Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

  1. Page 25 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 25 of 34 providing protection from transients and over-voltages at both ends of such communication channels. The Generator shall be responsible for all costs and expenses incurred in connection with such communication channels. 6.3.1 SCADA Requirements 6.3.1.1 In order to facilitate safe, efficient and reliable operation of the EPS, any Generating Facility with a size of 500 kW or greater shall have telemetry equipment compatible with the EDC’s SCADA. The Generator shall be responsible for all costs and expenses incurred in connection with this telemetry equipment. The quantities to be telemetered are: (i) Phase Voltage; (ii) Line Current; (iii) Real Power (kW); (iv) Reactive power (kVAR); (v) and breaker disconnect status (open/closed) both at the generator and at the Point of Interconnection. The EDC may require the Generating Facility to have additional equipment, such as protective devices, supervisory control and alarms, and a dedicated communication channel(s). The EDC shall advise the applicant of its communications requirements after a preliminary review of the Generator’s Interconnection Request. 6.3.1.2 Monitoring, control, and information exchange requirements can be found at the EDC web pages. 6.3.1.3 For Eversource please refer to the DER Information and Technical Requirements. 6.3.1.4 For UI, further requirement details will be provided upon request. 7 Testing and Maintenance Requirements All testing must be completed in accordance with the latest approved version(s) of IEEE 1547 section 5.0 and IEEE 1547.1. 7.1 Witnessing of Commissioning Test 7.1.1 The EDC shall have the right to witness the commissioning testing (pre-parallel testing) as defined in the IEEE 1547.1. The Generator shall notify the EDC ten (10) Business Days in advance of the testing so that the EDC may, at its option, have EDC personnel observe the testing, or inspect the installation. Prior to notifying the EDC of the testing, the Generator shall provide a copy of the test
  2. Page 26 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 26 of 34 procedure, the as-built one-line and three-line metering and relaying diagram(s), and applicable relay control diagrams for EDC approval. An individual qualified and experienced in testing protective equipment must perform commissioning testing in accordance with the manufacturer’s recommended test procedure to prove the settings and requirements of these Technical Requirements. At the completion of the test, the Generator shall provide the EDC with a copy of the test report data. All witness testing will be conducted at the expense of the interconnecting generator. Testing typically includes, but is not limited to: a. CT and CT circuit polarity, ratio, insulation, excitation, continuity and burden tests. b. VT and VT circuit polarity, ratio, insulation and continuity tests. c. Relay pick-up and time delay tests. d. Functional breaker trip tests from protective relays. e. Relay in-service test to check for proper phase rotation and magnitudes of applied currents and voltages. 7.1.2 f. Breaker closing interlocks tests. g. Paralleling and disconnection operation. h. Anti-islanding function, if applicable. i. Non-export function, if applicable. j. Synchronizing Controls, if applicable. k. Proof of inability to energize deenergized lines. Prior to final approval by the EDC or anytime thereafter, the EDC reserves the right to test the Generator relaying and control equipment related to the protection of the EDC’s system. 7.1.3 The EDC reserves the right to install at a mutually agreed upon location, special test equipment as may be required to monitor the operation and control of the Generating Facility or for evaluating the quality of power produced by the Generating Facility. 7.1.4 Each commissioning test shall include both a calibration check and an actual trip of the circuit breaker or contactor from the device being tested. Visually setting a calibration dial, index or tap is not considered an adequate calibration 7.2 Periodic Testing 7.2.1 The Generator is responsible for the periodic maintenance of all relays, interrupting devices, control schemes, and batteries that involve the protection of the EPS. Batteries shall be load tested
  3. Page 27 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 27 of 34 once every twenty-four (24) months, or more frequently based on the manufacturer’s recommendations. The test cycle for protective relaying must not be less frequent than once every sixty (60) calendar months or the cycle recommended by the manufacturer, whichever is shorter. The Generator must provide copies of these test records to the EDC. The EDC shall have the right to monitor the periodic maintenance performed. 7.2.2 Each routine check shall include both a calibration check and an actual trip of the circuit breaker or contactor from the device being tested. Visually setting a calibration dial, index or tap is not considered an adequate calibration. 7.3 Safe Operations and Maintenance 7.3.1 The Generator shall operate, maintain, repair, and inspect, and shall be fully responsible for the Generating Facility and any other associated facilities that it now or hereafter may own unless otherwise specified in the Interconnection Agreement. The Generator and the EDC shall each be responsible for the maintenance, repair and condition of its respective lines and appurtenances on its respective side of the Point of Interconnection. The EDC and the Generator shall each provide equipment on its respective side of the Point of Interconnection that adequately protects the EPS, personnel, and other persons from damage and injury. 7.3.2 All maintenance shall be performed as specified in the Interconnection Agreement as executed by the parties. 8 Standards and Applicable Guidelines (IEEE, UL, ANSI, etc.) 8.1 Pre-certified Facilities Generating Facilities using qualified (certified to UL 1741/1741 SA including IEEE C62.41) inverterbased facilities with power ratings of 25 kW or less requesting an Interconnection on radial systems where the aggregate Generating Facility capacity on the circuit is less than 5% of circuit annual peak load, qualify for Interconnection under “Guidelines for the Interconnection of Residential Single Phase Certified Inverter -Based Generating Facilities 25 kW (ac) and Less”. 8.2 Non Pre-certified Facilities If inverter-based Facilities with power ratings of 25 kW or less are not using qualified inverters, the application shall be reviewed following “Guidelines for Generator Interconnection-Fast Track and Study Process”.
  4. Page 28 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 28 of 34 8.3 Certification of Generator Equipment Packages Some Generator equipment packages have been certified. This facilitates the Interconnection since properly certified equipment need not be reviewed by the EDC in as much detail as non-certified equipment. This results in a faster, less costly review process for the Generator. For more information on certification of generator equipment packages see Attachment IX Certification of Small Generator Equipment Packages in the Guidelines for Generator Interconnection Fast Track and Study Processes 8.4 Codes and Standards All the existing codes and standards (in addition to any successor codes and standards) listed in Attachment X - Codes and Standards section of the Guidelines for Generator Interconnection Fast Track and Study Processes shall be applied as appropriate.
  5. Page 29 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 29 of 34 Appendix A Distributed Generation Paralleling with an Electric Power System Protective Relaying Setting Guidelines1,2,3,4 Protective Typical Settings Element Comment Always Required Protection5 Primary Function: Anti-Islanding Refer to UV1 and UV2 settings in 27 ISO-NE Document “Default IEEE Under-voltage 1547-2018 Setting Requirements” This element operates when its input voltage is less than a predetermined value. Note: Voltage sensing on all three phases shall be used for maximum sensitivity for phase disturbances. Refer to OV1 and OV2 settings in 59 ISO-NE Document “Default IEEE Over-voltage 1547-2018 Setting Requirements” Refer to OF1 and OF2 settings in 81o ISO-NE Document “Default IEEE Over-frequency 1547-2018 Setting Primary Function: Anti-Islanding This element operates when its input voltage exceeds a predetermined value. Note: Voltage sensing on all three phases shall be used for maximum sensitivity for phase disturbances. Primary Function: Anti-Islanding This element responds to the frequency of the system voltage and operates when the frequency exceeds a predetermined value. Requirements” 81u Underfrequency (Per IEEE 1547) Primary Function: Anti-Islanding Refer to UF1 and UF2 settings in This element responds to the frequency of the system voltage and operates ISO-NE Document “Default IEEE when the frequency is less than a predetermined value. 1547-2018 Setting Requirements” Refer to Section 4.10 for guidance on underfrequency tripping.
  6. Page 30 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 30 of 34 (Per NPCC A-03) Primary Function: Anti-Islanding 81U-1: This element responds to the frequency of the system voltage and operates 58.0Hz trip in 32.0sec 81U-2: 57.5Hz trip in 11.0sec when the frequency is less than a predetermined value. Refer to Section 4.10 for guidance on underfrequency tripping. Set per NPCC A-03, 8-31-2004, Figure 1. 81U-3: 57.0Hz trip in 0.16sec Additional Protection Requirements6 Primary Function: Permissive Close This element supervises the operation of the generator automatic or manual synchronizing system by ensuring proper voltage, phase angle matching, and where appropriate, slip frequency between the EPS and Generator before the 25 set per Customer study7 Synch-Check breaker is allowed to close. It is important that the appropriate Live/Dead, Line and Bus options be selected to permit breaker closing under other conditions. For example, if the generator is OFF-LINE and the customer bus is Dead then the 25 relay should permit a Live EPS to Dead Bus close of the EPS/Generator interconnection breaker to restore power to the load. Primary Function: Export Blocking This element is used on systems designed as import only systems to ensure no 32R (rev): set to min. possible level (1-10% MAX watts of smallest Genset) (trip in minimum time 5-10 sec 32 MAX) power is exported onto the EPS. When the system is designed to not export power the DG controls are usually set to a "minimum import level" (say 100kW). The difference between this minimum import level and the reverse power setting is the margin before a trip will occur. This relay is set relatively slow to allow the generator import/export controls to respond to sudden load changes which may momentarily cause an export condition. A properly Directional functioning import/export control system will rapidly reduce the generator Power output back to the target "minimum import level". Primary Function: Anti-Islanding 32U (under): set to target import level (trip in minimum time 5-10 sec MAX) This element performs a similar function to the 32R element except it ensures the generating facility is always importing some preset level of power. If the import level drops below the "underpower" threshold then the element will operate to trip. This element should be used in cases where a reliable 32R (export trip) cannot be guaranteed.
  7. Page 31 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 31 of 34 For example, if an upstream EPS recloser opens and the Generating Facility backfeeds or islands a small pocket of distribution load there may be insufficient reverse power to ensure a reliable 32R trip. On the other hand if the 32U element is applied to this same case, the Generating Facility would trip after the EPS source is lost since the import power will drop to a zero or negative value which is below the 32U trip threshold. Note: These Import Only systems typically have less complex interconnections since they have limited adverse effects on EPS system voltages and are less likely to have the ability to sustain an EPS island. Primary Function: Unbalance Detection 46 Negative This element serves to protect both the EPS and generator system from system set per Customer study7 Sequence from high negative sequence currents. This setting is typically based on Current generator capabilities and may be reviewed by the EDC. Primary Function: Fault Detection 51 Over-current set per Customer study7 This element provides phase overcurrent protection and operates with an inverse time-current characteristic when its input current exceeds a (Phase) predetermined value. Primary Function: Fault Detection 51N Over-current unbalances including single phasing. Generators may become damaged quickly set per Customer study7 This element provides ground overcurrent protection and operates with an inverse time-current characteristic when its input current exceeds a (Ground) predetermined value. Primary Function: Fault Detection 51V Over-current This element provides backup phase overcurrent protection for system faults set per Customer study7 under collapsed voltage condition. Many DG units cannot sustain fault current (Voltage Control especially above 300% FLA. This element would allow setting the pickup below or Restrained) load current when voltage is depressed. Typically the pickup level is set to 50% of load current when the voltage is reduced below 80% of nominal. Primary Function: Anti-Islanding This element is intended to detect ground faults in the event that a ground 59G Over-voltage (Ground) source is lost such as the case of a DG with a Delta winding on the EPS side. This set per Customer study7 type of transformer connection can result in the classic 173% overvoltage on the unfaulted phases after the EDC station breaker is open. Even if this relay is set very fast there is still a risk of distribution system equipment damage (Reference ITIC Curve in IEEE 1547.2/DRAFT 7, Figure D.5).
  8. Page 32 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 32 of 34 Primary Function: Fault Detection 67 May be required depending on feeder configuration. Directional - set per Customer study7 Phase This element provides directional phase overcurrent protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value in a specified direction. Primary Function: Fault Detection 67N May be required depending on feeder configuration. Directional - set per Customer study7 Phase This element provides directional ground overcurrent protection and operates with an inverse time-current characteristic when its input current exceeds a predetermined value in a specified direction. Primary Function: Manual Reset Lockout Relay All relay trip elements must operate a manual reset lockout relay which in turn 86 None trips isolating circuit breakers preventing reclosing by any means. In some cases utility approval may be obtained to allow certain relay elements to directly trip a breaker, bypassing the lockout relay for special automatic schemes. NOTES: 1) General: This reference is considered a "guide". Engineering judgement must be applied when evaluating each application. 2) Intent: These are considered necessary requirements to protect the EPS from the Generating Facility. The Generator is responsible for considering additional protection for its internal system. 3) Parallel Operation: These guidelines apply to Generating Facilities operating in parallel with the EPS 100msec or more. The requirements are reduced for applications where paralleling times are less than 100msec. 4) Equipment Requirements: Relays shall meet all applicable requirements of Section 4. 5) Always Required Protection: All generators must provide these protective relay elements. 6) Additional Protection Requirements: Certain Generating Facilities may be required to provide these additional requirements as will be determined by the utility interconnection study or as described in Section 4.
  9. Page 33 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 33 of 34 7) Set per Customer Study: The settings for these elements shall be submitted by the Generator to the EDC for review. At the Generator's request the EDC will provide system protection information directly related to the Point of Interconnection.
  10. Page 34 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 3 Page 34 of 34 Appendix B

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

Text of ICC-001 Attachment 5.pdf

Extracted from the file · 67 pages · 136,480 characters

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)