Interrogatory responses
Answers to questions 1, 2, 4, 10, 18, 20
Files13
ICC-001_Final.pdf
PDF · 114 KB · 1 pageText searchable
Download ICC-001_Final.pdfRead the text of ICC-001_Final.pdf
ICC-001 Attachment 1.pdf
PDF · 3.4 MB · 28 pagesText searchable
Download ICC-001 Attachment 1.pdfRead the text of ICC-001 Attachment 1.pdf
ICC 001 Attachment 2.pdf
PDF · 4.0 MB · 68 pagesText searchable
Download ICC 001 Attachment 2.pdfRead the text of ICC 001 Attachment 2.pdf
ICC-001 Attachment 3.pdf
PDF · 1.1 MB · 34 pagesText searchable
Download ICC-001 Attachment 3.pdfRead the text of ICC-001 Attachment 3.pdf
ICC-001 Attachment 4.pdf
PDF · 1.3 MB · 34 pagesText searchable
Download ICC-001 Attachment 4.pdfRead the text of ICC-001 Attachment 4.pdf
ICC-001 Attachment 5.pdf
PDF · 3.5 MB · 67 pagesText searchable
Download ICC-001 Attachment 5.pdfRead the text of ICC-001 Attachment 5.pdf
ICC-002_Final.pdf
PDF · 143 KB · 2 pagesText searchable
Download ICC-002_Final.pdfRead the text of ICC-002_Final.pdf
ICC-002 Attachment 1.pdf
PDF · 1.1 MB · 29 pagesText searchable
Download ICC-002 Attachment 1.pdfRead the text of ICC-002 Attachment 1.pdf
ICC-002 Attachment 2.pdf
PDF · 1.5 MB · 74 pagesText searchable
Download ICC-002 Attachment 2.pdfRead the text of ICC-002 Attachment 2.pdf
ICC-002 Attachment 3.pdf
PDF · 2.5 MB · 27 pagesText searchable
Download ICC-002 Attachment 3.pdfRead the text of ICC-002 Attachment 3.pdf
ICC-004_Final.pdf
PDF · 127 KB · 1 pageText searchable
Download ICC-004_Final.pdfRead the text of ICC-004_Final.pdf
ICC-010_Final.pdf
PDF · 168 KB · 4 pagesText searchable
Download ICC-010_Final.pdfRead the text of ICC-010_Final.pdf
ICC-018_Final.pdf
PDF · 135 KB · 2 pagesText searchable
Download ICC-018_Final.pdfRead the text of ICC-018_Final.pdf
Page 21 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 21 of 34 with the EPS. This electrical state (i.e., open transition transfer) is typically referred to as “breakbefore-make,” which means that the Generating Facility’s transfer switch must be designed and operated to prevent the EPS-provided power and the Generating Facility-provided power from powering the Generator’s facility circuits (i.e., load) at the same time. Consequently, this mode of operation will also prevent the Generating Facility from potentially energizing the EPS. 4.9 Special Protection Systems 4.9.1 The EDC May Require additional anti islanding protection Whenever: 4.9.1.1 The minimum load to generation on a circuit creates the possibility that an unacceptable abnormal operating condition could occur. 4.9.1.2 It is determined that the Generating Facility’s protective relaying may not operate during certain conditions or faults; or 4.9.1.3 The installation could increase the length of outages on a distribution circuit or jeopardize the reliability of the circuit. The Generator shall be responsible for all costs and expenses incurred by the EDC to install additional anti-islanding protection. EDC may require a Dynamic Risk of Islanding Study in order to evaluate the risk of unintentional islanding. 4.9.2 High Speed Protection If the EDC determines that relaying used traditionally on the distribution system cannot operate quickly enough to avoid adverse system impacts, the EDC may require that the Generating Facility use either direct transfer tripping techniques or more sophisticated techniques that rely on protective relay communication to increase operating speed. 4.9.3 Recloser Schemes Any Generating Facility proposed for Interconnection at a point on the EPS that is supplied by an existing recloser scheme shall require special studies to determine the feasibility of that Interconnection as proposed. The Interconnection of the Generating Facility to the EPS shall notPage 22 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 22 of 34 degrade the reliability of the EPS as a result of either its operation or changes to the EPS to accommodate the Interconnection. If the Generating Facility’s protection cannot be designed to meet these requirements, other anti-Islanding measures will be required (such as a dedicated circuit supply or DTT protective relaying from all EDC isolation points). Any changes to the EPS’s protective schemes or settings, or to the Generating Facility necessary to accommodate the Interconnection shall be at the Generator’s sole cost and expense. 4.10 Protection System Changes 4.10.1 The Generator shall provide the EDC with reasonable advance notice of any proposed modifications to the Generating Facility’s protective relay system, relay settings, operating procedures or other equipment affecting the Interconnection. The EDC will determine if such proposed modifications require re-acceptance of the Interconnection per the requirements of this Section 4. 4.10.2 The EDC shall provide the Generator with reasonable advance notice of any proposed changes to be made to its protective relay system, relay settings, operating procedures or other equipment that affects the Interconnection. 5 Interconnecting Generators with Network Systems Other sections of these Technical Requirements are applicable to Generating Facilities interconnected with radial primary or secondary distribution circuits, the most common distribution configuration. In large cities, however, a number of electric utility companies use lowvoltage network systems. These low-voltage networks are of two subtypes: (1) the secondary grid network (also referred to as an area network, grid network, or street network) that serve; numerous sites, usually several city blocks, from a highly interconnected grid at 120/208 V, threephase; and (2) the Spot Network that serve independent, large buildings usually at 277/480 V, three-phase. When completed, the IEEE standard development project P1547.6, “Draft Recommended Practice for Interconnecting Distributed Resources with Electric Power Systems Distribution Secondary Networks”, will cover both secondary grid networks and Spot Networks. 5.1 Area Networks A Generating Facility proposed to be interconnected to the load side of an Area Network protector must utilize an inverter-based equipment package and, when aggregated with other inverter-basedPage 23 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 23 of 34 generation, shall not exceed 50 kW at any location. A location is defined as any manhole or service box. This criteria is designed to ensure that no more than 50 kW of DG is located between the same set (s) of cable limiters. In addition, the aggregate DG interconnected to an area network will be limited to 3% of the maximum network transformer connected kVA with the feeder supplying the largest number of network units out of service, or a maximum of 500 kW, whichever is less. 5.2 Spot Networks A Generating Facility proposed to be interconnected to the load side of Spot Network protectors must utilize an inverter-based equipment package and, when aggregated with other inverter-based generation, shall not exceed the lesser of five percent (5%) of a Spot Network’s maximum load or 50 kW. The inverter must be certified to stop conducting prior to the three (3) cycle response of the network protector relays. In addition, all the following requirements of IEEE 1547 must be met as amended from time to time: 5.2.1 Network protectors shall not be used to separate, switch, serve as breaker failure backup, or in any manner isolate a Generating Facility’s network or network primary feeder from the remainder of the EPS, unless such protectors are rated and tested per applicable standards for such an application. 5.2.2 Each Generating Facility connected to a Spot Network shall be coordinated with the EPS such that it will not affect the operation or prevent closing of any network protectors installed on the Spot Network. Such coordination shall be accomplished without any changes to prevailing network protector clearing time practices of the EPS. 5.2.3 Connection of the Generating Facility to the EPS shall be permitted only if the EPS network bus is already energized by more than 50% of the installed network protectors are in operation. 5.2.4 The Generating Facility’s output shall not cause any cycling of network protectors. The Interconnection of the Generating Facility shall not cause the network equipment loading and fault interrupting capacity to be exceeded. 5.2.5 Any Generating Facility installation on a Spot Network that utilizes an automatic transfer scheme in which load is transferred between the Generating Facility and the EPS in a momentary “makebefore-break” operation shall meet all the requirements of Section 5.2 regardless of the duration of paralleling. 5.2.6 The Generating Facility shall not utilize a stand alone inverter capable of operation independent of the EPS.Page 24 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 24 of 34 6 Metering, Monitoring and Communication 6.1 Metering Metering requirements varies depending on the applicable Tariff. EDC to post metering requirement by Tariff on Company web page. a. For Eversource: Please refer to Information & Requirements for Electric Supply Below 600 Volts b. For UI: Please refer to Guidebook of Requirements for Electric Service 6.2 Monitoring and Communication All DER, regardless of technology, certified and non−certified DER equal or greater than 500 kW require SCADA visibility for standalone facilities and behind−the−meter facilities. However, on a case−by−case basis, the EDC reserves the right to require DSCADA visibility as required. Specific technical requirement will be published by EDC on each individual web page. The Generator shall be responsible for costs and expenses incurred by the EDC in connection with the purchase, installation, operation, maintenance, testing, repair or replacement of its metering and SCADA (supervisory control and data acquisition) equipment. Facility metering (and data acquisition, as required) equipment shall conform to EDC rules and applicable operating requirements. All metering devices shall conform to applicable American National Standard Institute (ANSI) C-12 standards, as amended from time to time. Metering of watt-hour, reactive volt-ampere-hour and the associated demand components should conform to ANSI standard C-12. Instrument transformers should conform to ANSI standard C57.13. This document only addresses SCADA required by the EDC and does not consider additional ISO-NE requirements. 6.3 Communications Channels and SCADA The EDC may require communications channels between the EDC and the Generating Facility. If so required, the Generator shall be responsible for procuring such communications channels and forPage 25 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 25 of 34 providing protection from transients and over-voltages at both ends of such communication channels. The Generator shall be responsible for all costs and expenses incurred in connection with such communication channels. 6.3.1 SCADA Requirements 6.3.1.1 In order to facilitate safe, efficient and reliable operation of the EPS, any Generating Facility with a size of 500 kW or greater shall have telemetry equipment compatible with the EDC’s SCADA. The Generator shall be responsible for all costs and expenses incurred in connection with this telemetry equipment. The quantities to be telemetered are: (i) Phase Voltage; (ii) Line Current; (iii) Real Power (kW); (iv) Reactive power (kVAR); (v) and breaker disconnect status (open/closed) both at the generator and at the Point of Interconnection. The EDC may require the Generating Facility to have additional equipment, such as protective devices, supervisory control and alarms, and a dedicated communication channel(s). The EDC shall advise the applicant of its communications requirements after a preliminary review of the Generator’s Interconnection Request. 6.3.1.2 Monitoring, control, and information exchange requirements can be found at the EDC web pages. 6.3.1.3 For Eversource please refer to the DER Information and Technical Requirements. 6.3.1.4 For UI, further requirement details will be provided upon request. 7 Testing and Maintenance Requirements All testing must be completed in accordance with the latest approved version(s) of IEEE 1547 section 5.0 and IEEE 1547.1. 7.1 Witnessing of Commissioning Test 7.1.1 The EDC shall have the right to witness the commissioning testing (pre-parallel testing) as defined in the IEEE 1547.1. The Generator shall notify the EDC ten (10) Business Days in advance of the testing so that the EDC may, at its option, have EDC personnel observe the testing, or inspect the installation. Prior to notifying the EDC of the testing, the Generator shall provide a copy of the testPage 26 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 26 of 34 procedure, the as-built one-line and three-line metering and relaying diagram(s), and applicable relay control diagrams for EDC approval. An individual qualified and experienced in testing protective equipment must perform commissioning testing in accordance with the manufacturer’s recommended test procedure to prove the settings and requirements of these Technical Requirements. At the completion of the test, the Generator shall provide the EDC with a copy of the test report data. All witness testing will be conducted at the expense of the interconnecting generator. Testing typically includes, but is not limited to: a. CT and CT circuit polarity, ratio, insulation, excitation, continuity and burden tests. b. VT and VT circuit polarity, ratio, insulation and continuity tests. c. Relay pick-up and time delay tests. d. Functional breaker trip tests from protective relays. e. Relay in-service test to check for proper phase rotation and magnitudes of applied currents and voltages. 7.1.2 f. Breaker closing interlocks tests. g. Paralleling and disconnection operation. h. Anti-islanding function, if applicable. i. Non-export function, if applicable. j. Synchronizing Controls, if applicable. k. Proof of inability to energize deenergized lines. Prior to final approval by the EDC or anytime thereafter, the EDC reserves the right to test the Generator relaying and control equipment related to the protection of the EDC’s system. 7.1.3 The EDC reserves the right to install at a mutually agreed upon location, special test equipment as may be required to monitor the operation and control of the Generating Facility or for evaluating the quality of power produced by the Generating Facility. 7.1.4 Each commissioning test shall include both a calibration check and an actual trip of the circuit breaker or contactor from the device being tested. Visually setting a calibration dial, index or tap is not considered an adequate calibration 7.2 Periodic Testing 7.2.1 The Generator is responsible for the periodic maintenance of all relays, interrupting devices, control schemes, and batteries that involve the protection of the EPS. Batteries shall be load testedPage 27 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 27 of 34 once every twenty-four (24) months, or more frequently based on the manufacturer’s recommendations. The test cycle for protective relaying must not be less frequent than once every sixty (60) calendar months or the cycle recommended by the manufacturer, whichever is shorter. The Generator must provide copies of these test records to the EDC. The EDC shall have the right to monitor the periodic maintenance performed. 7.2.2 Each routine check shall include both a calibration check and an actual trip of the circuit breaker or contactor from the device being tested. Visually setting a calibration dial, index or tap is not considered an adequate calibration. 7.3 Safe Operations and Maintenance 7.3.1 The Generator shall operate, maintain, repair, and inspect, and shall be fully responsible for the Generating Facility and any other associated facilities that it now or hereafter may own unless otherwise specified in the Interconnection Agreement. The Generator and the EDC shall each be responsible for the maintenance, repair and condition of its respective lines and appurtenances on its respective side of the Point of Interconnection. The EDC and the Generator shall each provide equipment on its respective side of the Point of Interconnection that adequately protects the EPS, personnel, and other persons from damage and injury. 7.3.2 All maintenance shall be performed as specified in the Interconnection Agreement as executed by the parties. 8 Standards and Applicable Guidelines (IEEE, UL, ANSI, etc.) 8.1 Pre-certified Facilities Generating Facilities using qualified (certified to UL 1741/1741 SA including IEEE C62.41) inverterbased facilities with power ratings of 25 kW or less requesting an Interconnection on radial systems where the aggregate Generating Facility capacity on the circuit is less than 5% of circuit annual peak load, qualify for Interconnection under “Guidelines for the Interconnection of Residential Single Phase Certified Inverter -Based Generating Facilities 25 kW (ac) and Less”. 8.2 Non Pre-certified Facilities If inverter-based Facilities with power ratings of 25 kW or less are not using qualified inverters, the application shall be reviewed following “Guidelines for Generator Interconnection-Fast Track and Study Process”.Page 28 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 28 of 34 8.3 Certification of Generator Equipment Packages Some Generator equipment packages have been certified. This facilitates the Interconnection since properly certified equipment need not be reviewed by the EDC in as much detail as non-certified equipment. This results in a faster, less costly review process for the Generator. For more information on certification of generator equipment packages see Attachment IX Certification of Small Generator Equipment Packages in the Guidelines for Generator Interconnection Fast Track and Study Processes 8.4 Codes and Standards All the existing codes and standards (in addition to any successor codes and standards) listed in Attachment X - Codes and Standards section of the Guidelines for Generator Interconnection Fast Track and Study Processes shall be applied as appropriate.Page 29 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 29 of 34 Appendix A Distributed Generation Paralleling with an Electric Power System Protective Relaying Setting Guidelines1,2,3,4 Protective Typical Settings Element Comment Always Required Protection5 Primary Function: Anti-Islanding Refer to UV1 and UV2 settings in 27 ISO-NE Document “Default IEEE Under-voltage 1547-2018 Setting Requirements” This element operates when its input voltage is less than a predetermined value. Note: Voltage sensing on all three phases shall be used for maximum sensitivity for phase disturbances. Refer to OV1 and OV2 settings in 59 ISO-NE Document “Default IEEE Over-voltage 1547-2018 Setting Requirements” Refer to OF1 and OF2 settings in 81o ISO-NE Document “Default IEEE Over-frequency 1547-2018 Setting Primary Function: Anti-Islanding This element operates when its input voltage exceeds a predetermined value. Note: Voltage sensing on all three phases shall be used for maximum sensitivity for phase disturbances. Primary Function: Anti-Islanding This element responds to the frequency of the system voltage and operates when the frequency exceeds a predetermined value. Requirements” 81u Underfrequency (Per IEEE 1547) Primary Function: Anti-Islanding Refer to UF1 and UF2 settings in This element responds to the frequency of the system voltage and operates ISO-NE Document “Default IEEE when the frequency is less than a predetermined value. 1547-2018 Setting Requirements” Refer to Section 4.10 for guidance on underfrequency tripping.Page 30 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 30 of 34 (Per NPCC A-03) Primary Function: Anti-Islanding 81U-1: This element responds to the frequency of the system voltage and operates 58.0Hz trip in 32.0sec 81U-2: 57.5Hz trip in 11.0sec when the frequency is less than a predetermined value. Refer to Section 4.10 for guidance on underfrequency tripping. Set per NPCC A-03, 8-31-2004, Figure 1. 81U-3: 57.0Hz trip in 0.16sec Additional Protection Requirements6 Primary Function: Permissive Close This element supervises the operation of the generator automatic or manual synchronizing system by ensuring proper voltage, phase angle matching, and where appropriate, slip frequency between the EPS and Generator before the 25 set per Customer study7 Synch-Check breaker is allowed to close. It is important that the appropriate Live/Dead, Line and Bus options be selected to permit breaker closing under other conditions. For example, if the generator is OFF-LINE and the customer bus is Dead then the 25 relay should permit a Live EPS to Dead Bus close of the EPS/Generator interconnection breaker to restore power to the load. Primary Function: Export Blocking This element is used on systems designed as import only systems to ensure no 32R (rev): set to min. possible level (1-10% MAX watts of smallest Genset) (trip in minimum time 5-10 sec 32 MAX) power is exported onto the EPS. When the system is designed to not export power the DG controls are usually set to a "minimum import level" (say 100kW). The difference between this minimum import level and the reverse power setting is the margin before a trip will occur. This relay is set relatively slow to allow the generator import/export controls to respond to sudden load changes which may momentarily cause an export condition. A properly Directional functioning import/export control system will rapidly reduce the generator Power output back to the target "minimum import level". Primary Function: Anti-Islanding 32U (under): set to target import level (trip in minimum time 5-10 sec MAX) This element performs a similar function to the 32R element except it ensures the generating facility is always importing some preset level of power. If the import level drops below the "underpower" threshold then the element will operate to trip. This element should be used in cases where a reliable 32R (export trip) cannot be guaranteed.
Text of ICC-001 Attachment 4.pdf
Extracted from the file · 34 pages · 72,650 characters
Text of ICC-001 Attachment 5.pdf
Extracted from the file · 67 pages · 136,480 characters
Text of ICC-002_Final.pdf
Extracted from the file · 2 pages · 2,788 characters
Text of ICC-002 Attachment 1.pdf
Extracted from the file · 29 pages · 46,015 characters
Text of ICC-002 Attachment 2.pdf
Extracted from the file · 74 pages · 148,550 characters
Text of ICC-002 Attachment 3.pdf
Extracted from the file · 27 pages · 91,051 characters
Text of ICC-004_Final.pdf
Extracted from the file · 1 page · 983 characters
Text of ICC-010_Final.pdf
Extracted from the file · 4 pages · 11,507 characters
Text of ICC-018_Final.pdf
Extracted from the file · 2 pages · 2,628 characters
As listed on the current system
Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026