Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

Text of ICC-001 Attachment 5.pdf

Extracted from the file · 67 pages · 136,480 characters

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

  1. Page 11 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 11 of 27 4.3.5.1 The Generator shall use one or more synchronizing devices such as motorized breakers, contactor/ breaker combinations, or a fused contactor (if mutually agreeable) to connect the Generating Facility to the EPS. This synchronizing device shall not be the Interconnection interrupting device. This synchronizing device shall be capable of interrupting the current produced when the Generating Facility is connected out of phase with the EPS consistent with IEEE 1547-2003, Section 4.1.8.3. 4.3.5.2 All synchronizing shall be done by the Generator at the Generating Facility. The Generating Facility shall not be used to energize a de-energized EDC circuit. 4.3.5.3 In-line breakers, contactors, or switches without synchronizing devices require electrical or mechanical interlocks to prevent out-of-phase closing with the EPS. 4.3.5.4 All synchronizing schemes used for interconnecting a Generating Facility with the EPS must conform to the synchronizing requirements of the latest version of IEEE 1547. Automatic synchronizing schemes are preferred. 4.4 Additional Requirements for Induction Generators Unless the EDC shall determine otherwise, there are no additional protection requirements applicable only to Induction Generators. 4.5 Additional Requirements for Synchronous Generators 4.5.1 The following additional relay functions are required for Synchronous Generators. Settings for these relays shall be submitted to the EDC for review. See Appendix 4.2.8A for setting guidance. 4.5.1.1 51V Over-Current (Voltage Control or Restrained). This element provides backup phase over-current protection for system faults under a collapsed voltage condition. 4.5.1.2 59G Over-Voltage (Ground). This element detects ground faults in the event that a ground N over-current source is lost. When studies show it can operate reliably, an alternative to the 59G is a 51N over-current (Ground). This element provides ground over-current protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value. 4.5.1.3 25 Synchronizing or Synch-Check. This element supervises the operation of the Generator automatic or manual synchronizing system by ensuring proper voltage phase angle matching and, where appropriate, slip frequency between the EPS and the Generating Facility before the breaker is allowed to close. 4.5.2 Any or all of the following additional relay functions may be required by the EDC. Settings for these relays shall be submitted to the EDC for review. See Appendix A for setting guidance. 4.5.2.1 32R Reverse Power. This element is used on systems designed as import only systems to ensure no power is exported onto the EPS. 4.5.2.2 32U Under-Power. This element performs a similar function to the 32R element, except it ensures the Generating Facility is always importing some level of power. 4.5.2.3 46 Negative Sequence Current. This element serves to protect both the EPS and the Generator system from system unbalances including single phasing. 4.5.2.4 51 Phase Over-Current. This element provides over-current protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value.
  2. Page 12 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 12 of 27 4.5.2.5 51N Ground Over-Current. This element provides ground over-current protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value. 4.5.2.6 67 Directional Phase Over-Current. This element provides directional phase overcurrent protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value in a specified direction. 4.5.2.7 67N Directional Ground Over-Current. This element provides directional ground over-current protection and operates with an inverse time-current characteristic when its current exceeds a predetermined value in a specified direction. 4.5.2.8 86 Lockout Relay. This auxiliary relay is electrically tripped by the Generating Facility protection and in turn trips the isolating circuit breaker(s). It can only be reset manually after all protective trips have been cleared. 4.5.3 Synchronizing Devices 4.5.3.1 The Generator shall designate one or more synchronizing device(s) such as motorized breakers, contactor/breaker combinations, or a fused contactor (if mutually agreeable) to be used to connect the Generating Facility to the EPS. This synchronizing device may be a device other than the Interconnection interrupting device. The synchronizing device must be capable of interrupting the current produced when the Generating Facility is connected out of phase with the EPS consistent with IEEE 1547-2003, Section 4.1.8.3 as amended from time to time. 4.5.3.2 All synchronizing will be done by the Generator at the Generating Facility. The Generating Facility shall not be used to energize a de-energized EDC circuit. 4.5.3.3 In-line breakers, contactors, or switches without synchronizing devices require electrical or mechanical interlocks to prevent out-of-phase closing with the EPS. 4.5.3.4 All synchronizing schemes used for interconnecting a Generating Facility with the EPS must conform to the synchronizing requirements within the current version of IEEE 1547. Automatic synchronizing schemes are preferred. 4.5.4 4.6 The Generator shall provide relaying functions to clear both phase and ground short circuit faults on the EDC’s distribution circuit. The operating characteristics thereof shall be subject to review and approval by the EDC. Closed Transition Generators 4.6.1 A closed transition, “make-before-break” Generating Facility must be synchronized with the EPS prior to transfer occurring. The transfer scheme will then parallel the Generating Facility with the EPS for less than 100 milliseconds. During this brief period, the load will be either transferred to the Generating Facility from the EPS or to the EPS from the Generating Facility. The design of the transfer scheme shall prevent the possibility of sustained parallel operation of the Generating Facility with the EPS. 4.6.2 The closed transition scheme and transition equipment used by the Generator must be reviewed and approved by the EDC prior to operation of the Generating Facility. The closed transition scheme must provide voltage, frequency and phase angle matching as appropriate to provide a smooth transition. It must also provide maximum paralleling time protection. This protection is described below in Section 4.6.3. 4.6.3 Protective relays isolating the Generating Facility from faults in the EPS shall not be required if the paralleling operation is automatic and takes place for less than 100 milliseconds. Maximum paralleling time protection must be provided by a separate device from the equipment used for control and paralleling of the generator and operation of the transfer switch. (See Appendix B for details on the required logic for this protection.) This
  3. Page 13 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 13 of 27 protection shall (i) use a discrete solid state timer (pneumatic timers are unacceptable for this purpose), (ii) be powered by the generator battery and (iii) trip an interrupting device (which may be the generator breaker) that ceases parallel operation of the generator. This requirement shall prevent sustained operation should the control equipment malfunction. 4.6.4 The parallel operation of a closed transition Generating Facility lasting 100 milliseconds or more requires the same protective relay functions as would a Generating Facility operating in sustained parallel operation with the EPS as described in these Technical Requirements. 4.6.5 The Generator, at a minimum, must perform the following functional tests after its transfer equipment has been energized, but before the closed-transition transfer is allowed on the EPS as a normal operation: 4.6.5.1 Voltage, frequency, and phase rotation; 4.6.5.2 Transfer test (maximum paralleling time must be less than 100 milliseconds); and 4.6.5.3 Excessive parallel time test (when the EDC source switch fails to open), the protection must trip an interrupting device (which may be the Generating Facility’s breaker) that ceases parallel operation of the generator. The EDC must be notified ten (10) Business Days in advance of such testing so that it may, at its option, have its personnel observe the testing, and/or inspect the installation. 4.6.6 4.7 Before the approval of closed-transition transfer is granted by the EDC, the Generator must provide to the EDC a report attesting to the successful completion of the above testing. Upon receipt by the EDC of the approved test and inspection reports, along with a verification of the local Electrical Inspector’s approval, the EDC will issue a written notice of approval of closed-transition transfer to the Generator. Open Transition Generating Facilities Connection of a Generating Facility with open transition transfer does not require an Interconnection Application and is permissible on the condition that such Generating Facility’s manual or automatic transfer switch will not allow any parallel operation of the Generating Facility with the EPS. This electrical state (i.e., open transition transfer) is typically referred to as “break-before-make,” which means that the Generating Facility’s transfer switch must be designed and operated to prevent the EPS-provided power and the Generating Facility-provided power from powering the Generator’s facility circuits (i.e., load) at the same time. Consequently, this mode of operation will also prevent the Generating Facility from potentially energizing the EPS. 4.8 Special Protection Systems 4.8.1 The EDC May Require Direct Transfer Trip (DTT) Whenever: 4.8.1.1 The minimum load to generation on a circuit creates the possibility that an unacceptable abnormal operating condition could occur; 4.8.1.2 It is determined that the Generating Facility’s protective relaying may not operate during certain conditions or faults; or 4.8.1.3 The installation could increase the length of outages on a distribution circuit or jeopardize the reliability of the circuit. The Generator shall be responsible for all costs and expenses incurred by the EDC to install a DTT scheme from all EDC sources and isolation points. 4.8.2 Current Supervision of Under Frequency Load Shedding Studies have revealed that larger generators may have an undesirable impact on the EDC’s underfrequency load shedding schemes. If transmission supply is lost to the EDC’s distribution substation for a period of time, the generators paralleled to that substation may
  4. Page 14 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 14 of 27 cause the underfrequency load shedding scheme to operate as the generators hold up the EPS voltage and the frequency drops. Because operation of the load shedding scheme in this manner results in the tripping of lockout relays that cannot be reset remotely, this misoperation results in extended outages for some customers after transmission supply is restored. Therefore, generators above 1 MW may be required to pay for the addition of current supervision of the under frequency load shedding protection at the EDC’s substation. 4.9 4.8.3 High Speed Protection If the EDC determines that relaying used traditionally on the distribution system cannot operate quickly enough to avoid adverse system impacts, the EDC may require that the Generating Facility use either direct transfer tripping techniques or more sophisticated techniques that rely on protective relay communication to increase operating speed. 4.8.4 Recloser Schemes Any Generating Facility proposed for Interconnection at a point on the EPS that is supplied by an existing recloser scheme shall require special studies to determine the feasibility of that Interconnection as proposed. The Interconnection of the Generating Facility to the EPS shall not degrade the reliability of the EPS as a result of either its operation or changes to the EPS to accommodate the Interconnection. If the Generating Facility’s protection cannot be designed to meet these requirements, other anti-Islanding measures will be required (such as a dedicated circuit supply or DTT protective relaying from all EDC isolation points). Any changes to the EPS’s protective schemes or settings, or to the Generating Facility necessary to accommodate the Interconnection shall be at the Generator’s sole cost and expense. Protection System Changes 4.9.1 The Generator shall provide the EDC with reasonable advance notice of any proposed modifications to the Generating Facility’s protective relay system, relay settings, operating procedures or other equipment affecting the Interconnection. The EDC will determine if such proposed modifications require re-acceptance of the Interconnection per the requirements of this Section 4. 4.9.2 The EDC shall provide the Generator with reasonable advance notice of any proposed changes to be made to its protective relay system, relay settings, operating procedures or other equipment that affects the Interconnection. 4.10 Underfrequency Protection 4.10.1 Existing underfrequency load-shedding relay schemes on the EDC’s distribution circuits will be reviewed by the EDC to determine whether or not such scheme will operate properly with the Interconnection of the Generating Facility. Any changes required to the load-shedding scheme to provide proper operation will be at the Generator’s expense. See Section 4.8.2. 4.10.2 In order to help the system survive extreme capacity deficiencies caused by sudden loss of generating capacity, the Northeast Power Coordinating Council (NPCC) and its member companies have designed and installed an underfrequency load-shedding scheme throughout the Northeast. The purpose of this scheme is to shed load quickly enough to allow the remaining generation to stay on-line and prevent a major system-wide collapse. The over/under frequency settings recommended in IEEE 1547 have as the major goal the prevention of Unintended Islanding. However, the underfrequency settings in IEEE1547 are somewhat faster and conflict with the goals of the underfrequency load shedding scheme described in NPCC A-03. In order to maximize the likelihood of surviving a system wide capacity deficiency, the EDC may require that some larger Generating Facilities incorporate settings that conform to NPCC A-03 rather than IEEE 1547. The requirements are as follows: 4.10.2.1 All Generating Facilities with an aggregate capacity less than or equal to 100kW shall always utilize the faster IEEE-1547 trip settings.
  5. Page 15 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 15 of 27 4.10.2.2 Generating Facilities with an aggregate capacity of 100 kW or more, which are in net export mode, shall utilize the settings dictated by NPCC A-03. The underfrequency relay shall trip the point of interconnection circuit breaker. 4.10.2.3 Generating Facilities with an aggregate capacity 100 kW or more, which are in net import mode, shall utilize IEEE-1547 trip settings. The under-frequency relay shall trip the point of interconnection circuit breaker. In some special net import cases, as permitted in section 4.2.13, the EDC may require the slower NPCC A-03 settings to ensure there is no net load increase to the EPS due to an underfrequency trip. See Appendix A for setting guidance. 5. Interconnecting Generators with Network Systems Other sections of these Technical Requirements are applicable to Generating Facilities interconnected with radial primary or secondary distribution circuits, the most common distribution configuration. In large cities, however, a number of electric utility companies use low-voltage network systems. These low-voltage networks are of two subtypes: (1) the secondary grid network (also referred to as an area network, grid network, or street network) that serve; numerous sites, usually several city blocks, from a highly interconnected grid at 120/208 V, three-phase; and (2) the Spot Network that serve independent, large buildings usually at 277/480 V, three-phase. When completed, the IEEE standard development project P1547.6, “Draft Recommended Practice for Interconnecting Distributed Resources with Electric Power Systems Distribution Secondary Networks”, will cover both secondary grid networks and Spot Networks. 5.1 Area Networks A Generating Facility proposed to be interconnected to the load side of an Area Network protector must utilize an inverter-based equipment package and, when aggregated with other inverter-based generation, shall not exceed 50 kW at any location. A location is defined as any manhole or service box. This criteria is designed to ensure that no more than 50 kW of DG is located between the same set (s) of cable limiters. In addition, the aggregate DG interconnected to an area network will be limited to 3% of the maximum network transformer connected kVA with the feeder supplying the largest number of network units out of service, or a maximum of 500 kW, whichever is less. 5.2 Spot Networks A Generating Facility proposed to be interconnected to the load side of Spot Network protectors must utilize an inverter-based equipment package and, when aggregated with other inverter-based generation, shall not exceed the lesser of five percent (5%) of a Spot Network’s maximum load or 50 kW. The inverter must be certified to stop conducting prior to the three (3) cycle response of the network protector relays. In addition, all the following requirements of IEEE 1547 must be met as amended from time to time: 5.2.1 Network protectors shall not be used to separate, switch, serve as breaker failure backup, or in any manner isolate a Generating Facility’s network or network primary feeder from the remainder of the EPS, unless such protectors are rated and tested per applicable standards for such an application. 5.2.2 Each Generating Facility connected to a Spot Network shall be coordinated with the EPS such that it will not affect the operation or prevent closing of any network protectors installed on the Spot Network. Such coordination shall be accomplished without any changes to prevailing network protector clearing time practices of the EPS.
  6. Page 16 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 16 of 27 6. 5.2.3 Connection of the Generating Facility to the EPS shall be permitted only if the EPS network bus is already energized by more than 50% of the installed network protectors are in operation. 5.2.4 The Generating Facility’s output shall not cause any cycling of network protectors. The Interconnection of the Generating Facility shall not cause the network equipment loading and fault interrupting capacity to be exceeded. 5.2.5 Any Generating Facility installation on a Spot Network that utilizes an automatic transfer scheme in which load is transferred between the Generating Facility and the EPS in a momentary “make-before-break” operation shall meet all the requirements of Section 5.2 regardless of the duration of paralleling. 5.2.6 The Generating Facility shall not utilize a stand alone inverter capable of operation independent of the EPS. Metering, Monitoring and Communication The Generator shall be responsible for costs and expenses incurred by the EDC in connection with the purchase, installation, operation, maintenance, testing, repair or replacement of its metering and SCADA (supervisory control and data acquisition) equipment. Facility metering (and data acquisition, as required) equipment shall conform to EDC rules and applicable operating requirements. All metering devices shall conform to applicable American National Standard Institute (ANSI) C-12 standards, as amended from time to time. Metering of watt-hour, reactive volt-ampere-hour and the associated demand components should conform to ANSI standard C-12. Instrument transformers should conform to ANSI standard C57.13. 6.1 6.2 Communications Channels and SCADA 6.1.1 The EDC may require communications channels between the EDC and the Generating Facility. If so required, the Generator shall be responsible for procuring such communications channels and for providing protection from transients and over-voltages at both ends of such communication channels. The Generator shall be responsible for all costs and expenses incurred in connection with such communication channels. 6.1.2 In order to facilitate safe, efficient and reliable operation of the EPS, any Generating Facility with a size of 1MW or greater shall have telemetry equipment compatible with the EDC’s SCADA. The Generator shall be responsible for all costs and expenses incurred in connection with this telemetry equipment. The quantities to be telemetered are: (i) Phase Voltage; (ii) Line Current; (iii) Real Power (kW); (iv) Reactive power (kVAR); (v) and breaker disconnect status (open/closed) both at the generator and at the Point of Interconnection. The EDC may require the Generating Facility to have additional equipment, such as protective devices, supervisory control and alarms, and a dedicated communications channel. The EDC shall advise the applicant of its communications requirements after a preliminary review of the Generator’s Interconnection Request. Metering and Related Equipment in General 6.2.1 The EDC shall furnish, read and maintain all EDC revenue metering equipment and shall be responsible for metering required for tariff administration. The Generator shall furnish and maintain all meter mounting equipment, including meter sockets, test switches, conduits, and enclosures. Except as provided below, the EDC shall own the EDC revenue meter and the Generator shall pay the applicable EDC tariff(s), as amended from time to time. If the Generating Facility is a Qualifying Facility, the Generator may elect to own the meter, in which case the Generator shall pay to the EDC a monthly charge to cover meter maintenance and incremental reading and billing costs. Metering requirements and associated charges for Qualifying Facilities are set forth in the applicable EDC tariff(s), as amended from time to time.
  7. Page 17 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 17 of 27 6.3 6.2.2 The Generator shall provide suitable space within the Generating Facility for installation of the metering and communication equipment at no cost to the EDC. 6.2.3 All metering equipment installed within the Generating Facility shall be routinely tested by the EDC, at the Generator’s sole cost and expense, in accordance with applicable EDC and/or ISO-NE rules or standards. If any metering equipment is found to be inaccurate by a margin greater than that allowed under applicable criteria, rules and standards, the EDC shall cause such metering equipment to be corrected or replaced. The Generator shall be responsible for the cost to replace or correct the meter, unless the meter is owned by the EDC. Meter readings for the period of inaccuracy shall be adjusted so far as the same can be reasonably ascertained; provided, however, there shall be no such adjustment prior to the beginning of the month preceding the adjustment except by agreement of the parties. The Generator and the EDC shall each comply with any reasonable request of the other party concerning the sealing of meters, the presence of a representative of the other party when the seals are broken and the tests are conducted, and other matters affecting the accuracy of the measurement of electricity delivered from the Generating Facility. If either the EDC or the Generator has reason to believe that there has been a meter failure or stoppage, it shall immediately notify the other party. 6.2.4 If the Metering Point and the Point of Receipt or Point of Delivery are not at the same location, the metering equipment shall record delivery of electricity in a manner that accounts for losses occurring between the Metering Point and the Point of Receipt or Point of Delivery. Losses between the Metering Point and Point of Receipt will be reflected pursuant to applicable EDC, ISO-NE rules or standards. 6.2.5 The EDC does not allow hot sequence secondary metering where the revenue meter or instrument transformers are on the line side of the customer's main switch. Any new meter installation (or any changes to an existing revenue meter installation) needs to be cold sequenced and on the load side of the main switch, as approved by the Meter Engineering Department, and in accordance with the CL&P / UI Information and Requirements for Electric Supply book. CL&P-Specific Requirements for Revenue Metering and Related Equipment The type of metering equipment to be installed at a Generating Facility is dependent on the size of the Generating Facility and whether and how the Generator plans to export power or net meter. For Generators that will export power or net meter, the available equipment options and associated requirements are: 6.3.1 Net Metering. Net Metering is an option under the terms of CL&P’s Rider N Self-Generator Net Energy Billing Services for a facility whose installed generating capacity for fossilfueled fired co-generator meets the generator capacity requirements defined in Rider N, or, for generation fueled by a renewable resource that meets the generator capacity requirements defined in Rider N. The Generating Facility will be equipped with a minimum of a tworegister, electronic, solid state meter that captures the total monthly energy delivered to the Generating Facility and total monthly energy received by the EPS. The netting of the meter readings during the billing process replicates the functionality of previously utilized mechanical meters that physically operated in both forward and reverse directions. All metering equipment included in this type of installation, including self-acquainted meters, instrument transformers and meters shall meet ANSI C12.1 Metering Accuracy Standards and ANSI C57.13 Accuracy Requirements for Instrument Transformers. 6.3.2 Bi-directional, non-interval meter, including a distribution class meter with multiple registers. One set of registers will record energy flows from the EDC to the Generator during periods when the Generator is a net consumer of energy. A second set of registers will record energy flows from the Generator to the EDC during periods when the Generator is a net producer of energy. Each set of registers will record total flows only and will not
  8. Page 18 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 18 of 27 record flows during specific intervals. All metering equipment included in this type of installation, including self-contained meters and instrument transformers and meters, shall meet ANSI C12.1 Metering Accuracy Standards and ANSI C57.13 Accuracy Requirements for Instrument Transformers. 6.4 6.3.3 The Generator must allow the EDC telephone or Ethernet access to the meter using the Generators’ telephone circuit or provide a separate telephone, Ethernet circuit, if needed by EDC to read the meter. 6.3.4 Bi-directional, interval meter with remote access, including a distribution class meter with multiple registers. One set of registers will record energy flows from the EDC to the Generating Facility during periods when the Generating Facility is a net consumer of energy the other set of registers will record no flow during these periods. A second set of registers will record energy flows from the Generating Facility to the EDC during periods when the Generating Facility is a net producer of energy the first set of registers will record no flow during these periods. Each set of registers will record total flows as well as flows during hourly intervals. In addition, the meters will be equipped with remote access capability that may include communication to the extent required by applicable ISO-NE standards. All metering equipment included in this type of installation shall meet the requirements contained in ISO-NE Operating Procedure No. 18, “Metering and Telemetering Criteria” and EDC’s “Policy and Practices for Metering and Telemetering Requirements for New or Modified Interconnections”. Copies of both publications are available from the EDC upon request. The Generator shall be responsible for providing all necessary leased communication (telephone, Ethernet) lines and any necessary protection for leased lines and shall also be responsible for all communication required by ISO-NE, or by ISO-NE’s designated satellite. The Generator shall maintain all communication and transducer equipment at the Generating Facility in accordance with ISO-NE criteria, rules and standards. The EDC will purchase, own and maintain all communication equipment located at the Generators facilities, if the Generator desires, at the Generator’s expense. The Generator shall provide, install and own the EDC-approved or EDC-specified test switches in the meter and transducer circuits. 6.3.5 All metering equipment installed pursuant to these Technical Requirements and associated with the Generating Facility shall be routinely tested by the EDC at the Generator’s expense, in accordance with applicable EDC and/or ISO-NE criteria, rules and standards. 6.3.6 Fossil-fuel fired co-generator units that meet Rider N capacity requirements and units fueled by a renewable resource that meet Rider N capacity requirements, will be equipped with a bidirectional meter. Such meter will have remote access capability and may be an interval meter. UI-Specific Requirements for Metering and Related Equipment The type of metering equipment to be installed at a Generating Facility is dependent on the size and type of the Generating Facility and how and if the Generator plans to export power or net meter. In general, the metering requirements for customer generation are: 6.4.1 A Qualifying Facility meeting the generator capacity requirements defined in UI’s “Rider NE” with installed generating capacity fueled by either a fossil-fueled fired co-generator or a renewable resource shall have its electric service metered for revenue purposes using two watt-hour meters with detents or, if feasible, one watt-hour meter capable of measuring bidirectional power flow. This type of metering is referred to as “Net Energy Metering.” UI may choose to meter generator output, customer loads, or other quantities as necessary e.g., to monitor circuit load, load survey or VARS). The Generator may be required to install metering facilities, such as meter sockets, to facilitate this metering. All metering equipment included in this type of installation, including self-contained meters and instrument transformers and meters, shall meet ANSI C12.1 Metering Accuracy Standards and ANSI C57.13 Accuracy Requirements for Instrument Transformers.
  9. Page 19 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 19 of 27 6.4.2 Where the cumulative total nameplate of all generation at the Generating Facility exceeds the requirements of UI’s “Rider NE” but is equal to or less than 1 MW, the electric service shall be metered for revenue purposes using two watt-hour meters with detents or, if feasible, one watt-hour meter capable of measuring bi-directional power flow. UI may choose to meter generator output, customer loads, or other quantities as necessary (e.g., to monitor circuit load, load survey or VARS). The customer may be required to install metering facilities, such as meter sockets, to facilitate this metering. All metering equipment included in this type of installation, including self-contained meters and instrument transformers and meters, shall meet ANSI C12.1 Metering Accuracy Standards and ANSI C57.13 Accuracy Requirements for Instrument Transformers. 6.4.3 Where the cumulative total nameplate of all generation at the Generating Facility exceeds 1 MW, bi-directional reactive power flow must also be metered in addition to the metering requirements set forth in Section 6.4.2. Furthermore, UI may require other meters to measure gross generation (Watts and VARS), and station service loads. The Generator shall be responsible for the costs and expenses incurred in connection with these meters and their installation, maintenance and operation. In accordance with the needs of ISO New England and ISO-NE Operating Procedures, the metering requirements set forth in Section 6.4.4 regarding telemetry, remote monitoring and additional metering may be imposed by UI on any Generating Facility described in this Section. All metering equipment included in this type of installation, including self-contained meters and instrument transformers and meters, shall meet ANSI C12.1 Metering Accuracy Standards and ANSI C57.13 Accuracy Requirements for Instrument Transformers 6.4.4 Where the cumulative total nameplate of all generation at the Generating Facility exceeds 5 MW, telemetering, remote monitoring and additional metering shall be required in addition to the metering requirements set forth in the previous sections 6.4.2 and 6.4.3. These requirements are defined in ISO-NE Operating Procedure No. 18 “Metering and Telemetering Criteria” and further defined in ISO-NE Operating Procedure No. 14, “Technical Requirements for Generation, Dispatchable and Interruptible Loads.” The quantities to be telemetered may include without limitation: (i) gross generation (Watts and VARS); (ii) tie line power flow (Watts and VARS - in and out); (iii) station service; (iv) line amps; (v) bus voltage; (vi) circuit breaker status; and (vii) generator status. The quantities to be telemetered will be determined by UI as part of the preliminary review of an Interconnection Request. The Generator shall be responsible for the cost of required meters, telemetry equipment and communication circuits as well as their installation, maintenance and operation. The Generator shall be responsible for providing all necessary leased communication (telephone, ethernet) lines and any necessary protection for leased lines and shall furthermore be responsible for all communication required by ISO-New England, its designated satellite, or UI. The Generator shall maintain all communication and transducer equipment at the Generation Facility in accordance with ISO-New England criteria, rules and standards. If the Generator so desires, UI will procure, own and maintain all communication equipment located at the Generating Facility at the Generator’s sole cost and expense. All metering equipment installed pursuant to these Technical Requirements shall be routinely tested by UI at the Generator’s sole cost and expense in accordance with applicable UI and/or ISO-New England criteria, rules and standards. The Generator shall provide, install and own UI-approved or UI-specified test switches in the transducer circuits. NOTE: • UI Standard TSM 2.4 provides details for net energy metering. • UI Standard TSM 2.3 provides metering details for generators connected at a secondary voltage (480 volts or less). • UI Standard TSM 2.2 covers units connected at primary distribution voltages (2.4, 4.16 or 13.8 kV). • UI Standard TSM 2.1 provides metering details for generators connected to the transmission system (115 kV). 7. Testing and Maintenance Requirements
  10. Page 20 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 20 of 27 All testing must be completed in accordance with the latest approved version(s) of IEEE 1547 section 5.0 and IEEE 1547.1. 7.1 Witnessing of Commissioning Test The EDC shall have the right to witness the commissioning testing (pre-parallel testing) as defined in the IEEE 1547.1. The Generator shall notify the EDC ten (10) Business Days in advance of the testing so that the EDC may, at its option, have EDC personnel observe the testing, or inspect the installation. Prior to notifying the EDC of the testing, the Generator shall provide a copy of the test procedure, the as-built one-line and three-line metering and relaying diagram(s), and applicable relay control diagrams for EDC approval. An individual qualified and experienced in testing protective equipment must perform commissioning testing in accordance with the manufacturer’s recommended test procedure to prove the settings and requirements of these Technical Requirements. At the completion of the test, the Generator shall provide the EDC with a copy of the test report data. All witness testing will be conducted at the expense of the interconnecting generator. Testing typically includes, but is not limited to: • CT and CT circuit polarity, ratio, insulation, excitation, continuity and burden tests. • VT and VT circuit polarity, ratio, insulation and continuity tests. • Relay pick-up and time delay tests. • Functional breaker trip tests from protective relays. • Relay in-service test to check for proper phase rotation and magnitudes of applied currents and voltages. • Breaker closing interlocks tests. • Paralleling and disconnection operation. • Anti-islanding function, if applicable. • Non-export function, if applicable. • Synchronizing Controls, if applicable. • Proof of inability to energize dead lines. Prior to final approval by the EDC or anytime thereafter, the EDC reserves the right to test the Generator relaying and control equipment related to the protection of the EDC’s system. The EDC reserves the right to install at a mutually agreed upon location, special test equipment as may be required to monitor the operation and control of the Generating Facility or for evaluating the quality of power produced by the Generating Facility. Each commissioning test shall include both a calibration check and an actual trip of the circuit breaker or contactor from the device being tested. Visually setting a calibration dial, index or tap is not considered an adequate calibration 7.2 Periodic Testing The Generator is responsible for the periodic maintenance of all relays, interrupting devices, control schemes, and batteries that involve the protection of the EPS. Batteries shall be load tested once every twenty four (24) months, or more frequently based on the manufacturer’s recommendations. The test cycle for protective relaying must not be less frequent than once every sixty (60) calendar months or the cycle recommended by the manufacturer, whichever is shorter. The Generator must provide copies of these test records to the EDC. The EDC shall have the right to monitor the periodic maintenance performed.

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026