Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

  1. Page 1 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 1 of 34 Eversource Energy And The United Illuminating Company Exhibit B Generator Interconnection Technical Requirements April 11, 2025
  2. Page 2 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 2 of 34 Table of Contents 1 SCOPE ................................................................................................................................................................. 3 2 GENERAL CONSIDERATION .................................................................................................................................. 3 2.1 2.2 2.3 2.4 2.5 2.6 3 GENERAL DESIGN REQUIREMENTS ...................................................................................................................... 5 3.1 3.2 3.3 3.4 3.5 3.6 4 METERING.......................................................................................................................................................... 24 MONITORING AND COMMUNICATION ...................................................................................................................... 24 COMMUNICATIONS CHANNELS AND SCADA ............................................................................................................. 24 TESTING AND MAINTENANCE REQUIREMENTS ................................................................................................. 25 7.1 7.2 7.3 8 AREA NETWORKS ................................................................................................................................................. 22 SPOT NETWORKS ................................................................................................................................................. 23 METERING, MONITORING AND COMMUNICATION ........................................................................................... 24 6.1 6.2 6.3 7 GENERATOR PROTECTION PHILOSOPHY ...................................................................................................................... 9 GENERAL REQUIREMENTS ........................................................................................................................................ 9 ADDITIONAL REQUIREMENTS FOR INVERTER-BASED INSTALLATIONS ............................................................................... 13 ADDITIONAL REQUIREMENTS FOR ENERGY STORAGE SYSTEMS ...................................................................................... 16 ADDITIONAL REQUIREMENTS FOR INDUCTION GENERATORS ......................................................................................... 17 ADDITIONAL REQUIREMENTS FOR SYNCHRONOUS GENERATORS.................................................................................... 17 CLOSED TRANSITION GENERATORS .......................................................................................................................... 19 OPEN TRANSITION GENERATING FACILITIES ............................................................................................................... 20 SPECIAL PROTECTION SYSTEMS ............................................................................................................................... 21 PROTECTION SYSTEM CHANGES .............................................................................................................................. 22 INTERCONNECTING GENERATORS WITH NETWORK SYSTEMS ........................................................................... 22 5.1 5.2 6 INTERCONNECTION TRANSFORMER WINDING AND GROUNDING CONSIDERATIONS (CONFIGURATION, FERRO-RESONANCE, ETC.) 5 POWER QUALITY REQUIREMENTS.............................................................................................................................. 5 VOLTAGE REGULATION............................................................................................................................................ 6 INSULATION COORDINATION .................................................................................................................................... 7 GROUNDING AND BONDING ..................................................................................................................................... 7 ISOLATION DEVISES ................................................................................................................................................ 8 PROTECTION AND CONTROL REQUIREMENTS ..................................................................................................... 9 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 5 GENERAL REQUIREMENTS ........................................................................................................................................ 3 DISTRIBUTION IMPACT STUDY PHILOSOPHY ................................................................................................................. 3 ADVERSE IMPACT OF GENERATING FACILITY ................................................................................................................ 4 SAFE OPERATION AND MAINTENANCE ....................................................................................................................... 4 FUTURE SYSTEM CHANGES AND RESPONSIBILITIES ........................................................................................................ 4 DEFINITIONS ......................................................................................................................................................... 5 WITNESSING OF COMMISSIONING TEST.................................................................................................................... 25 PERIODIC TESTING................................................................................................................................................ 26 SAFE OPERATIONS AND MAINTENANCE .................................................................................................................... 27 STANDARDS AND APPLICABLE GUIDELINES (IEEE, UL, ANSI, ETC.) ..................................................................... 27 8.1 8.2 8.3 8.4 PRE-CERTIFIED FACILITIES ...................................................................................................................................... 27 NON PRE-CERTIFIED FACILITIES ............................................................................................................................... 27 CERTIFICATION OF GENERATOR EQUIPMENT PACKAGES ............................................................................................... 28 CODES AND STANDARDS........................................................................................................................................ 28 APPENDIX A ............................................................................................................................................................... 29 APPENDIX B ............................................................................................................................................................... 34
  3. Page 3 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 3 of 34 1 Scope These Generator Interconnection Technical Requirements (“Technical Requirements”) apply to the Interconnection of a Generating Facility to the EPS, regardless of federal or state jurisdiction. These Technical Requirements provide requirements relevant to the safety, performance, reliability, operation, design, protection, testing, metering, monitoring, control, and maintenance of the Interconnected Generating Facility. Among other things, these Technical Requirements are particularly focused on the safety of the general public and the employees and equipment of the EDC. All capitalized terms shall have the meanings specified in the glossary set forth in Attachment XI to the Guidelines for Generator Interconnection: Fast Track and Study Processes. 2 General Consideration 2.1 General Requirements Any Generator desiring Interconnection with the EPS or modification of an existing Interconnection must meet the specifications set forth in this section and any other requirements which may be imposed by the EDC, including without limitation: a. Latest approved version of the IEEE 1547 (Standard for Interconnecting Distributed Resources with Electric Power Systems) and associated 1547 standard and family of guidelines or recommended practices. b. Latest approved version of UL (Underwriters Laboratories) 1741 (Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources). c. 2.2 Latest approved version of UL 1741 supplemental version. Distribution Impact Study Philosophy Generating Facilities will be studied based on the expected operational requirements provided by developers, including, but not limited to, export limitation, charge/discharge schedules, smart inverter functionality, and intentional islanding capabilities. Protective functions will be required to ensure compliance with such operational requirements. If the developer does not provide sufficient details regarding the intended operation of the generator, the EDC will use maximum power export as the study parameter. Refer to section 4.2.8 for examples of acceptable means of export limitations.
  4. Page 4 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 4 of 34 2.3 Adverse Impact of Generating Facility Unintentional Islanding by the Generating Facility of all or part of the EPS (meaning a part of the EPS is kept energized by the Generating Facility after the EPS has de-energized the area) is prohibited as it may result in unsafe conditions on the EPS. The Generator shall comply at all times with Section 6 of the Interconnection Agreement. 2.4 Safe Operation and Maintenance The Generator shall operate and maintain the Generating Facility in accordance with Good Utility Practice and comply with all aspects of the Interconnection Agreement and applicable Guidelines and tariffs, terms and conditions. Moreover, the Generator shall comply, at all times, with all applicable laws, regulations and other legal requirements. In the event that the Generating Facility may pose an unreasonable risk to the EPS, the Interconnection Agreement provides that (a) the EDC may install equipment to monitor the Generating Facility and (b) the EDC may disconnect the Generating Facility as set forth in the Guidelines. Arc Flash: The interconnection of a Generating Facility to the EPC system shall not increase available fault current and associated arc flash energy to a level where EPC workers would have to use the next level of enhanced Personal Protective Equipment (PPE) and/or restrictive work methods above and beyond what the workers would normally use for work at the same location without the Generating Facility present. 2.5 Future System Changes and Responsibilities The EPS is dynamic and must be able to accommodate future load growth and system changes. Therefore, the EDC may, at its discretion and cost, make upgrades to the EPS. Such upgrades may have an impact on existing Generator Facilities and/or Interconnection Facilities. To ensure continued safe operations in compliance with the Interconnection Agreement, the Generator Facilities and/or Interconnection Facilities may need to be upgraded in accordance with the upgraded EPS. The Generator and the EDC will work together and cooperatively to implement the appropriate changes, upgrades, etc. to attain the common goal of continued safe and reliable operation of the interconnection of the Generator to the EPS.
  5. Page 5 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 5 of 34 2.6 Definitions a. UL1741 Throughout this document, UL1741 refers to the latest approved revision including supplements A and B of UL 1741 Inverters, Converters, Controllers and Interconnection System Equipment for Use With Distributed Energy Resources. This term may be used interchangeable to describe the main standard or supplemental revisions, including future revisions to be adopted by the EDC after the publishing of this document. b. Power Control System (PCS) An embedded or stand-alone device designed to manage and optimize power within a complex electrical system. This device may be embedded within an inverter or energy storage device and includes the capability of limiting export power. For clarity within this document, an Energy Management System (EMS) may also provide the same capabilities of a PCS. 3 General Design Requirements 3.1 Interconnection Transformer Winding and Grounding Considerations (Configuration, Ferro-resonance, etc.) In order to provide maximum operating flexibility for the Generator and to minimize possible adverse effects on the facilities of other EDC customers, the Generator shall provide, at its sole cost and expense, an interconnection transformer between the Generating Facility and the EDC-owned equipment, unless this requirement is waived in writing by the EDC in its sole discretion. The Generator shall propose to the EDC an interconnection transformer and grounding configuration, which shall be subject to the approval of the EDC at its sole discretion. The final winding connection and grounding configuration is subject to the approval of the EDC at its sole discretion. 3.2 Power Quality Requirements 3.2.1 The Generating Facility and its Interconnection system shall not inject DC current greater than 0.5% of the full rated output current at the POI. 3.2.2 The Generating Facility shall not create objectionable flicker to other EDC customers.
  6. Page 6 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 6 of 34 3.2.3 Harmonics. When the Generating Facility is serving linear loads, harmonic current injection into the EPS at the PCC shall not exceed the limits listed in the latest version of IEEE 1547 under the following test conditions: 3.2.4 a. Serving balanced linear loads b. No voltage distortion present. The Interconnection of the Generating Facility shall not increase the potential for ferro-resonance in the EPS. 3.2.5 The Interconnection of the Generator Facility shall not cause temporary under voltages or over voltages. 3.2.6 An Induction Generator may be connected and brought up to speed as an induction motor if it can be demonstrated that the initial voltage drop (visible flicker) is acceptable and within limits as defined by IEEE 519. When flicker occurs, outside of the IEEE 519 limits, soft starting will be required, such as speed matching to within 1% of synchronous speed or other techniques. 3.3 Voltage Regulation The Generating Facility shall not: (i) actively regulate the voltage of the EPS unless specifically agreed by the EDC; (ii) cause the voltage at any point along the EPS to deviate from the levels prescribed by the exemption to the upper voltage variation established by the Public Utilities Regulatory Authority by way of Decision, dated March 6, 2019, in Docket No. 03-01-15RE04 or the voltage limits established in Conn. Agencies Regs. § 16-11-115(a), whichever limits are greater (currently +5/-5% for residential and commercial customers ; or (iii) cause any voltage deviations, which are objectionable to other customers of the EDC. The EDC may regulate the voltage on the EPS by employing load tap changing transformers or line voltage regulators. These devices are typically designed for one-way (forward) power flow to properly regulate the voltage. Therefore, unless specifically waived in writing by the EDC, the Generating Facility shall be required to limit its output so that reverse power flow cannot occur when the proposed Interconnection would be expected to result in reversed power flow through a load tap changing transformer absent such limitation.
  7. Page 7 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 7 of 34 When the proposed Interconnection is expected to result in reverse power flow through line voltage regulators, control modifications necessary to mitigate the effects of the reverse power flow may be made, if practical, at the sole cost and expense of the Generator. Otherwise, the Generating Facility will be required to limit its output so that adverse levels of reverse power flow cannot occur. 3.3.1 VAR (Power Factor) a. All Generators other than Induction Generators shall be capable of operating within a power factor range of 0.9 leading to 0.9 lagging. Unless specifically determined through studies performed by the EDC and as may be specified in the Interconnection Agreement, the power factor as measured at the PCC shall be within such range. If the power factor is outside of this range the method and compensation for power factor correction shall be determined by the EDC. b. The VAR requirements for Induction Generators shall be determined by the EPS. For aggregate generation of up to and including 100 kW, there will be no charge to the Generator. For aggregate generation greater than 100 kW, the EDC shall charge the Generator a one-time “capacitor charge” to cover the cost of supplying the reactive current to the Generating Facility. This “capacitor charge” shall be based on 0.5 kVAR of capacitors per kW of generator nameplate capacity and will be based on the prevailing rate of installed cost per KVAR by utility grade equipment. 3.4 Insulation Coordination The Generating Facility and all other equipment connected to the EPS (even in closed transition mode) must be able to withstand the normal and abnormal voltages that can be experienced on the EPS (i.e., normal and abnormal voltages shall not cause damage to or reduce the reliability of any connected equipment). The Generator shall be responsible for procuring equipment with a level of insulation and fault withstands capability compatible with the grounding method specified below. 3.5 Grounding and Bonding 3.5.1 The grounding scheme of the Generating Facility Interconnection shall not cause overvoltages that exceed the rating of the EDC’s equipment connected to the EPS and shall not disrupt the coordination of the ground fault protection on the EPS.
  8. Page 8 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 8 of 34 3.5.2 Generating Facility shall be effectively grounded. To achieve effective grounding, the DER owner shall design and install an interconnection system where the ratio of the DER’s reactance parameters meets the following criteria: a. 1<X0 / X1<3 b. R0/X1<1 Where, X0 is the zero-sequence reactance at the PCC R0 is the zero-sequence resistance at the PCC X1 is the positive sequence reactance at the PCC 3.6 Isolation Devises 3.6.1 Low Voltage Applications (<= 600 volts): For voltages equal to or less than 600 volts on the EPS, the Generator shall own, install, operate and maintain an external Isolation Device (or comparable device mutually agreed upon by the parties) for the Generating Facility that can be opened for isolation. The Isolation Device shall be operated by the Generator’s personnel and shall be in a location easily accessible by EDC personnel at all times. The Isolation Device shall: (i) be gang operated; (ii) have a visible break when open; (iii) be rated to interrupt the maximum Generator Facility output; and (iv) be capable of being locked open. Although EDC personnel will normally not operate the Isolation Device, the EDC reserves the right to have its personnel open the Isolation Device in an emergency. If an existing Isolation Device at the Generating Facility meets the requirements of this section, then this requirement of an additional Isolation Device may be waived by the EDC. The Generator shall maintain the Isolation Device in good working condition. The EDC shall not be responsible for any damage to the disconnect switch or the Isolation Device. 3.6.2 High Voltage Applications (> 600 volts): The EDC shall own, install, operate and maintain the Isolation Device when the Isolation Device is required to be installed at voltages greater than 600 volts on the EPS. The EDC will determine the size, type and rating of such Isolation Device. An existing Isolation Device, if deemed adequate for the application by the EDC, may be sufficient. If a new Isolation Device is required, then the cost of such device, including the installation thereof, will be borne by the Generator.
  9. Page 9 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 9 of 34 4 Protection and Control Requirements 4.1 Generator Protection Philosophy One of the core objectives of these Technical Requirements is to protect the public, EDC personnel and the EPS from unsafe or unstable operating conditions. Therefore, much of the focus of these Technical Requirements is on the use of protective functions designed to prevent the Generating Facility from causing a system failure or propagating disturbances onto the EPS during normal operations. Such requirements are designed solely to protect the public (and EDC employees) and the EPS and are not designed to protect the Generating Facility or the Generator’s other facilities and equipment. The Interconnection of the Generating Facility to the EPS will not be allowed to degrade the reliability of the EPS either as a result of its operation or as a result of changes to the EPS to accommodate the Interconnection. From time to time, protective relays and microprocessors used in protective relays and inverters must be removed from service for maintenance, testing, and revision upgrades. During such times, the Generating Facility shall not operate in parallel with the EPS without adequate protection in service and functioning as approved. Additionally, for firmware upgrades, the EDC may require witness testing by the EDC to determine the success of any such upgrade. The Generating Facility is required to review any such upgrade with the EDC before any such upgrade is attempted. 4.2 General Requirements 4.2.1 Section 2.1 of these Technical Requirements is generally applicable to all of these Technical Requirements and should be reviewed in concert with Section 4. 4.2.2 The specifications and requirements listed herein are intended solely to mitigate possible adverse impacts caused by the Generating Facility to the EDC’s equipment and to the reliability of its EPS as well as to protect the safety of the EDC’s personnel, the public, and other customers of the EDC. They are not intended to address protection of the Generating Facility itself or internal load on the Generating Facility side of the PCC. It is the responsibility of the Generator to comply with the requirements of all appropriate standards, codes, statutes, and authorities to protect itself and its loads. The Generator must be aware of the risk of single phasing and of voltage transients (and other normal system disturbances as described herein) that accompany Interconnection with the EPS. In accordance with the Interconnection Agreement, it is the Generator’s responsibility to protect the Generating Facility from these risks. 4.2.3 The EDC shall make available to, upon request, system protection information directly related to
  10. Page 10 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 10 of 34 the Point of Interconnection, which information may be used by the Generator solely to evaluate protection of its Generating Facility during parallel operation and for no other purpose. 4.2.4 The design of the Generating Facility’s protection and control scheme shall take into account the EDC’s practice of automatically reclosing portion(s) of its EPS without synchronism check after one or more portion(s) of the EPS have been tripped. The de-energized portion of the EPS may be reenergized at any time after de-energization. If the EDC’s reclosing practices are found to be incompatible with the Interconnection of the Generating Facility, the EDC may choose to modify the EPS to accommodate that Interconnection, which modification shall be at the Generator’s sole cost and expense. 4.2.4.1 Unless otherwise agreed by the EDC, if the Generating Facility has been tripped off-line, then the Generating Facility’s control system shall not permit the Generating Facility to be reconnected to the EPS for at least five (5) minutes after normal system conditions are reestablished. 4.2.4.2 The Generating Facility shall be designed to accommodate reclosing of the EPS even if no reclosing exists at the time of Interconnection. If the Generating Facility’s protection cannot be designed to be compatible with the EDC’s reclosing practices, other anti-Islanding measures will be required at the Generator’s sole cost and expense (e.g., a dedicated circuit supply or direct transfer trip protective relaying from all EDC sources and isolation points). 4.2.5 Protective relays required by these Technical Requirements shall either be Utility Grade or certified to UL 1741 and IEEE C62.41 and IEEE C62.45, as amended from time to time. Equipment tested to UL 1741 needs only prove compliance with latest revision and supplements. The time characteristics of these relays must be reviewed and approved by the EDC prior to purchase by the Generator in order to achieve coordinated timing with the EDC’s protective devices. 4.2.6 The Generating Facility shall not operate in parallel with the EPS without properly functioning protective equipment required by these Technical Requirements. 4.2.6.1 Generating Facilities (of less than or equal to 1 MW in size) are not required to provide redundancy in protective functions. However, if such a Generating Facility desires to operate in parallel with the EPS with its required protective equipment out of service, the design of that facility shall include redundant protection functionality installed in parallel to facilitate the removal of that protective relaying from service for any reason.

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

Text of ICC-001 Attachment 5.pdf

Extracted from the file · 67 pages · 136,480 characters

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)