Interrogatory responses
Answers to questions 1, 2, 4, 10, 18, 20
Files13
ICC-001_Final.pdf
PDF · 114 KB · 1 pageText searchable
Download ICC-001_Final.pdfRead the text of ICC-001_Final.pdf
ICC-001 Attachment 1.pdf
PDF · 3.4 MB · 28 pagesText searchable
Download ICC-001 Attachment 1.pdfRead the text of ICC-001 Attachment 1.pdf
ICC 001 Attachment 2.pdf
PDF · 4.0 MB · 68 pagesText searchable
Download ICC 001 Attachment 2.pdfRead the text of ICC 001 Attachment 2.pdf
ICC-001 Attachment 3.pdf
PDF · 1.1 MB · 34 pagesText searchable
Download ICC-001 Attachment 3.pdfRead the text of ICC-001 Attachment 3.pdf
ICC-001 Attachment 4.pdf
PDF · 1.3 MB · 34 pagesText searchable
Download ICC-001 Attachment 4.pdfRead the text of ICC-001 Attachment 4.pdf
ICC-001 Attachment 5.pdf
PDF · 3.5 MB · 67 pagesText searchable
Download ICC-001 Attachment 5.pdfRead the text of ICC-001 Attachment 5.pdf
ICC-002_Final.pdf
PDF · 143 KB · 2 pagesText searchable
Download ICC-002_Final.pdfRead the text of ICC-002_Final.pdf
ICC-002 Attachment 1.pdf
PDF · 1.1 MB · 29 pagesText searchable
Download ICC-002 Attachment 1.pdfRead the text of ICC-002 Attachment 1.pdf
ICC-002 Attachment 2.pdf
PDF · 1.5 MB · 74 pagesText searchable
Download ICC-002 Attachment 2.pdfRead the text of ICC-002 Attachment 2.pdf
ICC-002 Attachment 3.pdf
PDF · 2.5 MB · 27 pagesText searchable
Download ICC-002 Attachment 3.pdfRead the text of ICC-002 Attachment 3.pdf
ICC-004_Final.pdf
PDF · 127 KB · 1 pageText searchable
Download ICC-004_Final.pdfRead the text of ICC-004_Final.pdf
ICC-010_Final.pdf
PDF · 168 KB · 4 pagesText searchable
Download ICC-010_Final.pdfRead the text of ICC-010_Final.pdf
ICC-018_Final.pdf
PDF · 135 KB · 2 pagesText searchable
Download ICC-018_Final.pdfRead the text of ICC-018_Final.pdf
Page 11 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 11 of 34 4.2.6.2 Generating Facilities (above 1MW in size) shall be designed in a manner such that the Generating Facility protection shall provide sufficient redundancy in protective function(s) so that no single protective equipment failure can remove any protective function required by the EDC. 4.2.7 The EDC has adopted UL 1741 (including IEEE C62.41) for certifying the electrical protective functionality of independent power systems, including Generating Facilities. UL 1741 compliance may be established by UL or other Accredited, Nationally Recognized Testing Laboratories (NRTL). The EDC also accepts inverter-based Generating Facilities that are installed in multiple packs and that have been certified to UL 1741 in this configuration. 4.2.8 Generating Facilities that are not intended to export power to the EPS but which are capable must use an EDC approved method of limiting export. Similarly, generating facilities which do intend to export power to the EPS may be required by the EDC to limit export below an identified threshold. 4.2.8.1 Generating facilities greater than or equal to 200kW and are capable of exporting power to the EPS must include either: a. a reverse power (32R) or b. a under-power (32U) relay or c. a corresponding function in a multifunction microprocessor. A reverse power element (32R) operates whenever power is exported from a Generating Facility onto the EPS for periods beyond those expected during normal system transient conditions. An underpower element (32U) ensures the Generating Facility is always importing some preset level of power. If the import level drops below the “under-power” threshold, then the element will operate to trip the Generating Facility. The under-power element (32U) must be used in cases where a reliable (32R) (export trip) cannot be guaranteed. (See Appendix A for recommended settings). 4.2.8.2 Generating facilities which are less than 200kW may utilize a PCS, EMS, or other agreed upon means to limit export of the facility to the EPS. The EDC may allow the use of new technologies as they become available to the public. Any PCS, EMS, or other device will require review and approval by the EDC.Page 12 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 12 of 34 4.2.8.3 It is recognized that for business model reasons, for technical reasons such as limitations in an existing facility, or for process reasons such as the acceleration of the application approval or reduction in studies required, the Generator may choose to operate the facility exclusively in a non-export mode. 4.2.9 The Generator shall submit to the EDC for review and acceptance the settings for all devices with protection functions that could affect the Interconnection. These devices include all relays, adjustable inverters and controllers that provide protective functions used for EDC-required protection. These settings shall be provided to the EDC no later than twenty (20) Business Days prior to the scheduled date for setting those relays/inverters/controllers. The Generator shall provide both a paper and an electronic copy of the setting file for all settings within any electronic multifunction relay. The Generator must also provide the most recent revisions to the schematics and wiring diagrams listed in Attachment I to the applicable Guidelines (“Interconnection Request”). The Generator shall also submit to the EDC a written description of the operation as programmed for each of the protective relay schemes that could affect the Interconnection. Each such protective relay scheme description shall list all inputs to the protective relay, the function(s) performed on these inputs, and a list of all outputs driven by the relay. The vendor instruction manual will not be acceptable for this purpose. 4.2.10 Over-and under-voltage and over-and under-frequency protective relay functions are required for all Generating Facilities interconnected to the EPS. This requirement also applies to closed transition transfer schemes that result in the Generating Facility operating in parallel to the EPS for 100 milliseconds or longer. Voltage sensing on all three phases shall be used for the required voltage relaying for maximum sensitivity for phase disturbances. 4.2.11 All protection functions required by the EDC for protection of its EPS shall be designed in such a way that a loss of AC power will not compromise that protection. Acceptable methods include but are not limited to: undervoltage trip, DC battery systems, and UPS systems. 4.2.12 An Interconnection interrupting device such as a circuit breaker or contactor shall be installed to isolate the Generating Facility from the EPS. All such Interconnection interrupting devices must be capable of interrupting the maximum available short circuit current and the current produced when the Generating Facility is connected out of phase. For the avoidance of doubt, if the Generating Facility has multiple interrupting devices, this requirement applies to each such device. 4.2.13 An interconnection circuit breaker equipped with all appropriate protective devices defined in this document shall be located at the PCC in addition to any required interrupting device(s) andPage 13 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 13 of 34 protection devices required at the generator. However, if a Generator meets certain requirements, the EDC may elect to waive the separate protection devices at the PCC. In order for the EDC to consider waiving the separate protection devices at the PCC all of the following conditions must be met (unless waived by the EDC): a. Total Generation Facility Capacity is less than 1MW. b. Generation Facility Capacity is less than 1/3 of its total minimum load. c. Generating Facility is designed as a net-import facility at all times (no power exported to EPS). d. Generator has interrupting and protection devices meeting all other requirements in this document. 4.2.14 Voltage relays that can be connected directly to the Generating Facility’s line voltage without a voltage transformer (VT) are acceptable to the EDC 4.2.15 Unless otherwise agreed by the EDC in writing, protective relay schemes shall be hardwired to the device they are tripping. Test switches are required in the current, voltage and trip circuits. 4.2.16 Current Transformer (CT) ratios and accuracy classes for CTs as used in the Generating Facility protection shall be consistent with ANSI and IEEE standards. 4.2.17 Voltage Transformers The Generating Facility shall be equipped with a direct voltage connection or a VT, which shall be connected to the EDC’s side of the interrupting device. For three-phase applications, a VT for each phase is required. If the interconnecting voltage transformer is ungrounded at the EDC voltage, this VT shall be a single three-phase device or three single-phase devices connected from each phase to ground on the EDC’s side of the Generating Facility’s interconnecting transformer, rated for phaseto phase voltage. The secondary winding shall be connected in open delta, have a loading resistor to prevent ferroresonance, and supply a zero-sequence over-voltage relay. On one side of the relay/resistor, the connection shall be grounded. Relays that (i) are capable of calculating zero-sequence voltages, and (ii) can be directly connected at the utilization voltage, may be utilized in lieu of grounded-wye to open delta VTs. 4.3 Additional Requirements for Inverter-Based Installations Current inverter systems are capable of performing many of the required protective functions internally, without the need for additional protective equipment. Therefore, additional standards are applicable to inverter-based technologies. Two external standards shall apply to inverter-based Interconnections: (1) IEEE Standard 1547, (Standard for Interconnecting Distributed Resources with Electric Power Systems): and (2) UL Standard 1741 and UL Standard 1741 SA, “Inverters,Page 14 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 14 of 34 Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources.” These standards set forth the nominal voltage and frequency parameters that must be met and the limits allowed for anomalies such as flicker and interference, as well as the time allowed for disconnection when the required parameters are no longer being met or for reconnection following a system failure or automatic disconnection. The EDC recognizes the concept of “Type Certification” (sometimes called pre-certification) which requires that the inverter-based units undergo standardized testing, usually by an Accredited Nationally Recognized Testing Laboratory (e.g., Underwriter’s Laboratory), and that the results of those tests be made publicly available. Type certified units typically must also be “listed” by the laboratory and the equipment labeled as such. Advanced inverters also provide grid support functionality and can assist with resource availability in the event of a bulk power system or other disturbance. As such and unless agreed upon by the EDC, inverters must also be set as per the guidance provided in Appendix C. 4.3.1 The technical requirements for certified inverter based Generating Facilities, 25kW and less, are found in a separate document, the Eversource Energy/UI “Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 25 kW (ac) or Less.” 4.3.2 The requirements of UL 1741may be applied to inverters with photovoltaic and other electric energy sources. An inverter is considered approved if it is certified to the UL 1741 testing procedure and it has passed the required tests without failure to comply with IEEE C62.41 and C62.45. Proof of certification under UL1741 and compliance with IEEE C62.41, and C62.45 shall be required. As of May 7, 2007, UL 1741 includes the requirements within it of IEEE C62.41, and C62.45. Therefore, equipment tested to UL 1741 after that date need only prove compliance with UL 1741. 4.3.3 It is the Generator’s responsibility to submit written evidence that the proposed Generating Facility has been UL 1741 certified. Generators should contact the Generating Facility’s supplier to determine if it has been listed. 4.3.4 Non-certified inverters must have either non-islanding or anti-islanding protection as defined by IEEE 1547 and conform to the maximum harmonic limits prescribed in IEEE 519. Non-certified inverters must be protected by certified or Utility-Grade Relays, using settings approved by the EDC. 4.3.5 Self-commutated inverters with external frequency sensing may be used to synchronize the Generating Facility with the EPS. The following requirements apply to such inverters:Page 15 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 15 of 34 4.3.5.1 The Generator shall use one or more synchronizing devices such as motorized breakers, contactor/ breaker combinations, or a fused contactor (if mutually agreeable) to connect the Generating Facility to the EPS. This synchronizing device shall not be the Interconnection interrupting device. This synchronizing device shall be capable of interrupting the current produced when the Generating Facility is connected out of phase with the EPS consistent with IEEE 1547, Section 4.1.8.3. 4.3.5.2 All synchronizing shall be done by the Generator at the Generating Facility. The Generating Facility shall not be used to energize a de-energized EDC circuit. 4.3.5.3 In-line breakers, contactors, or switches without synchronizing devices require electrical or mechanical interlocks to prevent out-of-phase closing with the EPS. 4.3.5.4 All synchronizing schemes used for interconnecting a Generating Facility with the EPS must conform to the synchronizing requirements of the latest version of IEEE 1547. Automatic synchronizing schemes are preferred.Page 16 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 16 of 34 4.4 Additional Requirements for Energy Storage Systems 4.4.1 Impact Study Requirements: 4.4.1.1 In order to conduct a distribution impact study for a Storage System, a proposed dispatch limiting schedule (DLS) shall be provided to the EDC by the developer. The DLS will include the maximum dispatch schedule for both charging and discharging activity of the system as shown in the sample tables below. The time shown in the table row is for reference only and can be changed by the developer to fit their intended operational schedule. See Table 4-1 and Table 4-2 below. 4.4.1.2 Prior to developing a DLS, the EDC must provide minimum load or peak load data for the substation and circuit. The minimum load data for charging and discharging will be provided for all four seasons, Spring (March, April and May), summer (June, July and August), Fall (September, October and November) and Winter (December, January and February). The following data will be developed during a distribution Feasibility study as described in the Guidelines for Generator Interconnection Fast Track and Study Process. Alternatively, such data may be provided in the EDC hosting capacity maps in which case, no study will be required. 4.4.1.3 The EDC’s will conduct a Distribution Impact Study based on submitted DSL within the schedule windows proposed for the peak load and minimum load/peak generation day. Based on results of the study analysis, the EDC may communicate the need for adjustments to the DSL in order to avoid distribution system upgrades. 4.4.1.4 Compliance with the approved DSL for each project will be treated as a required operational restriction and detailed in the Interconnection Agreement. Enforcement of this required compliance, such as a Real Time Automatic Controller or a DER management system, will be determined by the EDC. Refer to section 6 for Monitoring and control requirements. Maximum Discharge (MW) Discharge Limiting Schedule Spring (March, April, May) Summer (June, July, August) Fall (Sep, Oct, Nov) 8:00 – 10:00 10:00 – 16:00 16:00 – 18:00 18:00 – 8:00Page 17 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 17 of 34 Winter (Dec, Jan, Feb) Table 4-1 Maximum Charge (MW) Charge Limiting Schedule 8:00 – 10:00 10:00 – 16:00 16:00 – 18:00 18:00 – 8:00 Spring (March, April, May) Summer (June, July, August) Fall (Sep, Oct, Nov) Winter (Dec, Jan, Feb) Table 4-2 4.5 Additional Requirements for Induction Generators Unless the EDC shall determine otherwise, there are no additional protection requirements applicable only to Induction Generators. 4.6 Additional Requirements for Synchronous Generators The following additional relay functions are required for Synchronous Generators. Settings for these relays shall be submitted to the EDC for review. See Appendix 4.2.8A for setting guidance. 4.6.1 Relays for Synchronous Generators a. 51V Over-Current (Voltage Control or Restrained). This element provides backup phase overcurrent protection for system faults under a collapsed voltage condition. b. 59G Over-Voltage (Ground). This element detects ground faults in the event that a ground N over-current source is lost. When studies show it can operate reliably, an alternative to the 59G is a 51N over-current (Ground). This element provides ground over-current protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value. c. 25 Synchronizing or Synch-Check. This element supervises the operation of the Generator automatic or manual synchronizing system by ensuring proper voltage phase angle matching and, where appropriate, slip frequency between the EPS and the Generating Facility before the breaker is allowed to close. 4.6.2 Relays settings for Synchronous GeneratorsPage 18 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 18 of 34 Any or all of the following additional relay functions may be required by the EDC. Settings for these relays shall be submitted to the EDC for review. See Appendix A for setting guidance. 4.6.2.1 32R Reverse Power. This element is used on systems designed as import only systems to ensure no power is exported onto the EPS. 4.6.2.2 32U Under-Power. This element performs a similar function to the 32R element, except it ensures the Generating Facility is always importing some level of power. 4.6.2.3 46 Negative Sequence Current. This element serves to protect both the EPS and the Generator system from system unbalances including single phasing. 4.6.2.4 51 Phase Over-Current. This element provides over-current protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value. 4.6.2.5 51N Ground Over-Current. This element provides ground over-current protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value. 4.6.2.6 67 Directional Phase Over-Current. This element provides directional phase over-current protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value in a specified direction. 4.6.2.7 67N Directional Ground Over-Current. This element provides directional ground over-current protection and operates with an inverse time-current characteristic when its current exceeds a predetermined value in a specified direction. 4.6.2.8 86 Lockout Relay. This auxiliary relay is electrically tripped by the Generating Facility protection and in turn trips the isolating circuit breaker(s). It can only be reset manually after all protective trips have been cleared. 4.6.3 Synchronizing DevicesPage 19 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 19 of 34 4.6.3.1 The Generator shall designate one or more synchronizing device(s) such as motorized breakers, contactor/breaker combinations, or a fused contactor (if mutually agreeable) to be used to connect the Generating Facility to the EPS. This synchronizing device may be a device other than the Interconnection interrupting device. The synchronizing device must be capable of interrupting the current produced when the Generating Facility is connected out of phase with the EPS consistent with IEEE 1547, Section 4.1.8.3 as amended from time to time. 4.6.3.2 All synchronizing will be done by the Generator at the Generating Facility. The Generating Facility shall not be used to energize a de-energized EDC circuit. 4.6.3.3 In-line breakers, contactors, or switches without synchronizing devices require electrical or mechanical interlocks to prevent out-of-phase closing with the EPS. 4.6.3.4 All synchronizing schemes used for interconnecting a Generating Facility with the EPS must conform to the synchronizing requirements within the current version of IEEE 1547. Automatic synchronizing schemes are preferred. 4.6.3.5 The Generator shall provide relaying functions to clear both phase and ground short circuit faults on the EDC’s distribution circuit. The operating characteristics thereof shall be subject to review and approval by the EDC. 4.7 Closed Transition Generators 4.7.1 A closed transition, “make-before-break” Generating Facility must be synchronized with the EPS prior to transfer occurring. The transfer scheme will then parallel the Generating Facility with the EPS for less than 100 milliseconds. During this brief period, the load will be either transferred to the Generating Facility from the EPS or to the EPS from the Generating Facility. The design of the transfer scheme shall prevent the possibility of sustained parallel operation of the Generating Facility with the EPS. 4.7.2 The closed transition scheme and transition equipment used by the Generator must be reviewed and approved by the EDC prior to operation of the Generating Facility. The closed transition scheme must provide voltage, frequency and phase angle matching as appropriate to provide a smooth transition. It must also provide maximum paralleling time protection. This protection is described below in Section 4.6.3. 4.7.3 Protective relays isolating the Generating Facility from faults in the EPS shall not be required if thePage 20 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 20 of 34 paralleling operation is automatic and takes place for less than 100 milliseconds. Maximum paralleling time protection must be provided by a separate device from the equipment used for control and paralleling of the generator and operation of the transfer switch. (See Appendix B for details on the required logic for this protection.) This protection shall (i) use a discrete solid-state timer (pneumatic timers are unacceptable for this purpose), (ii) be powered by the generator battery and (iii) trip an interrupting device (which may be the generator breaker) that ceases parallel operation of the generator. This requirement shall prevent sustained operation should the control equipment malfunction. 4.7.4 The parallel operation of a closed transition Generating Facility lasting 100 milliseconds or more requires the same protective relay functions as would a Generating Facility operating in sustained parallel operation with the EPS as described in these Technical Requirements. 4.7.5 The Generator, at a minimum, must perform the following functional tests after its transfer equipment has been energized, but before the closed-transition transfer is allowed on the EPS as a normal operation: a. Voltage, frequency, and phase rotation. b. Transfer test (maximum paralleling time must be less than 100 milliseconds); and c. Excessive parallel time test (when the EDC source switch fails to open), the protection must trip an interrupting device (which may be the Generating Facility’s breaker) that ceases parallel operation of the generator. The EDC must be notified ten (10) Business Days in advance of such testing so that it may, at its option, have its personnel observe the testing, and/or inspect the installation. 4.7.6 Before the approval of closed-transition transfer is granted by the EDC, the Generator must provide to the EDC a report attesting to the successful completion of the above testing. Upon receipt by the EDC of the approved test and inspection reports, along with a verification of the local Electrical Inspector’s approval, the EDC will issue a written notice of approval of closed-transition transfer to the Generator. 4.8 Open Transition Generating Facilities Connection of a Generating Facility with open transition transfer does not require an Interconnection Application and is permissible on the condition that such Generating Facility’s manual or automatic transfer switch will not allow any parallel operation of the Generating Facility
Text of ICC-001 Attachment 4.pdf
Extracted from the file · 34 pages · 72,650 characters
Text of ICC-001 Attachment 5.pdf
Extracted from the file · 67 pages · 136,480 characters
Text of ICC-002_Final.pdf
Extracted from the file · 2 pages · 2,788 characters
Text of ICC-002 Attachment 1.pdf
Extracted from the file · 29 pages · 46,015 characters
Text of ICC-002 Attachment 2.pdf
Extracted from the file · 74 pages · 148,550 characters
Text of ICC-002 Attachment 3.pdf
Extracted from the file · 27 pages · 91,051 characters
Text of ICC-004_Final.pdf
Extracted from the file · 1 page · 983 characters
Text of ICC-010_Final.pdf
Extracted from the file · 4 pages · 11,507 characters
Text of ICC-018_Final.pdf
Extracted from the file · 2 pages · 2,628 characters
As listed on the current system
Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026