Interrogatory responses
Answers to questions 288, 289, 291, 292, 297, 300
Files10
EOE-288_Final.pdf
PDF · 90 KB · 1 pageText searchable
Download EOE-288_Final.pdfRead the text of EOE-288_Final.pdf
EOE-289_Final.pdf
PDF · 142 KB · 2 pagesText searchable
Download EOE-289_Final.pdfRead the text of EOE-289_Final.pdf
EOE-291_Final.pdf
PDF · 117 KB · 2 pagesText searchable
Download EOE-291_Final.pdfRead the text of EOE-291_Final.pdf
EOE-291 Attachment 1 REDACTED.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download EOE-291 Attachment 1 REDACTED.pdfRead the text of EOE-291 Attachment 1 REDACTED.pdf
EOE-291 Attachment 2 REDACTED.pdf
PDF · 758 KB · 2 pagesNo text in this file
EOE-292_Final.pdf
PDF · 176 KB · 3 pagesText searchable
Download EOE-292_Final.pdfRead the text of EOE-292_Final.pdf
EOE-292 Attachment 1 REDACTED.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download EOE-292 Attachment 1 REDACTED.pdfRead the text of EOE-292 Attachment 1 REDACTED.pdf
EOE-297_Final.pdf
PDF · 88 KB · 1 pageText searchable
Download EOE-297_Final.pdfRead the text of EOE-297_Final.pdf
EOE-300_Final.pdf
PDF · 178 KB · 3 pagesText searchable
Download EOE-300_Final.pdfRead the text of EOE-300_Final.pdf
EOE-300 Attachment 1 REDACTED.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download EOE-300 Attachment 1 REDACTED.pdfRead the text of EOE-300 Attachment 1 REDACTED.pdf
Text of EOE-291 Attachment 1 REDACTED.pdf
Extracted from the file · 24 pages, 2 without text · 56,420 characters
Text of EOE-292_Final.pdf
Extracted from the file · 3 pages · 7,800 characters
Text of EOE-292 Attachment 1 REDACTED.pdf
Extracted from the file · 24 pages, 2 without text · 56,405 characters
Text of EOE-297_Final.pdf
Extracted from the file · 1 page · 1,068 characters
Text of EOE-300_Final.pdf
Extracted from the file · 3 pages · 9,650 characters
Page 11 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-300 Attachment 1 REDACTED Page 11 of 24 for any expenses relating to tobacco products, alcohol, laundry, personal hygiene products or other non-Emergency Response Work-related personal expenses. 5. MISCELLANEOUS 5.1. Reimbursable Costs. Contractor shall be entitled to reimbursement for the following costs associated with such Work: 5.1.1. Excess Travel. Unless otherwise specified in the applicable Work Release, Work performed on a firm fixed price basis or subject to a not-toexceed amount includes travel time from the show-up site to the job site of 30 minutes of travel time each way (for Fairfield County, Connecticut), or 15 minutes of travel time each way (for all other parts of Connecticut, Massachusetts and New Hampshire). If Contractor expects that actual travel time for such Work will exceed such durations, then Contractor may request reimbursement for excess travel time which, if approved, shall be included in the applicable Work Release or Change Order (using the hourly labor rates set forth in PRICING SCHEDULE - T&M, or such lesser rates as mutually agreed) and shall remain fixed for the duration of such Project. Unless so approved and included in the applicable Work Release or Change Order, Contractor shall not be entitled to reimbursement for such excess travel time. 5.1.2. Meals. Owner shall not be billed for Contractor's normal complement of employee's rooming costs or meals for any Work within Normal Working Hours. Under any of the following circumstances, Contractor will bill Owner for a fixed meal money allowance equal to per meal for Work performed by bargaining unit members using time and equipment and/or costplus pricing methodologies: (a) after nine and one-half (9 ½) hours from start of work on a scheduled eight (8) hour work day and every five (5) hours thereafter; (b) after twelve (12) hours from start of work on a scheduled ten (10) hour workday and every five (5) hours thereafter; or (c) after ten and one-half (10 ½) hours from show-up site arrival for scheduled/unscheduled Overtime Work and every five (5) hours thereafter. provided that (i) if, for any reason, Owner pays for, and/or provides the meals for any bargaining unit members, or (ii) the per diem under Section I, Paragraph 5.1.3 of this Pricing Schedule applies to any bargaining unit member, Contractor shall not bill Owner for the meal money allowances for the affected workers. EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 12 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-300 Attachment 1 REDACTED Page 12 of 24 5.2. Constructability Review. Owner may use a constructability review process as a means of improving and/or updating the Project design prior to receiving a quote from Contractor. Contractor shall have the right to receive reimbursement for such constructability review labor for a single employee (up to the classification of general foreman) and one vehicle (pick-up truck), even if Owner does not award such work to Contractor (and/or any other contractor). Contractor invoices for constructability reviews should reference the Project name and number, Owner inquiry number, purchase order and Work Release established only for constructability reviews, appropriate "work order" from the Project, and the Owner Representative's name. 5.3. Other Reimbursable Costs. If Services for a Project are exclusively priced using the time and material methodology set forth in Section 3, Owner shall reimburse Contractor for the following costs without profit or mark-up whatsoever (unless specifically indicated below), as incurred in performing the Work on such Project, but only if and to the extent not already included in any other respect in another aspect of time and material pricing and/or not otherwise addressed elsewhere in the Contract Documents: (a) to the extent authorized in writing by the Owner Representative for a Project prior to incurrence, the actual cost of any manufacturer's representatives, service engineers, start-up engineers, instrument check and calibration technicians and other manufacturer’s special services; (b) net cost of correcting faulty materials furnished by Owner; (c) to the extent authorized in writing by the Owner Representative for a Project prior to incurrence, the net cost of testing services by Third Parties, unless necessary as a result of negligence on the part of Contractor and/or its Subcontractor; (d) net cost of Owner-requested field office facilities equipment for exclusive use by the Owner Representative for such Project; the actual rate charged by a Subcontractor on such Project for services rendered, plus the Markup Percentage Fee in Appendix PS-6 PRICING SCHEDULE - T&M; provided that flagging/police services are not subject to a subcontractor markup unless the Owner Representative for such Project specifically requests that Contractor directly retain such services, rather than just coordinate them with the flagging company or police department; (e) (f) net direct cost paid by Contractor to Third Parties as rent or similar occupancy cost for parking, show-up, laydown and/or storage area(s) acquired for such Project (plus the Markup Percentage Fee in Appendix PS-6 PRICING SCHEDULE - T&M); provided that notwithstanding anything in this Pricing Schedule or elsewhere in the Contract Documents, Contractor shall not be EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 13 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-300 Attachment 1 REDACTED Page 13 of 24 entitled to recover and/or be reimbursed for (i) the internal costs of Contractor and/or any Subcontractor in locating, negotiating, acquiring, preparing and/or otherwise arranging such parking, show-up, laydown and/or storage area(s); and/or (ii) the costs associated with acquisition of a fee interest in any parking, show-up, laydown and/or storage area(s) and/or any other real property interest in the same that extends beyond the period required to perform the Work; (g) net cost paid by Contractor to a Governmental Authority as a filing fees and/or other charge as a condition to the issuance of a Contractor Permit required for such Project by such Governmental Authority; excluding, however, any such fee and/or charge required for construction equipment; and (h) to the extent authorized in writing by the Owner Representative for a Project prior to incurrence, the net cost for Contractor to verify, sign for, unload and accept vendor delivered materials to the storage/staging areas. Contractor's invoicing of reimbursable costs shall be supported by reasonably detailed documentation and such other verification as requested by Owner which, in the case of Subcontractor services (including materials and supplies), shall include signed time sheets, subcontractor invoices, and delivery receipts or other relevant documentation. Contractor shall use all reasonable efforts to mitigate the costs incurred in connection with all reimbursable costs and expenses, including, in the case of any reimbursable labor, using workers with the lowest rate appropriate for the Work. 5.4. Additional Requirements. With respect to Work using time and material and/or cost-plus pricing methodologies: (a) When material transport is requested by the Owner Representative for the applicable Project, Contractor shall invoice such transport charge using the hourly rate of the 5th step apprentice, or lowest job classification on the applicable Site, whichever is lower and Contractor shall only be permitted to invoice for a maximum of up to two (2) workers with respect to such material transport charge. (b) When Contractor performs flagging Services (pursuant and subject to the terms and conditions of Section 9.9(b) of this Agreement), Contractor shall invoice such flagging Services using the hourly rate of the 5th step apprentice, or lowest job classification on the applicable Site, whichever is lower. (c) If requested by Contractor in connection with the award of a Project, Contractor and the Owner Representative for such Project shall negotiate in good faith to establish in writing a reasonable guaranteed maximum for mobilization and demobilization prior to award of such Project; provided that if EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 14 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-300 Attachment 1 REDACTED Page 14 of 24 Contractor does not incur any mobilization and/or demobilization charges, then Contractor shall not invoice Owner for such expense(s). Owner shall be entitled to deny, in which case Contractor shall not be reimbursed for, mobilization and demobilization costs for failure to secure such pre-approval. 6. STATE OF CT - CONTINUING CONTRACTOR REQUIREMENTS For Work in Connecticut, Contractor shall comply with the Continuing Contracting requirements of the State of Connecticut as in effect from time to time, including the following: 6.1 The hourly rate charged for equipment shall not exceed the calculated hourly rate for such equipment based on The Rental Rate Blue Book as published by EquipmentWatch. 6.2 The rates charged to Owner for Work on State of Connecticut highways shall not exceed rates charged to Owner for any other Work. 6.3 Contractor hereby grants the DOT in Connecticut and the Federal Highway Administration the right to audit all records of Contractor and its Subcontractors pertaining to highway relocation Work. Without limiting Contractor's obligations under this Agreement, Contractor shall maintain such records for at least (i) three (3) years after Final Acceptance of any Project that is fully or partially funded by the State of Connecticut, and (ii) five (5) years after Final Acceptance of any Project that has Federal participation. 6.4 Contractor shall prepare, sign and obtain the written approval from the applicable DOT inspector in Connecticut of all Con 40/41s within fifteen (15) days after the date Contractor performed the applicable Work. Without limiting the generality of the foregoing, unless otherwise directed by the applicable Owner Representative, all Work designated with an Owner activity code of HRU, HRO, HRD or HRL shall require such preparation, submission and approval of Con 40/41s. Copies of the most recent versions of Con 40 and 41 are attached (reference Appendices F-01 and F-02, respectively, to Exhibit E, of this Agreement), and Contractor shall use such versions or approved modifications thereof. 6.5 Contractor shall provide the DOT in Connecticut with the original signed Con 40/41 at the time of signing. 6.6 Contractor shall send one copy of the approved Con 40/41 to the following Person and/or such other Persons designated in writing by Owner: Eversource Energy Service Company P.O. Box 5017 Hartford, Connecticut 06102-5017 Attention: Accounts Payable EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 15 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-300 Attachment 1 REDACTED Page 15 of 24 6.7 As a condition of payment, Contractor shall attach one copy of each approved Con 40/41 to the corresponding invoice submitted to Owner for payment. 6.8 In addition to the requirement to separately invoice each Project, within each Project, Contractor shall invoice Owner for Work on State of Connecticut highways separate from charges to Owner for any other Work. 6.9 Annually, Contractor shall execute and submit to the following Person and/or such other Persons designated in writing by Owner a Continuing Contractor Certification (reference Appendix F-03 in Exhibit E, of this Agreement), as the same may be modified from time to time by notice given by Owner to Contractor: Eversource Energy Service Company P.O. Box 270 Hartford, Connecticut 06141-0270 Attention: Manager, Contract Services 7. NON-REIMBURSABLE COSTS Notwithstanding anything to the contrary in the Work Release, Project-Specific Agreement or any other Contract Documents, and irrespective of the pricing methodology in effect for a particular Project, the following are specifically excluded from reimbursable costs, and Contractor shall bear sole responsibility for such costs: 7.1. general performance bonds (including any tax bond furnished to any Governmental Authority), Town-required license, and any other Permits that are not jobspecific; 7.2. costs for adjustment and corrective work which is due to the Contractor's improper performance of the Work; 7.3. costs for warranty and corrective work (including factory service engineer), as required, that must be performed by Contractor to correct faulty service, equipment and/or materials furnished by Contractor; 7.4. any hourly rate for labor other than Straight Time unless such Overtime or Double Time rate has been authorized in writing by the applicable Owner Representative; 7.5. invoices not accompanied by Owner Representative signed timesheets/Contractor Daily Work Reports (reference Section 12.b, Exhibit E of this Agreement); 7.6. any extra/out of scope work not supported by a Change Order signed by Owner; EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 16 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-300 Attachment 1 REDACTED Page 16 of 24 7.7. any cost for labor or equipment assigned to a Project using time and equipment and/or cost-plus pricing methodologies without the approval of the Owner Representative; 7.8. Subcontractor charges not authorized by the applicable Owner Representative for reimbursement prior to the start of such Subcontractor's work; 7.9. mobilization or demobilization charges not authorized for reimbursement by the applicable Owner Representative (in accordance with Section I, Paragraph 5.4(c) above) prior to the mobilization or demobilization; 7.10. taking an inventory of material; 7.11. construction time restrictions due to compliance with requirements of Governmental Authorities; 7.12. removal of "stuck" vehicles from show-up sites; 7.13. cleaning up the show-up site or trailers; and 7.14. travel time and expenses to locate and secure parking, show-up, laydown and/or storage area(s). 8. SUSPENSION/CANCELLATION Suspension and cancellation expenses under this Agreement shall be calculated using the methodologies for cost recovery set forth in Section 3 of this Pricing Schedule, plus, in the case of cancellation expenses, the applicable Markup Percentage Fee under Section I, Paragraph 3.7 of this Pricing Schedule; provided that: 8.1. labor costs shall include only those workers or crews of workers actually and to the extent affected by the suspension and/or cancellation; 8.2 material costs, if any, shall reflect Contractor's reasonably anticipated net actual cost for the purchase of the material needed as a result of the suspension and/or cancellation; and 8.3. equipment shall be priced at the lower of (i) the applicable rate(s) set forth in PRICING SCHEDULE - T&M; or (ii) the charges resulting from the cost-based pricing methodology in Section 3 above. 9. ACCURATE PRICING EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 17 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-300 Attachment 1 REDACTED Page 17 of 24 9.1. Accurate Invoicing. Contractor shall submit, and shall cause each Subcontractor at any tier to submit, invoicing which is accurate, current and complete, and otherwise in accordance with the terms of this Agreement. If Contractor and/or any Subcontractor submits any cost and pricing data (whether approved or not) that was inaccurate, incomplete, not current, or not in compliance with the terms of this Agreement at the time of such submittal, Owner shall appropriately adjust such pricing. Such postapproval price adjustments will apply to Contractor and all levels of Subcontractors. 9.2. Labor Detail. In furtherance of Section 3 of this Pricing Schedule, for any charges using the cost-based methodology, Contractor shall provide, and shall cause each Subcontractor at any tier to provide, a breakdown of allowable labor and labor burden cost in accordance with Section I, Paragraphs 3.1 and 3.2 of this Pricing Schedule. Such information shall represent an accurate estimate of Contractor's actual labor and labor burden cost components. 9.3. Discounts. All net earnings from rebates, refunds or discounts shall be accounted for by Contractor and applied in a reduction of the cost of the Work. All bills to be paid by Contractor on account of the Work shall be so paid as to take advantage of any and all trade, time or other discounts. 10. AUDIT RIGHTS 10.1. Additional Audit Rights. In addition to the general audit rights of Owner under Article 14.11 of the Agreement, Owner shall have the right, directly and/or through its designated representatives, to examine, copy and/or scan the records of Contractor and/or any Subcontractor at any tier (during the contract period and for each Project, six (6) years after Final Acceptance of such Project) to verify the accuracy and appropriateness of the pricing data used in accordance with this Pricing Schedule. Such records shall include any and all information, materials and data of every kind and character, including records, books, papers, documents, subscriptions, recordings, agreements, purchase orders, leases, contracts, commitments, arrangements, notes, daily diaries, superintendent reports, drawings, receipts, vouchers and memoranda, and any and all other agreements, sources of information and matters that in Owner's judgment may have any bearing on or pertain to any matters, rights, duties or obligations under or covered by pricing under this Pricing Schedule. Such records in whatever form (hard and electronic (if available) copies) shall include written policies and procedures; time sheets; payroll registers; payroll records; cancelled payroll checks; subcontract files (including proposals of successful and unsuccessful bidders, and bid recaps); original estimates; estimating work sheets; correspondence; change order files (including documentation covering negotiated settlements); backcharge logs and supporting documentation; invoices and related payment documentation; general ledger; records detailing cash and trade discounts earned, insurance rebates and dividends; and any other records which may have a bearing on matters of interest to Owner in connection with dealings with Owner to the extent necessary to adequately permit evaluation and EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 18 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-300 Attachment 1 REDACTED Page 18 of 24 verification of any or all charges. Contractor shall furnish adequate and appropriate work space to Owner for the conduct of such audit. 10.2. Verification; Access. Without limiting any of its rights and remedies hereunder, at Law and/or in equity, Owner, directly and/or through its designated representatives, shall have (a) the right to conduct verifications such as counting employees at the Site, witnessing the distribution of payroll, and verifying information and amounts through interviews and written confirmations with Contractor employees, field and agency labor, and Subcontractors; and (b) reasonable access to Contractor's facilities, including the right to interview all current or former employees and to discuss matters pertinent to the performance of this Agreement. 10.3. Cost Recovery. If an audit inspection or examination in accordance with this Pricing Schedule discloses overpricing or overcharges (of any nature including clerical errors and/or charges for Work not performed) by Contractor to Owner in excess of one percent (1%) of the aggregate billings for Work priced under this Pricing Schedule, in addition to refunding or otherwise making adjustments for the overcharges, Contractor shall fully reimburse Owner for the reasonable actual cost of Owner's audit. Any adjustments and/or payments due as a result of any such audit or inspection of Contractor's invoices and/or records shall be made within one hundred eighty (180) days after the date of the audit. 11. SUBCONTRACTORS Contractor shall incorporate and require the incorporation of the provisions of this Pricing Schedule into all agreements with Subcontractors at any tier. Such requirements shall specifically include flow-down right of audit provisions. Contractor will cooperate fully, and will cause all Subcontractors to cooperate fully, in furnishing and/or in making readily available to Owner from time to time whenever requested, in an expeditious manner, any and all information, materials and data required under this Agreement. 12. BUSINESS EXPENSE & PERSONAL TRAVEL AND LIVING EXPENSES Unless specifically addressed in other portions of the Contract Documents, whenever work is performed on a firm fixed price, unit price, or time and material basis, all costs including but not limited to, all business expenses and personal travel and living expenses shall be included in the firm fixed price, unit prices, or time and material rates. 13. DIRECT, INCREMENTAL COSTS Whenever the work is to be billed at Direct, Incremental Cost(s) as defined in the Agreement, reimbursement will be made to the Contractor at the rates as set forth in Appendix PS-5 – DIRECT, INCREMENTAL COSTS. EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20Page 19 of 24
No text on this page. It may be a picture of a page, such as a scan or a chart.Page 20 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-300 Attachment 1 REDACTED Page 20 of 24 Appendix PS-2 PRICING SCHEDULE - UNIT PRICE See attached Unit Price Schedule EVERSOURCE CONFIDENTIAL T&D Construction Pricing Schedule 04-06-20
As listed on the current system
Question(s) Answered 288, 289, 291, 292, 297, 300 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026