Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

  1. Page 25 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 25 of 34 4.3 Synchronizing Devices The DER owner shall designate one or more synchronizing device(s) such as motorized breakers, contactor/breaker combinations, or a fused contactor (if mutually agreeable) to be used to connect the DER Facility to the EPS. This synchronizing device may be a device other than the interconnection interrupting device. The synchronizing device must be capable of interrupting the current produced when the generating Facility is connected out of phase with the EPS consistent with IEEE 1547-2018 Section 4.11.3. All synchronizing will be done by the generator at the generating Facility. The generating Facility shall not be used to energize a de-energized Company circuit. In-line breakers, contactors, or switches without synchronizing devices require electrical or mechanical interlocks to prevent out-of-phase closing with the EPS. All synchronizing schemes used for interconnecting a generating Facility with the EPS must conform to the synchronizing requirements within the current version of IEEE 1547. Requirements for automatic synchronizing schemes are determined by the Company on a case-by-case basis. Induction generators must be accelerated to “synchronous” speed prior to connection to the EPS to reduce the magnitude and duration of accelerating current and resulting voltage drop to Eversource customers to acceptable levels. Synchronous generators may not use the “pull-in” method of synchronizing due to excessive voltage drops to Eversource customers. 4.4 Utility Grade Relay Equipment All DER-owned and maintained relays installed as part of generator protection scheme (Anti-Islanding, Overcurrent, Reverse Power, etc.) shall be ‘Utility Grade’. All devices utilized to supply Eversource-required protective functions must be equipped with provisions to aid in the post-mortem analysis of their operation. In the case of singlefunction protective elements, these provisions will include properly configured targets. In the case of the multifunction of numerical devices, these provisions will include properly configured event recording facilities as well as targets. Dedicated relays must be reserved for Eversource required functions. These relays will provide no functions except for Eversource required functions. Any “relay failure” contacts on Eversource-required protective devices shall be wired to (1) trip the site generation and (2) initiate an alarm when the contacts indicate relay malfunction. - 24 -
  2. Page 26 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 26 of 34 All Eversource-required protective relays and auxiliary tripping relays must be equipped with test facilities which allow secondary quantity injection and input contact and output contact isolation while the protective relays remain in their cases. All Eversource-required tripping and associated logic must be hard wired from protective relays to the interrupting device(s). Tripping and or/logic derived from programmable logic controllers (PLCs), computers, or other similar devices is not acceptable for Eversource-required protection. All Eversource-required voltage relaying applied to three-phase energy sources must be applied on a three-phase basis. 4.5 Control Power AC control power is not permitted for synchronous generator protection schemes. All protection systems utilized for generator protection must utilize a battery power source. AC-powered inverters are not an acceptable DC supply. The battery must be equipped with appropriate charging and monitoring facilities. The monitoring facilities must announce battery high voltage, battery low voltage, and battery grounds. Interrupting devices associated with Eversource-required protection and supplied power from the DC battery must be equipped with facilities configured to trip the associated generator interrupting device with an alternate supply immediately on loss of DC system trip capability. Direct AC trip and capacitor trip devices are acceptable for this backup function Any protection scheme that utilizes AC control power must be designed in a fail-safe mode. That is, all protective components must utilize contacts which are closed during normal operating conditions, but which open during abnormal conditions or when control power is lost to de-energize the generator contactor coil. These schemes require nonlatching contactors. 4.6 Current Transformers Current Transformer (“CT”) ratios and accuracy classes for CTs as used in the generating Facility protection shall be consistent with ANSI and IEEE standards. All current transformers (CT) driving Company-required protection systems must be rated by the manufacturer as to accuracy class and must be capable of driving their connected burdens with an error not exceeding 10 percent under worst-case fault conditions. The secondary windings of instrument transformers feeding Eversource-required protection equipment will be grounded at one point, and one point only. - 25 -
  3. Page 27 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 27 of 34 4.7 Voltage Transformers The DER shall be equipped with a direct voltage connection or a Voltage Transformer (“VT”), which shall be connected to the Company side of the interrupting device. For three-phase applications, a VT for each phase is required. If the interconnecting voltage transformer is ungrounded at the Utility voltage, this VT shall be a single three-phase device or three single-phase devices connected from each phase to ground on the Company’s side of the DER interconnecting transformer, rated for phase-to phase voltage. All voltage transformers (VT) driving Company-required protection systems must be formally rated by the manufacturer as to accuracy class and must be capable of driving their connected burdens with an error not exceeding 1.2 percent. 4.8 Transfer Trip Schemes A transfer trip scheme may be required by the Company to ensure safe and reliable operation of the EPS. A transfer trip scheme is a system that automatically isolates the DER installed with a customer service during a potentially adverse condition where control and protection solutions located solely at the DER facility may not be able to detect the condition. If a transfer trip scheme is deemed necessary, the Company will explain the necessity and cost for implementing that solution with the DER owner. The scheme will be driven by a signal sent by the Company and received and acted upon by equipment designated by the Company to isolate the DER facility from the Company EPS. The communication medium required to install the transfer trip scheme may vary due to application and may include radio, phone, or high-speed fiber. 4.9 Generator Step-Up (GSU) Transformer Configurations The Company may not specify Generator Step-Up (GSU) transformer configuration type. However, the transformer high side must be compatible with the EPS. The protection requirements listed in Section 3.2 shall apply to all GSU types. The DER owner’s engineer shall design a protection scheme that is able to sense and isolate the DER facility for all instances of Over/Under Voltage (27, 59), Over/Under Frequency (80/81) and Over Current (50/51) for BOTH sides of the GSU. Potential Transformers for relay applications shall always be installed on the high voltage side of the GSU. 4.10 Grounding and Bonding Eversource reserves the right to specify any aspect of the DER’s grounding scheme if deemed necessary by Eversource Engineering. This may include GSU winding configuration and neutral grounding method. - 26 -
  4. Page 28 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 28 of 34 Effective grounding shall be required for all DER interconnections where any of the following is true: • • • • The fault current at the point of common coupling (PCC) is caused to increase by at least 10 percent of the existing value. Areas where fault current may already be deemed excessive. DER interconnections equal to or larger than 1MW. Anywhere there may exist a potential islanding concern regarding generation to load ratio. Eversource will review and deem the proposed design effectively grounded for all DER facilities. Any changes to the approved one-line will require reevaluation for effective grounding. Change in grounding will be reviewed for potential impacts on Eversource distribution system or might require a restudy. Effective Grounding Methods: To achieve effective grounding, the DER owner shall design and install an interconnection system where the ratio of the DER’s reactance parameters meets the following criteria: X0/X1<3 X0 = zero sequence reactance and X1 = positive sequence reactance at the PCC DER that requires effecting grounding shall use one of the following methods: • A GSU with a reactively grounded neutral on the high (utility) wye-connected side and a delta configuration on the low (generator) side. • A GSU with a grounded-wye / grounded-wye configuration and a grounding transformer on either side of the GSU. • A delta high (utility) side GSU configuration and a grounding transformer on the high (utility) side. DER that does NOT require effecting grounding shall use: • A GSU with delta windings on the high (utility) side of the GSU in conjunction with a customer provided 59N (3V0) scheme fed by PTs on the high (utility) side of the GSU. - 27 -
  5. Page 29 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 29 of 34 4.11 Closed Transition Emergency (Stand-by) Generator (“EG”) 4.11.1 Momentary Parallel A DER may momentarily be paralleled with the Company EPS to provide disturbance free transfer of load to and from the EPS for testing, peak shaving, load curtailment, or returning load to Company supplied service. Interconnection requirements will be determined by the length of time the generation is paralleled with the EPS. a) Instantaneous Parallel [Less than 10 cycles (0.167 seconds)]. Additional Generator relaying in this section are generally not required, but may be specified, installed, and maintained at the discretion of the EG owner. If installed, the following conditions apply: (1) The EG does not have to present a grounded-wye source to the EPS. (2) The parallel and disconnecting operation must be automatic, instantaneous (switching time only) and less than 10 cycles (0.167 seconds) duration. (3) A paralleled transfer must be blocked if the normal source to the load is not within +/- 10% of nominal voltage. (4) The transfer scheme must be acceptable to the Utility. (5) The parallel operation must be monitored by a timing relay, which will trip the generators main breaker or contactor if the parallel operation lasts longer than 0.5 seconds. The tripping voltage must be from a battery. Capacitor trip devices are not acceptable. b) Transitional Parallel (1) The EG does not have to present a grounded-wye source to the EPS. If the EG does not present a grounded-wye source, Zero Sequence Over Voltage Relays (59G) must be installed and wired to trip the generator(s). (2) The parallel, EG loading and disconnecting operations must be automatic. Parallel time must be kept to a minimum and must never exceed five (5) seconds. (3) A paralleled transfer must be blocked if the normal source to the load is not within +/- 10% of nominal voltage. (4) The transfer scheme must be acceptable to the Utility. (5) The parallel operation must be monitored by a timing relay, which will trip the EG main breaker(s) if the parallel lasts longer than 5 seconds. The tripping voltage source must be from a battery. Capacitor trip devices are not acceptable - 28 -
  6. Page 30 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 30 of 34 (6) Over/under voltage and over/under frequency relays must be installed based on the size and type of generation being installed. Additional EG relaying is not required but may be specified, installed, and maintained at the discretion of the EG owner. (7) The EG owner must receive permission from the Company prior to making the parallel with the generator. 4.12 Open Transition Emergency (or Stand-by) Generator (EG) Connection of an EG does not require an Interconnection Application when the EG facility’s manual or automatic transfer switch will not allow any parallel operation of the EG Facility with the EPS. This electrical state (i.e., open transition transfer) is typically referred to as “breakbefore-make,” which means that the EG Facility’s transfer switch must be designed and operated to prevent the EPS-provided power and the EG Facility-provided power from powering the Facility circuits (i.e., load) at the same time. Consequently, this mode of operation will also prevent the generating Facility from potentially energizing the EPS. 5 Networks 5.1 Spot Networks The proposed DER to be interconnected to the load side of spot network protectors must utilize an inverter-based equipment package and, when aggregated with other inverter-based DER, shall not exceed the lesser of five percent (5%) of a spot network’s maximum load or 50 kW. Under no condition shall the interconnection of a DER facility result in a back feed of, or cause unnecessary operation of, any spot network protectors. All inverters must be IEEE 1547 and UL1741 compliant and certified to stop conducting prior to the three (3) cycle response of the network protector relays. All network interconnections shall also align with all sections of IEEE 1547 and IEEE 1547.6. Below are additional requirements regarding IEEE 1547 compliance on Eversource networks. • Connection of the DER to the EPS shall be permitted only if the EPS network bus is already energized by more than 50% of the installed network protectors. The customer shall also install a utility grade control scheme capable of monitoring the status of all network protectors and will trip a dedicated DER breaker instantaneously any time the number of closed network protectors falls to 50% or less. • The DER shall comply with all Company anti-islanding requirements. • The customer shall install minimum import protection (32 relay functionality) that is set to trip a dedicated DER breaker(s) and isolate all DER from the Eversource EPS any time power import at the metering location drops below 10% of the customer’s minimum load or 10% of the DER facility’s total gross name plate rating, whichever is - 29 -
  7. Page 31 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 31 of 34 greater. Facilities with multiple DERs in parallel on site, the ‘DER name plate’ value will be considered the cumulative sum of all DER name plates on site. 5.2 Area Networks A generating facility proposed to be interconnected to the load side of an area network protector must utilize an inverter-based equipment package and meet all of the following requirements. • • • • • When aggregated with other inverter-based generation, the DER shall not exceed 50 kW at any location. A location is defined as any manhole, secondary network vault or service box. This criterion is designed to ensure that no more than 50 kW of DER is located on the same secondary network node. In addition, the aggregate DER interconnected to an area network grid shall be limited to 3% of the maximum network transformer connected kVA with the feeder supplying the largest number of network units out of service, or a maximum of 500 kW, whichever is less. The DER shall comply with all applicable standards (e.g. IEEE 1547, IEEE 1547.6, UL1741, etc.) The DER shall comply with all Company interconnection requirements. The customer shall insure that the DER cannot export power to the area network at any time under any contingency and shall install minimum import protection (32 relay functionality) that is set to trip a dedicated DER breaker(s) and isolate all DER from the Eversource EPS any time power import at the metering location drops below 10% of the customer’s minimum load or 10% of the DER facility’s total gross name plate rating, whichever is greater. Facilities with multiple DERs in parallel on site, the ‘DER name plate’ value will be considered the cumulative sum of all DER name plates on site. Load history, dynamic network studies, engineering design drawings or additional equipment may be required by Eversource Engineering to allow for interconnection. 6 Testing and Maintenance Requirements All testing must be completed in accordance with the latest approved version(s) of IEEE 1547. 6.1 Witnessing of Commissioning Test The Company requires inspections of completed installations for compliance with requirements. The Company reserves the right to require a Witness Test of the commissioning of all DER Facilities as approved by the Company. The DER owner will provide a proposed Witness Test procedure and all requisite supporting documentation for review by the Company once the DER owner has completed the installation of the Facility. - 30 -
  8. Page 32 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 32 of 34 Testing typically includes, but is not limited to: • CT and CT circuit polarity, ratio, insulation, excitation, continuity and burden tests. • VT and VT circuit polarity, ratio, insulation and continuity tests. • Relay pick-up and time delay tests. • Functional breaker trip tests from protective relays. • Relay in-service test to check for proper phase rotation and magnitudes of applied currents and voltages. • Breaker closing interlocks tests. • Paralleling and disconnection operation. • Anti-islanding function, if applicable. • Non-export functions, if applicable. • Synchronizing Controls, if applicable. • Proof of inability to energize deadlines. Each commissioning test shall include both a calibration check and an actual trip of the circuit breaker or contactor from the device being tested. Visually setting a calibration dial, index or tap is not considered an adequate calibration. 6.2 Periodic Testing The DER owner is responsible for the periodic maintenance of all relays, interrupting devices, control schemes, and batteries that involve the protection of the EPS. Eversource may require annual testing and calibration of relays. Batteries shall be load tested once every twenty-four months, or more frequently based on the manufacturer’s recommendations. The test cycle for protective relaying must not be less frequent than once every sixty (60) calendar months or the cycle recommended by the manufacturer, whichever is shorter. The DER owner must provide copies of these test records to the Utility upon request. The Company shall have the right to monitor the periodic maintenance performed. - 31 -
  9. Page 33 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 33 of 34 For Company required protection relays and elements a Company approved independent certified testing company must be utilized. Each routine check shall include both a calibration check and an actual trip of the circuit breaker or contactor from the device being tested. Visually setting a calibration dial, index or tap is not considered an adequate calibration. 6.3 Safe Operations and Maintenance The DER owner shall operate, maintain, repair, and inspect, and shall be fully responsible for the DER and any other associated facilities that it now or hereafter may own unless otherwise specified in an Agreement between the DER owner and the Company. The DER owner and the Company shall each be responsible for the maintenance, repair and condition of its respective lines and appurtenances on its respective side of the point of interconnection. The Company and the DER owner shall each provide equipment on its respective side of the point of interconnection that adequately protects the EPS, personnel, and other people from damage and injury. All maintenance shall be performed as specified by equipment manufactures specification and as specified in any Agreement between the Company and the DER owner. - 32 -
  10. Page 34 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 34 of 34 Appendix A - Utility Grade Relay Requirements When specified and required utility grade protective relay systems shall meet the following standards: • • • • • • • • • • • • • IEEE C37-90, .1, .2 IEEE C39.90.1 Environmental testing Standards Part 2 of: IEC 68-2-1, IEC 68-2-2, IEC 68-2-3, & IEC 68-230, Part 5 of IEC 255-5, Insulation tests for electrical relays. Section 6 Dielectric Tests. Part 21 of IEC 255-21-1, 2, 3, Sections 1, 2 & 3. (Vibration, shock, bumps.) IEC 255-22-1, 2, 3, 4 Section’s 1, 2, 3 & 4, Electrical disturbance tests for measuring relays and protection equipment. IEC 255-5 Insulation (Impulse Voltage Withstand) IEC 801- 2, 3, & 4 Electromagnetic compatibility for Industrial-process measurement and control equipment parts 2, 3, and 4. Relays which meet the latest versions of IEEE C62.45-2002 Relays that have appropriate test plugs/switches for testing the operation of the relay without unwiring or disassembly. Relays that have targets to indicate relay operation. Relays that have the ability to record and store fault events. Industrial grade relays are generally not permitted for DER interconnections This requirement is to ensure that the protective relay system will work under a variety of environmental and operational conditions. - 33 -

Text of ICC-001 Attachment 5.pdf

Extracted from the file · 67 pages · 136,480 characters

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)