cured: __________ Interconnection of the Generating Facility is approved contingent upon compliance with the Interconnection Agreement (Exhibit A) and the Generator’s return of a completed Certificate of Completion. Electric Distribution Company Name: __________ Electric Distribution Company Signature: __________ Print Name: __________ Title: _________________________________Date: __________ Application ID number: __________ Generator Name____________________________ Electric Distribution Company waives inspection/witness test? Yes___No__ VII-1Page 64 of 74
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 64 of 74 ATTACHMENT VIII APPROVAL TO ENERGIZE Approval to Energize the Generating Facility ( Eversource Energy/UI Use Only) Energizing the Generating Facility is approved contingent upon ongoing compliance with the Interconnection Agreement and Final Approval for ________________________________________________________________________ ______________________________________________________ Generating Facility. Electric Distribution Company Name:________________________________________ Electric Distribution Company Signature:_____________________________________ Print Name:____________________________________ Date: __________ Title: VIII-1Page 65 of 74
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 65 of 74 ATTACHMENT IX Certification of Small Generator Equipment Packages 1.0 Small Generating Facility equipment proposed for use separately or packaged with other equipment in an interconnection system shall be considered certified for interconnected operation if (1) it has been tested in accordance with industry standards for continuous utility interactive operation in compliance with the appropriate codes and standards referenced below by any Nationally Recognized Testing Laboratory (NRTL) recognized by the United States Occupational Safety and Health Administration to test and certify interconnection equipment pursuant to the relevant codes and standards listed in Attachment X (2) it has been labeled and is publicly listed by such NRTL at the time of the interconnection application, and (3) such NRTL makes readily available for verification all test standards and procedures it utilized in performing such equipment certification, and, with consumer approval, the test data itself. The NRTL may make such information available on its website and by encouraging such information to be included in the manufacturer’s literature accompanying the equipment. 2.0 The Generator must verify that the intended use of the equipment falls within the use or uses for which the equipment was tested, labeled, and listed by the NRTL. 3.0 Certified equipment shall not require further type-test review, testing, or additional equipment to meet the requirements of this interconnection procedure; however, nothing herein shall preclude the need for an on-site commissioning test by the parties to the interconnection nor follow-up production testing by the NRTL. 4.0 If the certified equipment package includes only interface components (switchgear, inverters, or other interface devices), then the Generator must show that the generator or other electric source being utilized with the equipment package is compatible with the equipment package and is consistent with the testing and listing specified for this type of interconnection equipment. 5.0 Provided the generator or electric source, when combined with the equipment package, is within the range of capabilities for which it was tested by the NRTL, and does not violate the interface components' labeling and listing performed by the NRTL, no further design review, testing or additional equipment on the customer side of the point of common coupling shall be required to meet the requirements of this interconnection procedure. 6.0 An equipment package does not include equipment provided by the utility. 7.0 Any equipment package approved and listed in a state by that state’s regulatory body for interconnected operation in that state prior to the effective date of these small generator interconnection procedures shall be considered certified under these procedures for use in that state. IX-1Page 66 of 74
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 66 of 74 ATTACHMENT X CODES AND STANDARDS The following existing codes and standards (in addition to any successor codes and standards) shall be applied as appropriate: ANSI C12.1-2001 “American National Standard for Electric Meter Code for Electricity Metering” ANSI C12.11-1993 “Instrument Transformers for Metering 15 kV and Below” ANSI C84.1-1995 Electric Power Systems and Equipment – Voltage Ratings (60 Hertz) ANSI/IEEE C37.90-1989 IEEE Standard “Relays and Relay Systems Associated with Electric Power Apparatus” ANSI/IEEE C37.90-1-1989 IEEE Standard “Surge Withstand Capability [SWC] Tests for Protective Relays and Relay Systems” ANSI/IEEE C57.13-1987 “Requirements for Instrument Transformers” ANSI/IEEE Std C37.90.2 (1995), IEEE Standard “Withstand Capability of Relay Systems to Radiated Electromagnetic Interference from Transceivers” ANSI/IEEE C62.41-1991 “Recommended Practice on Surge Voltages in Low Voltage AC Power Circuits” ANSI/IEEE Std C62.41.2-2002, IEEE Recommended Practice on Characterization of Surges in Low Voltage (1000V and Less) AC Power Circuits ANSI/IEEE Std C62.45-1992 (R2002), IEEE Recommended Practice on Surge Testing for Equipment Connected to Low-Voltage (1000V and Less) AC Power Circuits IEC 1000-4-15 Flicker meter- Functional and Design Specifications IEC 61400-21 Wind Turbine Generator Systems IEC 61400-21 Part 21 Measurement and Assessment of Power Quality Characteristics of Grid Connected Wind Turbines IEEE Std p1453 Draft, Recommended Practices for Measurement and Limits of Voltage Flicker on AC Power Systems IEEE p 1547.1 Drafts Std for Conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power Systems IEEE p 1547.2 Draft Application Guide for IEEE Standard 1547 for Interconnecting Distributed Resources with Electric Power Systems X-1Page 67 of 74
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 67 of 74 ATTACHMENT X CODES AND STANDARDS IEEE p 1547.3 Draft Guide for Monitoring, Information Exchange and Control of DR Interconnection with Electric Power Systems IEEE 1547-2018 IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems. IEEE Std 100-2000, IEEE Standard Dictionary of Electrical and Electronic Terms IEEE Std 519-1992, IEEE Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems IEEE Std C37.108-1989 (R2002), IEEE Guide for the Protection of Network Transformers IEEE Std C57.12.44-2000, IEEE Standard Requirements for Secondary Network Protectors National Electrical Code, NFPA/ANSI 70 (Note: As adopted by State of CT) NEMA MG 1-1998, Motors and Resources, Revision 3 UL (Underwriters Laboratories) Std 1741- 2007, Inverters, Converters and Charge Controllers for Use in Independent Power Systems ANSI/ IEEE C37.90.3 IEEE C37.98 Seismic Testing (fragility) of Protective and Auxiliary Relays ANSI C37.2 Electric Power System Device Function Numbers IEC 255-21-1 Vibration IEC 255-22-2 Electrostatic Discharge IEC 255-5 Insulation (Impulse Voltage Withstand) X-2Page 68 of 74
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 68 of 74 ATTACHMENT XI GLOSSARY ANSI: American National Standards Institute. Affected Party or Parties: The entity that owns, operates or controls an Affected System, or any other entity that otherwise may be a necessary party to the Interconnection process. Affected System: Any electric system that is within the EDC service territory, including, but not limited to generator owned electric facilities, or any other electric system that is not within the EDC service territory that may be affected by the proposed Interconnection. Applicable Laws and Regulations: All duly promulgated applicable federal, state and local laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or judicial or administrative orders, permits and other duly authorized actions of any Governmental Authority. Applicable Reliability Standards: The requirements and guidelines of NERC, NPCC and the New England Control Area, ISO, ISO-NE, including publicly available local reliability requirements of Interconnecting EDC or other Affected Systems, and any successor documents. Application Review: A review by the EDC of the completed Interconnection Request Form to determine if a Feasibility, Impact and Facility Studies are required. Area Network: See Low Voltage Secondary Network Grid System Business Day: Monday through Friday, excluding Federal Holidays. Calendar Day: Shall mean any day including Saturday, Sunday, Federal and State Holidays. CL&P: The Connecticut Light and Power Company, the EDC that provides service to all of Connecticut except for (a) the towns serviced by UI and (b) the towns of Wallingford, Norwich, Bozrah and certain parts of Groton, Norwalk, and Lebanon. Codes and Standards: The codes and standards set forth on Attachment IX hereto. Commercial Operation Date: The date on which the Generator commences commercial operation of the unit after the unit has been commissioned and likely to be associated with a specific date that is identified in a purchase power agreement or the date that the power transaction starts. Communications Costs: Any costs associated with installing, testing, and maintaining the communications infrastructure necessary to provide protection and/or monitoring for the generating facility. Contract Path: A specific contiguous electrical path from a point of receipt to a point of delivery for which EPS rights have been contracted. Default: The failure of a breaching Party to cure its breach under the Generator Interconnection Agreement. XI-1Page 69 of 74
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 69 of 74 ATTACHMENT XI GLOSSARY Distribution System: The Interconnecting EDC’s facilities and equipment used to transmit electricity to ultimate usage points such as homes and industries. The voltage levels at which Distribution Systems generally operate at 69 kV and less. Distribution System Impact Study (DSI Study): An engineering study that evaluates the impact of the proposed Interconnection on the safety and reliability of the EPS. The study shall identify and detail the system impacts that would result if the Generating Facility were interconnected without project modifications or system modifications, focusing on the adverse system impacts identified in the Interconnection Feasibility Study, or to study potential impacts, including but not limited to those identified in the Scoping Meeting. DPUC: Connecticut Department of Public Utility Control. EDC: An electric distribution company, either Eversource Energy or UI. EDC Facilitator: A facilitator designated by an EDC to be its primary point of contact for any Interconnection. EPS: The electric power system, consisting of all electrical wires, equipment, and other facilities owned or provided by the EDC to provide distribution service to the EDC’s customers. Eversource Energy: Eversource Energy provides service to all of Connecticut except the towns supplied by UI, and the towns of Wallingford, Norwich, Bozrah and parts of Groton, Norwalk, and Lebanon. Facility Study: The study conducted by the EDC to determine the scope and costs of required modifications and upgrades to the EPS and/or a Generating Facility necessary for an Interconnection of such Generating Facility. Fault: An equipment failure, short circuit, or other condition resulting from abnormally high amounts of current from the power source. Feasibility Study: A preliminary study to assess the feasibility of interconnecting the Generating Facility to the EPS. FERC: Federal Energy Regulatory Commission. Generator: The owner and/or operator of a Generating Facility. Generating Facility: The device used for the production of electricity identified in the Interconnection Request, but shall not include the Generating Facility’s Interconnection Facilities. Generating Facility Capacity: The maximum gross megawatt electrical output at an ambient temperature of 20 degrees Fahrenheit of the Generating Facility or the aggregate maximum gross megawatt electrical output of the Generating Facility at an ambient temperature of 20 degrees Fahrenheit where it includes multiple energy production devices. XI-2Page 70 of 74
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 2 Page 70 of 74 ATTACHMENT XI GLOSSARY Good Utility Practice: The practices, methods and acts engaged in or approved by a significant portion of the electric industry during the relevant time period, or any of the practices, methods and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Good Utility Practice is not intended to be limited to the optimum practice, method, or act to the exclusion of all others, but rather to be acceptable practices, methods, or acts generally accepted in the region. Guidelines: The “Guidelines for Generator Interconnection: Fast Track and Study Process,” prepared by Eversource Energy and UI to describe the protocols and procedures for interconnecting to the EPS. IEEE: Institute of Electrical and Electronics Engineers. Independent System Operator (ISO): An entity supervising the collective transmission facilities of a power region; the ISO is charged with nondiscriminatory coordination of market transactions, system-wide transmission planning, and bulk power network reliability. Induction Generator: An induction generator is a rotating AC machine that operates above synchronous speed over its range of power output. The faster it is driven above synchronous speed by a prime mover, the more electrical power is generated. Excitation is provided by the utility in the form of reactive power. The induction generator normally loses its ability to produce voltage and power output when it is isolated from the utility since it loses its source of excitation. In-Service Date: The date on which the Generating Facility and system modification (if applicable) are complete and ready for service, even if the Generating Facility is not placed in service on such date. Intentional Islanding: Intentional Islanding occurs when the Generating Facility has been isolated from the EPS by planned operation of disconnecting means consistent with the Technical Requirements and the Generating Facility as a result is serving segregated load(s) on the Generating Facility's side of the Point of Interconnection. Interconnecting EDC: The EDC (i) to which an appropriate Interconnection Request is made or (ii) owning or providing the EPS to which an Interconnection is made. Interconnection: The physical connection of a Generating Facility to the EPS so that parallel operation can occur. Interconnection Agreement: A written agreement between a Generator and the Interconnecting EDC setting forth the terms, conditions, obligations and rights with respect to an Interconnection. An Interconnection Agreement is required to be signed by the Generator and the EDC before parallel operation of the Generating Facility may commence. Note: the form of Interconnection Agreement is attached to these Guidelines as Exhibit A. XI-3
Text of ICC-002 Attachment 3.pdf
Extracted from the file · 27 pages · 91,051 characters
Text of ICC-004_Final.pdf
Extracted from the file · 1 page · 983 characters
Text of ICC-010_Final.pdf
Extracted from the file · 4 pages · 11,507 characters
Text of ICC-018_Final.pdf
Extracted from the file · 2 pages · 2,628 characters
As listed on the current system
Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026