Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

Text of ICC-001 Attachment 5.pdf

Extracted from the file · 67 pages · 136,480 characters

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

  1. Page 18 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 18 of 27 record flows during specific intervals. All metering equipment included in this type of installation, including self-contained meters and instrument transformers and meters, shall meet ANSI C12.1 Metering Accuracy Standards and ANSI C57.13 Accuracy Requirements for Instrument Transformers. 6.4 6.3.3 The Generator must allow the EDC telephone or Ethernet access to the meter using the Generators’ telephone circuit or provide a separate telephone, Ethernet circuit, if needed by EDC to read the meter. 6.3.4 Bi-directional, interval meter with remote access, including a distribution class meter with multiple registers. One set of registers will record energy flows from the EDC to the Generating Facility during periods when the Generating Facility is a net consumer of energy the other set of registers will record no flow during these periods. A second set of registers will record energy flows from the Generating Facility to the EDC during periods when the Generating Facility is a net producer of energy the first set of registers will record no flow during these periods. Each set of registers will record total flows as well as flows during hourly intervals. In addition, the meters will be equipped with remote access capability that may include communication to the extent required by applicable ISO-NE standards. All metering equipment included in this type of installation shall meet the requirements contained in ISO-NE Operating Procedure No. 18, “Metering and Telemetering Criteria” and EDC’s “Policy and Practices for Metering and Telemetering Requirements for New or Modified Interconnections”. Copies of both publications are available from the EDC upon request. The Generator shall be responsible for providing all necessary leased communication (telephone, Ethernet) lines and any necessary protection for leased lines and shall also be responsible for all communication required by ISO-NE, or by ISO-NE’s designated satellite. The Generator shall maintain all communication and transducer equipment at the Generating Facility in accordance with ISO-NE criteria, rules and standards. The EDC will purchase, own and maintain all communication equipment located at the Generators facilities, if the Generator desires, at the Generator’s expense. The Generator shall provide, install and own the EDC-approved or EDC-specified test switches in the meter and transducer circuits. 6.3.5 All metering equipment installed pursuant to these Technical Requirements and associated with the Generating Facility shall be routinely tested by the EDC at the Generator’s expense, in accordance with applicable EDC and/or ISO-NE criteria, rules and standards. 6.3.6 Fossil-fuel fired co-generator units that meet Rider N capacity requirements and units fueled by a renewable resource that meet Rider N capacity requirements, will be equipped with a bidirectional meter. Such meter will have remote access capability and may be an interval meter. UI-Specific Requirements for Metering and Related Equipment The type of metering equipment to be installed at a Generating Facility is dependent on the size and type of the Generating Facility and how and if the Generator plans to export power or net meter. In general, the metering requirements for customer generation are: 6.4.1 A Qualifying Facility meeting the generator capacity requirements defined in UI’s “Rider NE” with installed generating capacity fueled by either a fossil-fueled fired co-generator or a renewable resource shall have its electric service metered for revenue purposes using two watt-hour meters with detents or, if feasible, one watt-hour meter capable of measuring bidirectional power flow. This type of metering is referred to as “Net Energy Metering.” UI may choose to meter generator output, customer loads, or other quantities as necessary e.g., to monitor circuit load, load survey or VARS). The Generator may be required to install metering facilities, such as meter sockets, to facilitate this metering. All metering equipment included in this type of installation, including self-contained meters and instrument transformers and meters, shall meet ANSI C12.1 Metering Accuracy Standards and ANSI C57.13 Accuracy Requirements for Instrument Transformers.
  2. Page 19 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 19 of 27 6.4.2 Where the cumulative total nameplate of all generation at the Generating Facility exceeds the requirements of UI’s “Rider NE” but is equal to or less than 1 MW, the electric service shall be metered for revenue purposes using two watt-hour meters with detents or, if feasible, one watt-hour meter capable of measuring bi-directional power flow. UI may choose to meter generator output, customer loads, or other quantities as necessary (e.g., to monitor circuit load, load survey or VARS). The customer may be required to install metering facilities, such as meter sockets, to facilitate this metering. All metering equipment included in this type of installation, including self-contained meters and instrument transformers and meters, shall meet ANSI C12.1 Metering Accuracy Standards and ANSI C57.13 Accuracy Requirements for Instrument Transformers. 6.4.3 Where the cumulative total nameplate of all generation at the Generating Facility exceeds 1 MW, bi-directional reactive power flow must also be metered in addition to the metering requirements set forth in Section 6.4.2. Furthermore, UI may require other meters to measure gross generation (Watts and VARS), and station service loads. The Generator shall be responsible for the costs and expenses incurred in connection with these meters and their installation, maintenance and operation. In accordance with the needs of ISO New England and ISO-NE Operating Procedures, the metering requirements set forth in Section 6.4.4 regarding telemetry, remote monitoring and additional metering may be imposed by UI on any Generating Facility described in this Section. All metering equipment included in this type of installation, including self-contained meters and instrument transformers and meters, shall meet ANSI C12.1 Metering Accuracy Standards and ANSI C57.13 Accuracy Requirements for Instrument Transformers 6.4.4 Where the cumulative total nameplate of all generation at the Generating Facility exceeds 5 MW, telemetering, remote monitoring and additional metering shall be required in addition to the metering requirements set forth in the previous sections 6.4.2 and 6.4.3. These requirements are defined in ISO-NE Operating Procedure No. 18 “Metering and Telemetering Criteria” and further defined in ISO-NE Operating Procedure No. 14, “Technical Requirements for Generation, Dispatchable and Interruptible Loads.” The quantities to be telemetered may include without limitation: (i) gross generation (Watts and VARS); (ii) tie line power flow (Watts and VARS - in and out); (iii) station service; (iv) line amps; (v) bus voltage; (vi) circuit breaker status; and (vii) generator status. The quantities to be telemetered will be determined by UI as part of the preliminary review of an Interconnection Request. The Generator shall be responsible for the cost of required meters, telemetry equipment and communication circuits as well as their installation, maintenance and operation. The Generator shall be responsible for providing all necessary leased communication (telephone, ethernet) lines and any necessary protection for leased lines and shall furthermore be responsible for all communication required by ISO-New England, its designated satellite, or UI. The Generator shall maintain all communication and transducer equipment at the Generation Facility in accordance with ISO-New England criteria, rules and standards. If the Generator so desires, UI will procure, own and maintain all communication equipment located at the Generating Facility at the Generator’s sole cost and expense. All metering equipment installed pursuant to these Technical Requirements shall be routinely tested by UI at the Generator’s sole cost and expense in accordance with applicable UI and/or ISO-New England criteria, rules and standards. The Generator shall provide, install and own UI-approved or UI-specified test switches in the transducer circuits. NOTE: • UI Standard TSM 2.4 provides details for net energy metering. • UI Standard TSM 2.3 provides metering details for generators connected at a secondary voltage (480 volts or less). • UI Standard TSM 2.2 covers units connected at primary distribution voltages (2.4, 4.16 or 13.8 kV). • UI Standard TSM 2.1 provides metering details for generators connected to the transmission system (115 kV). 7. Testing and Maintenance Requirements
  3. Page 20 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 20 of 27 All testing must be completed in accordance with the latest approved version(s) of IEEE 1547 section 5.0 and IEEE 1547.1. 7.1 Witnessing of Commissioning Test The EDC shall have the right to witness the commissioning testing (pre-parallel testing) as defined in the IEEE 1547.1. The Generator shall notify the EDC ten (10) Business Days in advance of the testing so that the EDC may, at its option, have EDC personnel observe the testing, or inspect the installation. Prior to notifying the EDC of the testing, the Generator shall provide a copy of the test procedure, the as-built one-line and three-line metering and relaying diagram(s), and applicable relay control diagrams for EDC approval. An individual qualified and experienced in testing protective equipment must perform commissioning testing in accordance with the manufacturer’s recommended test procedure to prove the settings and requirements of these Technical Requirements. At the completion of the test, the Generator shall provide the EDC with a copy of the test report data. All witness testing will be conducted at the expense of the interconnecting generator. Testing typically includes, but is not limited to: • CT and CT circuit polarity, ratio, insulation, excitation, continuity and burden tests. • VT and VT circuit polarity, ratio, insulation and continuity tests. • Relay pick-up and time delay tests. • Functional breaker trip tests from protective relays. • Relay in-service test to check for proper phase rotation and magnitudes of applied currents and voltages. • Breaker closing interlocks tests. • Paralleling and disconnection operation. • Anti-islanding function, if applicable. • Non-export function, if applicable. • Synchronizing Controls, if applicable. • Proof of inability to energize dead lines. Prior to final approval by the EDC or anytime thereafter, the EDC reserves the right to test the Generator relaying and control equipment related to the protection of the EDC’s system. The EDC reserves the right to install at a mutually agreed upon location, special test equipment as may be required to monitor the operation and control of the Generating Facility or for evaluating the quality of power produced by the Generating Facility. Each commissioning test shall include both a calibration check and an actual trip of the circuit breaker or contactor from the device being tested. Visually setting a calibration dial, index or tap is not considered an adequate calibration 7.2 Periodic Testing The Generator is responsible for the periodic maintenance of all relays, interrupting devices, control schemes, and batteries that involve the protection of the EPS. Batteries shall be load tested once every twenty four (24) months, or more frequently based on the manufacturer’s recommendations. The test cycle for protective relaying must not be less frequent than once every sixty (60) calendar months or the cycle recommended by the manufacturer, whichever is shorter. The Generator must provide copies of these test records to the EDC. The EDC shall have the right to monitor the periodic maintenance performed.
  4. Page 21 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 21 of 27 Each routine check shall include both a calibration check and an actual trip of the circuit breaker or contactor from the device being tested. Visually setting a calibration dial, index or tap is not considered an adequate calibration. 7.3 Safe Operations and Maintenance The Generator shall operate, maintain, repair, and inspect, and shall be fully responsible for the Generating Facility and any other associated facilities that it now or hereafter may own unless otherwise specified in the Interconnection Agreement. The Generator and the EDC shall each be responsible for the maintenance, repair and condition of its respective lines and appurtenances on its respective side of the Point of Interconnection. The EDC and the Generator shall each provide equipment on its respective side of the Point of Interconnection that adequately protects the EPS, personnel, and other persons from damage and injury. All maintenance shall be performed as specified in the Interconnection Agreement as executed by the parties. 8. Standards and Applicable Guidelines (IEEE, UL, ANSI, etc.) a. Precertified Facilities Generating Facilities using qualified (certified to UL 1741/1741 SA including IEEE C62.41) inverterbased facilities with power ratings of 20 kW or less requesting an Interconnection on radial systems where the aggregate Generating Facility capacity on the circuit is less than 5% of circuit annual peak load, qualify for Interconnection under “Guidelines for the Interconnection of Residential Single Phase Certified Inverter -Based Generating Facilities 20 kW (ac) and Less”. b. Non-Precertified Facilities If inverter-based Facilities with power ratings of 20 kW or less are not using qualified inverters, the application shall be reviewed following “Guidelines for Generator Interconnection-Fast Track and Study Process”. Certification of Generator Equipment Packages Some Generator equipment packages have been certified. This facilitates the Interconnection since properly certified equipment need not be reviewed by the EDC in as much detail as non-certified equipment. This results in a faster, less costly review process for the Generator. For more information on certification of generator equipment packages see Attachment IX - Certification of Small Generator Equipment Packages in the Guidelines for Generator Interconnection Fast Track and Study Processes Codes and Standards • All the existing codes and standards (in addition to any successor codes and standards) listed in Attachment X Codes and Standards section of the Guidelines for Generator Interconnection Fast Track and Study Processes shall be applied as appropriate.
  5. Page 22 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 22 of 27 Appendix A Distributed Generation Paralleling with an Electric Power System Protective Relaying Setting Guidelines1,2,3,4 Appendix 4.2.8A Protective Element Typical Settings Comment Always Required Protection 5 Primary Function: Anti-Islanding 27 Under-voltage 27-1: This element operates when its input voltage is less than a predetermined value. Set 0.50puV, trip in 0.16 sec per IEEE 1547, Dated 2003, IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems, Table 1. 27-2: 0.88puV trip in 2.00 sec Note: Voltage sensing on all three phases shall be used for maximum sensitivity for phase disturbances. Primary Function: Anti-Islanding 59 Over-voltage 59-1: 1.10puV trip in 1.00 sec This element operates when its input voltage exceeds a predetermined value. Set per IEEE 1547, Dated 2003, IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems, Table 1. 59-2: 1.20puV trip in 0.16 sec Note: Voltage sensing on all three phases shall be used for maximum sensitivity for phase disturbances. Primary Function: Anti-Islanding 81o Overfrequency 81O-1: 60.5Hz trip in 0.16sec This element responds to the frequency of the system voltage and operates when the frequency exceeds a predetermined value. Set per IEEE 1547, Dated 2003, IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems, Table 2. Primary Function: Anti-Islanding (Per IEEE 1547) 81U-1: 59.8-57.0Hz trip in .16300sec 81U-2: 57.0Hz trip in 0.16sec 81u Underfrequency (Per NPCC A-03) 81U-1: 58.0Hz trip in 32.0sec 81U-2: 57.5Hz trip in 11.0sec 81U-3: 57.0Hz trip in 0.16sec This element responds to the frequency of the system voltage and operates when the frequency is less than a predetermined value. Refer to Section 4.10 for guidance on underfrequency tripping. Set per IEEE 1547, Dated 2003, IEEE Standard for Interconnecting Distributed Resources with Electric Power Systems, Table 2. Primary Function: Anti-Islanding This element responds to the frequency of the system voltage and operates when the frequency is less than a predetermined value. Refer to Section 4.10 for guidance on underfrequency tripping. Set per NPCC A-03, 8-31-2004, Figure 1.
  6. Page 23 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 23 of 27 Additional Protection Requirements 6 Primary Function: Permissive Close 25 Synch-Check set per Customer study 7 This element supervises the operation of the generator automatic or manual synchronizing system by ensuring proper voltage, phase angle matching, and where appropriate, slip frequency between the EPS and Generator before the breaker is allowed to close. It is important that the appropriate Live/Dead, Line and Bus options be selected to permit breaker closing under other conditions. For example, if the generator is OFF-LINE and the customer bus is Dead then the 25 relay should permit a Live EPS to Dead Bus close of the EPS/Generator interconnection breaker to restore power to the load. Primary Function: Export Blocking This element is used on systems designed as import only systems to ensure no 32R (rev): set to min. possible level power is exported onto the EPS. When the system is designed to not export power (1-10% MAX watts of the DG controls are usually set to a "minimum import level" (say 100kW). The difference between this minimum import level and the reverse power setting is the smallest Genset) (trip in minimum time 5-10 margin before a trip will occur. This relay is set relatively slow to allow the generator import/export controls to respond to sudden load changes which may momentarily sec MAX) cause an export condition. A properly functioning import/export control system will rapidly reduce the generator output back to the target "minimum import level". Primary Function: Anti-Islanding 32 Directional Power This element performs a similar function to the 32R element except it ensures the generating facility is always importing some preset level of power. If the import level drops below the "underpower" threshold then the element will operate to trip. This element should be used in cases where a reliable 32R (export trip) cannot be guaranteed. 32U (under): set to target import level (trip in minimum time 5-10 For example, if an upstream EPS recloser opens and the Generating Facility backfeeds or islands a small pocket of distribution load there may be insufficient sec MAX) reverse power to ensure a reliable 32R trip. On the other hand if the 32U element is applied to this same case, the Generating Facility would trip after the EPS source is lost since the import power will drop to a zero or negative value which is below the 32U trip threshold. Note: These Import Only systems typically have less complex interconnections since they have limited adverse effects on EPS system voltages and are less likely to have the ability to sustain an EPS island. Primary Function: Unbalance Detection 46 Negative Sequence Current 51 Over-current (Phase) 51N Over-current (Ground) set per Customer study 7 set per Customer study 7 This element serves to protect both the EPS and generator system from system unbalances including single phasing. Generators may become damaged quickly from high negative sequence currents. This setting is typically based on generator capabilities and may be reviewed by the EDC. Primary Function: Fault Detection This element provides phase overcurrent protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value. Primary Function: Fault Detection set per Customer study 7 This element provides ground overcurrent protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value.
  7. Page 24 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 24 of 27 Primary Function: Fault Detection 51V Over-current (Voltage Control or Restrained) 59G Over-voltage (Ground) set per Customer study 7 set per Customer study 7 This element provides backup phase overcurrent protection for system faults under collapsed voltage condition. Many DG units cannot sustain fault current especially above 300% FLA. This element would allow setting the pickup below load current when voltage is depressed. Typically the pickup level is set to 50% of load current when the voltage is reduced below 80% of nominal. Primary Function: Anti-Islanding This element is intended to detect ground faults in the event that a ground source is lost such as the case of a DG with a Delta winding on the EPS side. This type of transformer connection can result in the classic 173% overvoltage on the unfaulted phases after the EDC station breaker is open. Even if this relay is set very fast there is still a risk of distribution system equipment damage (Reference ITIC Curve in IEEE 1547.2/DRAFT 7, Figure D.5). Primary Function: Fault Detection 67 Directional Phase May be required depending on feeder configuration. set per Customer study 7 This element provides directional phase overcurrent protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value in a specified direction. Primary Function: Fault Detection 67N Directional Phase May be required depending on feeder configuration. set per Customer study 7 This element provides directional ground overcurrent protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value in a specified direction. Primary Function: Manual Reset Lockout Relay 86 None All relay trip elements must operate a manual reset lockout relay which in turn trips isolating circuit breakers preventing reclosing by any means. In some cases utility approval may be obtained to allow certain relay elements to directly trip a breaker, bypassing the lockout relay for special automatic schemes. NOTES: 1) General: This reference is considered a "guide". Engineering judgement must be applied when evaluating each application. 2) Intent: These are considered necessary requirements to protect the EPS from the Generating Facility. The Generator is responsible for considering additional protection for its internal system. 3) Parallel Operation: These guidelines apply to Generating Facilities operating in parallel with the EPS 100msec or more. The requirements are reduced for applications where paralleling times are less than 100msec. 4) Equipment Requirements: Relays shall meet all applicable requirements of Section 4. 5) Always Required Protection: All generators must provide these protective relay elements. 6) Additional Protection Requirements: Certain Generating Facilities may be required to provide these additional requirements as will be determined by the utility interconnection study or as described in Section 4. 7) Set per Customer Study: The settings for these elements shall be submitted by the Generator to the EDC for review. At the Generator's request the EDC will provide system protection information directly related to the Point of Interconnection.
  8. Page 25 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 25 of 27 Appendix B
  9. Page 26 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 26 of 27 Appendix C --Additional Requirements for Inverter-Based Installations C.1. Inverter voltage trip settings Shall Trip Function Required Settings Voltage (p.u. of nominal voltage) 1.20 1.10 0.88 0.50 OV2 OV1 UV1 UV2 Clearing Time(s) 0.16 2.0 2.0 1.1 C.2. Inverter frequency trip settings Shall Trip Function Required Settings Frequency (Hz) 62.0 61.2 58.5 56.5 OF2 OF1 UF1 UF2 Clearing Time(s) 0.16 300.0 300.0 0.16 C.3. Inverter Voltage Ride-through Capability and Operational Requirements Voltage Range (p.u.) Operating Mode/ Response Minimum Ride-through Time(s) (design criteria) V > 1.20 1.175<V≤1.20 1.15<V≤1.175 1.10<V≤1.15 0.88≤V≤1.10 Cease to Energize Permissive Operation Permissive Operation Permissive Operation Continuous Operation Mandatory Operation N/A 0.2 0.5 1 infinite 0.65≤V<0.88 Linear slope of 8.7 s/1 p.u. voltage starting at 3 s @ 0.65 p.u.: 8.7 𝑇𝑉𝑅𝑇 = 3 𝑠 + (𝑉 − 0.65 𝑝. 𝑢. ) 1 𝑝. 𝑢. Maximum Response Time(s) (design criteria) 0.16 N/A N/A N/A N/A N/A
  10. Page 27 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 3 Page 27 of 27 0.45≤V<0.65 0.30≤V<0.45 V<0.30 Permissive Operation12 Permissive Operation Cease to Energize 0.32 N/A 0.16 N/A N/A 0.16 C.4. Inverter frequency ride-thru capability Frequency Range (Hz) f > 62.0 61.2<f≤61.8 58.8≤f≤61.2 57.0≤f≤58.8 f<57.0 Minimum Time(s) Operating Mode (Design Criteria) No ride-through requirements apply to this range Mandatory Operation 299 Continuous Operation Infinite Mandatory Operation 299 No ride-through requirements apply to this range C.5. Grid support utility interactive inverter function status Function SPF, Specified Power Factor Q(V), Volt-Var Function with Watt or Var Priority SS, Soft-Start Ramp Rate FW, Freq-Watt Function OFF 1 Default Activation State Off Off Default value: 2% of maximum current output per second On Off In the Permissive Operation region above 0.5 p.u., inverters shall ride-through in Mandatory Operation mode, and In the Permissive Operation region below 0.5 p.u., inverters shall ride-through in Mandatory Cessation mode with a maximum response time of 0.083 seconds. 2

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters