Interrogatory responses
Answers to questions 1, 2, 4, 10, 18, 20
Files13
ICC-001_Final.pdf
PDF · 114 KB · 1 pageText searchable
Download ICC-001_Final.pdfRead the text of ICC-001_Final.pdf
ICC-001 Attachment 1.pdf
PDF · 3.4 MB · 28 pagesText searchable
Download ICC-001 Attachment 1.pdfRead the text of ICC-001 Attachment 1.pdf
ICC 001 Attachment 2.pdf
PDF · 4.0 MB · 68 pagesText searchable
Download ICC 001 Attachment 2.pdfRead the text of ICC 001 Attachment 2.pdf
ICC-001 Attachment 3.pdf
PDF · 1.1 MB · 34 pagesText searchable
Download ICC-001 Attachment 3.pdfRead the text of ICC-001 Attachment 3.pdf
ICC-001 Attachment 4.pdf
PDF · 1.3 MB · 34 pagesText searchable
Download ICC-001 Attachment 4.pdfRead the text of ICC-001 Attachment 4.pdf
ICC-001 Attachment 5.pdf
PDF · 3.5 MB · 67 pagesText searchable
Download ICC-001 Attachment 5.pdfRead the text of ICC-001 Attachment 5.pdf
ICC-002_Final.pdf
PDF · 143 KB · 2 pagesText searchable
Download ICC-002_Final.pdfRead the text of ICC-002_Final.pdf
ICC-002 Attachment 1.pdf
PDF · 1.1 MB · 29 pagesText searchable
Download ICC-002 Attachment 1.pdfRead the text of ICC-002 Attachment 1.pdf
ICC-002 Attachment 2.pdf
PDF · 1.5 MB · 74 pagesText searchable
Download ICC-002 Attachment 2.pdfRead the text of ICC-002 Attachment 2.pdf
ICC-002 Attachment 3.pdf
PDF · 2.5 MB · 27 pagesText searchable
Download ICC-002 Attachment 3.pdfRead the text of ICC-002 Attachment 3.pdf
ICC-004_Final.pdf
PDF · 127 KB · 1 pageText searchable
Download ICC-004_Final.pdfRead the text of ICC-004_Final.pdf
ICC-010_Final.pdf
PDF · 168 KB · 4 pagesText searchable
Download ICC-010_Final.pdfRead the text of ICC-010_Final.pdf
ICC-018_Final.pdf
PDF · 135 KB · 2 pagesText searchable
Download ICC-018_Final.pdfRead the text of ICC-018_Final.pdf
Text of ICC-001 Attachment 3.pdf
Extracted from the file · 34 pages · 76,972 characters
Page 11 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 11 of 34 3 General Design Requirements 3.1 Interconnection Transformer Winding and Grounding Considerations In order to provide maximum operating flexibility for the DER and to minimize possible adverse effects on the facilities of other Eversource customers, the DER shall provide, at its sole cost and expense, an interconnection transformer between the DER facility and the Company-owned equipment, unless this requirement is waived by the Company in its sole discretion. When required, the DER owner shall propose to the Company an interconnection transformer and grounding configuration (if required), which shall be subject to the approval of the Company at its sole discretion. The final winding connection and grounding configuration is subject to the approval of the Company at its sole discretion. See also Section 2.8 (Grounding and Bonding) and Section 3.4 (GSU Transformer Configurations). 3.2 Power Quality Requirements All DER facilities shall comply with the power quality requirements in the latest version of IEEE 1547. The DER shall not cause voltage step or ramp change at the POI exceeding 3% at medium distribution voltages per IEEE 1547-2018 clause 7.2.2. Eversource also requires that the maximum Rapid Voltage Change (RVC) shall not exceed the values listed below, unless the Company establishes alternate limits in special situations that include, but are not limited to, tap changer and capacitor operation, and the type and number of customers on the circuit. Simultaneous output changes on other DER sites on the circuit may be considered for the analysis if they are the same type, since a common event could affect more than one site. If the circuit occupies a large geographic area, the Company may determine volatility of DER output. Harmonic current injection into the EPS at the Point of Common Coupling (“PCC”) shall be consistent with limits established by IEEE 519 and IEEE 1547. The interconnection of the DER facility shall not increase the potential for Ferroresonance in the EPS. The interconnection of the DER facility shall not cause temporary under voltages or over-voltages as determined by the Company when studying the proposed interconnection. 3.3 Voltage Regulation and Power Factor The DER facility shall not: (i) actively regulate the voltage of the EPS unless specifically agreed by the Company; (ii) cause the voltage at any point along the EPS to deviate from the voltage range defined in the regulatory requirements for each State. of nominal or (iii) cause any voltage - 10 -Page 12 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 12 of 34 deviations, which are objectionable to other customers of the Company as determined by the Company when studying the proposed interconnection. A DER owner may be required to install equipment that can be set to operate at a power factor between 0.90 lagging (Vars to the Company EPS) and 0.90 leading (Vars from the Company EPS). All DERs greater than 1 MW connecting to the Eversource distribution system are required to have capability to operate in Volt-Var control mode per the latest version of IEEE 1547. The Company regulates the voltage on the EPS by employing load tap changing transformers, line voltage regulators and/or capacitors. Upgrades to these facilities may require system modifications resulting from DER interconnection. 3.4 Transformer Reverse Power Capability Any proposed DER facility that has the potential to cause reverse power flow through an Eversource substation transformer may require an Impact Study. The Impact Study will specifically address the ability of the transformer to accommodate reverse power flow. The following items will be evaluated: System Voltage Control: The Impact Study shall determine if system voltage control can be maintained at various boundary conditions and will evaluate excessive load tap changer (“LTC”) operation caused by intermittent DER sources. LTC Design, Controller Type and Controller Settings: The Impact Study will evaluate the capability of LTC and controller to accommodate reverse power conditions and to respond with appropriate control strategies. Voltage and current inputs must be available to the LTC controller. Any LTC controller that is not appropriate for reverse power must be replaced with a suitable controller with both voltage and current inputs. The requirement to add a backup controller will also be evaluated. LTC upgrades may require system modifications resulting from a DER facility interconnection. Controller settings will be determined on case-by-case analysis of DER type and penetration. Capacity Limit: Unless constrained by other more limiting requirements, aggregate DER (in kVA) will be permitted up to 95% of the transformer’s top nameplate ampere rating (in kVA) with maximum cooling operational. The minimum forward loading of the transformer shall be considered for the assessment. Reverse power flow that will significantly add to the transformer insulation loss of life on a routine basis, based on the transformer specification and the insulation aging description in the - 11 -Page 13 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 13 of 34 latest version of IEEE Std. C57.91, will be evaluated. Any required transformer upgrades will be included in the system modifications section of the impact study that are required before interconnecting the DER facility. DER facilities must supply a balanced three-phase output such that there would never be a situation where a substation transformer could experience forward power flow on one or more phases while experiencing reverse power flow on the other phase(s). As a part of the Impact Study process, projects will be reviewed on a case-by-case basis to determine if additional relays or other protection devices will be required. Any required protection devices will be included in system modifications required to interconnect the DER facility. 3.5 Dispatch Limiting Schedule The DER Dispatch Limiting Schedule is calculated during technical review and provides maximum operating capabilities for both charging and discharging activity of the DER based on type. The following provides the format for schedule that DERs > 500 kW are required to follow. Charge Limiting Schedule (CLS) and Discharge Limiting Schedule (DLS) refer to importing from and exporting to the grid in all cases respectively. Discharge Limiting Schedule (DLS) 07:00 - 12:00 12:00 - 15:00 15:00 - 19:00 19:00 - 07:00 Spring % % % % Summer % % % % Fall % % % % Winter % % % % Charge Limiting Schedule (CLS) 06:00 - 11:00 11:00 - 15:00 15:00 - 22:00 22:00 - 06:00 Spring % % % % Summer % % % % Fall % % % % Winter % % % % - 12 -Page 14 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 14 of 34 The Seasons are defined as follows: • Spring: March, April, May • Summer: June, July, Aug • Fall: Sept, Oct • Winter: Nov, Dec, Jan, Feb 3.6 Insulation Coordination The DER facility connected to the EPS (even in closed transition mode) must be able to withstand the normal steady state and abnormal transient voltages that can be experienced on the EPS. Lightning and switching of equipment are two common sources of high abnormal voltage transients. The DER shall be responsible for procuring equipment with a level of insulation and fault withstand capability compatible with the grounding method specified below. 3.7 BIL (Basic Impulse Insulation Level) Equipment connected to the EPS must be designed with a certain minimum Basic Impulse Insulation Level (“BIL”). BIL, in general terms, is a measure of the ability of a piece of equipment to withstand normal and abnormal voltages. The DER shall ensure that the BIL of all the installed equipment meets the applicable standards set forth above, as well as applicable UL, ANSI and IEEE standards. Furthermore, such equipment shall be installed in compliance with all applicable local, state and federal codes. 3.8 Arc Flash The interconnection of a DER facility to the EPS shall not increase available fault current and associated arc flash energy to a level where Company workers would have to use the next level of enhanced Personal Protective Equipment (“PPE”) and/or restrictive work methods above and beyond what the workers would normally use for work at the same location without the DER facility present. System modifications to address unacceptable increase in arc flash energy levels will be addressed in the Impact Study on a case-by-case basis. 3.9 DER Facility Capacity The DER facility size is determined by the total aggregate maximum AC output of all DERs as specified on the individual DER equipment specifications (“cut sheet”) and the export/import limitations clearly defined on the one-line. - 13 -Page 15 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 15 of 34 3.10 Design Changes or Additions Contact the Company prior to designing any changes to existing interconnected DER facilities. Express authorization by the Company is required for the interconnection of any DER. Once a design is approved for interconnection, no changes may be made without a subsequent approval by the Company of those changes. Failure to notify the Company of changes to approved designs may result in disconnection of the DER. The document describing steps to make the design changes and their impact can be found on Eversource website (https://www.eversource.com/content/docs/default-source/builders-contractors/inverterdesign-changes-table.pdf?sfvrsn=496ad09f_3) 3.11 Utility Accessible Disconnect Switch The Company shall require a utility accessible disconnect switch (UADS), or comparable device agreed to by Company, at the PCC or at another mutually agreeable point that is accessible to Company personnel at all hours of every day and that can be opened for isolation if required. The Company shall have access to the DER isolation device. Any DER-owned isolating device should be located within ten feet and visible sight of the revenue meter or at another mutually agreeable point that is accessible to Eversource personnel at all hours of all days. The device must have proper placards and signage indicating that it is for the DER facility. Signage must be of a permanent nature. Use UV stable materials and adhesive, suitable for outdoor environmental life cycle. The Company shall have the right to open this UADS in accordance with any Interconnection Tariff or agreements as applicable. An externally accessible UADS is required for all DERs unless waived due to State requirements or extenuating circumstances, as determined on a case-by-case basis. The Company requirements and specifications for an UADS are as follows. A UADS shall: • • • • • Be gang operated Have a visible break when open Be rated to interrupt the maximum DER facility output Be capable of being locked open Be easily accessible to Company personnel at all times In NH, the state requirement is set by PUC 905.01, which does not allow the utility to require a UADS for generators less than 10 kW, unless specific conditions are not met by the interconnecting DER. In CT, certified inverter generators less than or equal to 1 kW are exempt from the UADS requirement. - 14 -Page 16 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 16 of 34 3.12 Adverse Impact of Unintentional Islanding Unintentional Islanding by the DER of all or part of the EPS (meaning a part of the EPS is kept energized by the generating facility after the area has been de-energized) is prohibited as it may result in unsafe conditions on the EPS. Eversource performs risk of islanding (ROI) screening during initial review based on the SANDIA suggested Guidelines for anti-Islanding screening. An EMT ROI study is required to further assess the ROI when a project fails the applicable screens. To pass an ROI study, generator must trip within two (2) seconds of a loss of source event to meet the IEEE 1547-2018 Section 8.1 requirements. If a violation is detected after the dynamic study completion, mitigations such as DTT will be required. 3.13 Transient Overvoltage (TOV) Transient overvoltage is of concern due to potential load rejection overvoltage (LROV) by inverter-based DER. There is concern that during step changes in load (such as tripping of an upstream device), the proposed inverters may cause transient over voltages in excess of 1.2pu, which can potentially cause damage to the customer’s equipment, utility equipment, and/or nearby customer equipment. Due to this concern, Eversource requires that the customer demonstrate that the inverters limit their cumulative overvoltage according to the transient overvoltage curve in IEEE Std. 1547-2018 clause 7.4.2. If the EMT study is required and analysis determines that a TOV condition is caused by the DER, mitigation or combination of mitigations, such as, but not limited to, Self-Protection Overvoltage (SPOV) enabling in the inverter, revising grounding system, and Surge Arrestors at POI or substation, may be required. The analysis shall also screen for pre-existing transient overvoltage issues. NOTE: Please note that compliance with IEEE Std. 1547-2018 cannot guarantee that the transient analysis is not required. 3.14 Fault Interrupting Devices The DER owner shall install an interrupting device that has the capability to safely isolate the DER from the Company’s EPS. This device shall be capable of interrupting the full nameplate fault current of the DER system with consideration of X/R ratio including all AC and DC offsets at that point in the system. Such device may be subject to approval by the Company, but such approval will be limited to the suitability of protecting the Company’s EPS. 3.15 Service Requirements All DER interconnections must be consistent with each State’s applicable Information and Requirements for Electric Supply. These documents are available at www.eversource.com. - 15 -Page 17 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 17 of 34 3.16 Clearances If installing solar panels on the roof of a building, then the DER solar Facility must maintain a minimum of three feet from the service point of attachment and service must. 3.17 Rights of Way (ROW) 3.17.1 Distribution and Transmission ROW’s Customers are not permitted to install equipment in Distribution or Transmission Rights of Way (ROW). Please contact Eversource prior to designing a project near a ROW. Please note that if your project requires you to access a ROW (such as by vehicle), you will be required to pay for a study to determine proper access to the site and modifications required for safe access and clearances. Services and equipment cannot be interconnected in or across a ROW. 3.17.2 Wind Turbine Setback from Distribution and Transmission ROW’s Each wind turbine proposed to be located near any Eversource Distribution or Transmission Right of Way (ROW) shall have a setback distance from the edge of the ROW that is the greater of the following: (1) a minimum of 1.5 times the wind turbine’s maximum tip height (MTH)*; or (2) the minimum distance recommended by the applicable Ice Drop and Throw Evaluation Report during turbine operation; or (3) the minimum distance recommended by the wind turbine manufacturer for a turbine located in proximity to Eversource infrastructure on an ROW. *Maximum Tip Height (MTH) is defined as the height of the wind turbine measured from natural grade to the tip of the rotor blade at its highest point. 3.18 Communication Protocol The new IEEE 1547-2018 standard specifies that “a DER shall have provisions for a local DER interface capable of communicating to support the information exchange requirements specified in this standard for all applicable functions that are supported in the DER”. The standard requires communications such that the utility can send control commands and receive status and information back from the smart inverters. In section 10.1, IEEE 1547-2018 also specifically says that “the decision to use the local DER communication interface or to deploy a communication system shall be determined by the Area EPS operator”. Eversource Energy, as the area electrical power system (EPS) operator, can specify which communication protocols to use from the list of the eligible protocols as specified in Table 41 of IEEE 1547-2018 or whether to require the use of DER communications interface. - 16 -Page 18 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 18 of 34 Table 41 —List of eligible protocols 1. IEEE Std 2030.5 (SEP2) TCP/IP Ethernet 2. IEEE Std 1815 (DNP3) TCP/IP Ethernet 3. SunSpec Modbus TCP/IP Ethernet 3.19 Communication Medium Evaluation Eversource will evaluate the system requirements to select the most reliable communication path for the interface with customer owned RTAC. The Eversource system has existing communication paths for the distribution system that will vary depending on location. The communication medium will be selected based on the existing infrastructure and the goal will be to integrate the new devices into the existing network and only interconnect the new devices into the network. The communication medium to be used is listed below and will take priority in the order listed. 1. Fiber The use of optic fiber is highly recommended in those cases where there is a previous installation and fiber is already available. While the cost of fiber installation and maintenance is high in comparison to Cellular or Radio, the design team will evaluate the application requirements and use fiber optic only if it is strictly required. 2. Radio This method is one of the Eversource preferred methods since it is being currently used for the Distribution SCADA communication and has been a reliable solution and provides the advantage of having the infrastructure available and installed. 3. Cellular Cellular communication is being installed in implementation of DTT schemes and has offers a redundant communication path and reliable operation. The use of Cellular technology will be evaluated by Network Engineering, DSCADA and P&C teams to be used as the primary communication medium in DTT implementations. Once a communication mean has been determined, the Customer will be responsible for all construction back to the point of interconnect. DNP3 is the Eversource Energy’s specified communication protocol. Eversource Energy as the area EPS operator has established the following DER communications interface requirements: 1. Small to mid-size behind the meter residential and commercial systems with nameplate capacity of less than or equal to 500 kW have no specific requirements for DER communications interface currently. 2. Large DER systems with nameplate capacity greater than or equal to 500 kW are required to have and provide evidence of a DNP3 communications interface. - 17 -Page 19 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 19 of 34 3. Emergency and standby DER systems are exempt as specified in 4.13 of IEEE 1547-2018 from the interoperability requirements specified in this standard. 4 Protection and Control Requirements 4.1 Classifications of Interconnections 4.1.1 Purely Exporting A Purely Exporting Generator (figure 1) or stand-alone DER within the context of these requirements shall mean any DER that is installed with the purpose of providing power onto the Company EPS and has little or no on-site customer load. The PCC will be defined in an Agreement between the DER owner and the Company. Under the context of this type of interconnection, the Company will regard the PCC Utility owned switch as the means to isolate the generator during times when the Company considers it unacceptable for parallel generation to operate. The Company owned disconnecting device may be operated during off normal system configurations or any number of adverse conditions that may be brought to light in an Impact Study. This device may be operated manually, remotely or through the operation of a Company direct transfer trip scheme. When deemed necessary, the DER owner shall install and maintain a protection and control system. The Company disconnecting device shall not be considered as part of the DER’s protection scheme. - 18 -Page 20 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 20 of 34 - 19 -
Text of ICC-001 Attachment 5.pdf
Extracted from the file · 67 pages · 136,480 characters
Text of ICC-002_Final.pdf
Extracted from the file · 2 pages · 2,788 characters
Text of ICC-002 Attachment 1.pdf
Extracted from the file · 29 pages · 46,015 characters
Text of ICC-002 Attachment 2.pdf
Extracted from the file · 74 pages · 148,550 characters
Text of ICC-002 Attachment 3.pdf
Extracted from the file · 27 pages · 91,051 characters
Text of ICC-004_Final.pdf
Extracted from the file · 1 page · 983 characters
Text of ICC-010_Final.pdf
Extracted from the file · 4 pages · 11,507 characters
Text of ICC-018_Final.pdf
Extracted from the file · 2 pages · 2,628 characters
As listed on the current system
Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026