Interrogatory responses
Answers to questions 1, 2, 4, 10, 18, 20
Files13
ICC-001_Final.pdf
PDF · 114 KB · 1 pageText searchable
Download ICC-001_Final.pdfRead the text of ICC-001_Final.pdf
ICC-001 Attachment 1.pdf
PDF · 3.4 MB · 28 pagesText searchable
Download ICC-001 Attachment 1.pdfRead the text of ICC-001 Attachment 1.pdf
ICC 001 Attachment 2.pdf
PDF · 4.0 MB · 68 pagesText searchable
Download ICC 001 Attachment 2.pdfRead the text of ICC 001 Attachment 2.pdf
ICC-001 Attachment 3.pdf
PDF · 1.1 MB · 34 pagesText searchable
Download ICC-001 Attachment 3.pdfRead the text of ICC-001 Attachment 3.pdf
ICC-001 Attachment 4.pdf
PDF · 1.3 MB · 34 pagesText searchable
Download ICC-001 Attachment 4.pdfRead the text of ICC-001 Attachment 4.pdf
ICC-001 Attachment 5.pdf
PDF · 3.5 MB · 67 pagesText searchable
Download ICC-001 Attachment 5.pdfRead the text of ICC-001 Attachment 5.pdf
ICC-002_Final.pdf
PDF · 143 KB · 2 pagesText searchable
Download ICC-002_Final.pdfRead the text of ICC-002_Final.pdf
ICC-002 Attachment 1.pdf
PDF · 1.1 MB · 29 pagesText searchable
Download ICC-002 Attachment 1.pdfRead the text of ICC-002 Attachment 1.pdf
ICC-002 Attachment 2.pdf
PDF · 1.5 MB · 74 pagesText searchable
Download ICC-002 Attachment 2.pdfRead the text of ICC-002 Attachment 2.pdf
ICC-002 Attachment 3.pdf
PDF · 2.5 MB · 27 pagesText searchable
Download ICC-002 Attachment 3.pdfRead the text of ICC-002 Attachment 3.pdf
ICC-004_Final.pdf
PDF · 127 KB · 1 pageText searchable
Download ICC-004_Final.pdfRead the text of ICC-004_Final.pdf
ICC-010_Final.pdf
PDF · 168 KB · 4 pagesText searchable
Download ICC-010_Final.pdfRead the text of ICC-010_Final.pdf
ICC-018_Final.pdf
PDF · 135 KB · 2 pagesText searchable
Download ICC-018_Final.pdfRead the text of ICC-018_Final.pdf
Text of ICC-001 Attachment 3.pdf
Extracted from the file · 34 pages · 76,972 characters
Page 5 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 5 of 34 1 INTRODUCTION AND SCOPE The purpose of this document is to provide information and to familiarize Customers, distributed energy resource owners, architects, engineers, contractors, operator’s and developers with the standards and policies associated with the interconnection of Distributed Energy Resources (“DER”) including but not limited to Distributed Generation (DG) resources to the Eversource Energy (“Company”) Electric Power Systems (“EPS”).1 This document provides requirements relative to the safety, performance, reliability, operation, design, protection, testing and maintenance of the DER’s interconnecting facility. NOTE: Please note that this document is a guide, and the Company reserves the right to change its policies, procedures and standards when deemed necessary to maintain the reliability of the EPS and the safety of the Company’s customers, workforce and general public. Eversource has established administrative processes for interconnecting all types and sizes of DER. As the level of customer and developer interest advances beyond the initial inquiry phase, a formal review process takes place in which the potential impact of a given site on the Eversource EPS is reviewed. This review may include the execution of formal study agreements and may result in general and specific requirements for certain design aspects of the DER. These requirements typically include electrical protection and control design and configuration, interface transformer configuration, required modifications to local Eversource facilities, metering and supervisory control and data acquisition (“SCADA”) requirements, and in some cases operating constraints for the proposed DER. The information contained within this document is intended to help parties contemplating interconnection of a DER to better understand the general nature and extent of typical Eversource requirements for an interconnection of various type and electrical size. NOTE: Please note that no attempt has been made to identify all potential Eversource requirements for each possible type of DER source, technology, size and/or configuration. NOTE: Eversource metering and SCADA requirements are not included in this document, other than by reference. NOTE: The information contained in this document is not a design manual nor is it to be a substitute for responsible engineering practice. The information and requirements contained in this document are in no way a substitute for the formal interconnection process, engineering impact studies and reports which may be required for a given site, nor shall they supersede other Company standards or provisions. The Company will be able to advise DER owners during review of their application as to whether studies will be required. Where such a study is required, materials purchased and engineering performed to -4-Page 6 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 6 of 34 address Company requirements must be based on the details contained within the study report or related correspondence. Any commitments which are made by a DER owner are made entirely at the DER owner’s risk. 1 The following Companies are doing business as Eversource Energy: NSTAR Electric Company (“NSTAR”), Western Massachusetts Electric Company (“WMECO”), The Connecticut Light and Power Company (“CL&P”), and Public Service of New Hampshire (“PSNH”). -5-Page 7 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 7 of 34 2 GENERAL REQUIREMENTS 2.1 Documents and Standards Any DER owner seeking to interconnect a DER to the Company EPS or modify an existing DER must meet the requirements and specifications set forth in this document and any other requirements which may be imposed by the Company or by ISO-NE, including without limitation: For Massachusetts: • Eversource distributed generation interconnection tariffs • Massachusetts TSRG common technical standards manual For New Hampshire: • Eversource guidelines for generator interconnections • Eversource interconnection standards for inverters • New Hampshire Code of Administrative Rules For Connecticut: • Eversource and The United Illuminating guidelines for generator interconnection • Eversource and The United Illuminating guidelines for the interconnection of residential inverter-based generators 25 kW or less In addition, the following should be adhered to as applicable: • • • • • The latest approved version of the IEEE 1547 (Standard for Interconnecting Distributed Resources with Electric Power Systems) adopted by Eversource The latest approved version of the IEEE 1547.1 (Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces) adopted by Eversource Latest approved version of UL (Underwriters Laboratories) 1741 (Inverters, Converters, Controllers, and Interconnection System Equipment for use with Distributed Energy Resources). The latest approved version of Inverter Source Requirement Document of ISO New England (ISO-NE) adopted by Eversource. DER project sponsors should be familiar with all applicable ISO-NE policies and procedures, including: ▪ Operating Procedure No. 14 – Technical Requirements for Generators, Demand Resources, Asset Related Demands and Alternative Technology Regulation Resources ▪ Operating Procedure No. 18 – Metering and Telemetering Criteria -6-Page 8 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 8 of 34 ▪ ▪ ISO-NE Planning Procedure 5-1 – Procedure for Review of Governance Participant’s Proposed Plans (Section I.3.9 Applications: Requirements, Procedures, and Forms), and ISO-NE Planning Procedure 5-3 – Guidelines for Conducting and Evaluating Proposed Plan Application Analyses. 2.2 Safe Operation and Maintenance The DER owner shall operate and maintain the DER in accordance with the applicable manufacturer’s recommended maintenance schedule, and in compliance with all aspects of the Company’s Interconnection Tariff or agreements, as applicable. The DER owner must keep maintenance records that the Company may request from time to time for review. The DER owner shall continue to comply with all applicable laws and requirements after an interconnection has occurred. In the event the Company has reason to believe that the DER installation may be the source of problems on the Company EPS, the Company has the right to install monitoring equipment at a mutually agreed upon location to determine the source of the problems. If the DER is determined to be the source of the problems, the Company may require disconnection as outlined in the Interconnection Tariff or agreement, as applicable. 2.3 Facility Isolation The Company may, without notice, deem it necessary to isolate a DER from the EPS. This may be due to abnormal system configurations, emergency repairs, maintenance, or adverse impact cause by the generator. This disconnection may be done locally at the required lockable disconnect switch or remotely using an Eversource device. 2.4 Access Both the Company and the DER shall each provide to the other and update a telephone number that can always be used to allow either Party to report an emergency. The owner of the land (“Landowner”) on which the Company’s equipment or facilities are in instances where the DER owner and electric customer are not the owner of such land shall allow the Company access to the Company’s equipment by the applicable Interconnection Tariff or agreement. 2.5 Future System Changes and Responsibilities The EPS is dynamic and must be able to accommodate future load growth and system changes. Therefore, the Company may, at its discretion and cost, make upgrades to the EPS. Such upgrades may have an impact on existing DER facilities. To ensure continued safe operations, DER facility Interconnection Agreements may need to be revised in accordance with the upgraded EPS. -7-Page 9 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 9 of 34 The DER owner and the Company will work together and cooperatively to implement the appropriate changes, upgrades, etc. to attain the common goal of continued safe and reliable operation of the interconnection of the DER to the EPS. 2.6 DER SCADA Visibility & Control Requirements As DER penetration has increased throughout the distribution system, it has posed significant challenges to system safety, reliability and stability. In areas that are heavily saturated with DER, the ability to monitor and control these devices can help electric distribution companies prepare for and address impacts of high penetration and ensure safe and reliable operation of the EPS. Below are some of the technologies that help facilitate monitoring and control of DER through SCADA devices: 2.6.1 DER Gateway to Power Plant Controller (PPC) Design When monitoring and operating customer equipment is required, all configurations and communications shall be designed based on a DER Gateway to PPC design. This configuration requires: • • Eversource DER Gateway – This device will be installed at the point of interconnection on the Eversource side and will be used to transfer data between the Eversource SCADA System and the Customer PPC. This device will have the capability to provide indication, telemetry, and control. Customer PPC – This device will be installed and maintained by the Customer and will provide the indication, telemetry, and control of the DER to the Eversource DER Gateway. There are scenarios where the RTAC design could be called for without a POI recloser. Eversource still requires a Utility Accessible Disconnect Switch (UADS) to be installed on site. 2.7 Point of Interconnection (POI) Reclosers All POI recloser installations will be programmed for Eversource circuit protection only. It is not intended to provide protection for customer owned equipment. The intention of a POI Recloser is to isolate the Customer from the Eversource system for the following conditions: a. Faults between the POI Recloser and the first customer owned fault interrupting device. b. Power flows into the Eversource system from the customer bus. Power flow could be sourced by a customer-owned generator. c. Faults not adequately cleared by the customer’s fault interrupting devices. In the event of customer equipment failing to operate, the POI recloser will act as a failsafe for the Eversource system. -8-Page 10 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 10 of 34 Overcurrent based fault protection settings will be coordinated against the Eversource system regarding customer load. Coordination with customer owned protection will be attempted but cannot be guaranteed. Reverse power and reverse current protection settings will be utilized to detect current flowing from the customer bus into the Eversource system. Time delays settings for these conditions will be set by Protection & Control Engineering. Reverse power will be used to detect load flow from the customer bus. Reverse current will be used to detect current flowing from the customer bus to a fault on the Eversource system. 2.8 Interconnection Requirements based on DER size and Site Conditions DERs Less Than 500 kW Certified and non−certified DER less than 500 kW generally do not require DSCADA visibility for standalone facilities and behind−the−meter facilities. However, on a case−by−case basis, Eversource reserves the right to require DSCADA visibility as required. DERs Greater Than or Equal to 500 kW and Less Than 5 MW DER facilities between 500 kW and 5 MW require SCADA monitoring, and control is implemented in the interconnection design. Eversource requires a Customer PPC to enable SCADA control. Eversource requires a POI recloser to provide coordinated fault protection, reverse power automatic isolation and as a failsafe interrupting device in the event SCADA controls fail to isolate all DER sources. DER Greater Than or Equal to 5 MW DER facilities greater than or equal to 5 MW require that SCADA monitoring, and control is implemented in the interconnection design. Eversource requires a Customer PPC for SCADA control. In addition, the DER will be subject to ISO New England Interconnection procedures for monitoring via an RTU. Behind-The-Meter Facilities Special consideration should be given to large load customers who have DER facilities equal to or greater than 500 kW. For these applications, a DSCADA RTAC is required and will be configured to disconnect the connected DER facility only. Eversource may require a POI recloser to provide coordinated fault protection, reverse power automatic isolation and a failsafe interrupting device if DSCADA controls fail to isolate all DER sources. -9-Page 11 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 11 of 34 3 General Design Requirements 3.1 Interconnection Transformer Winding and Grounding Considerations In order to provide maximum operating flexibility for the DER and to minimize possible adverse effects on the facilities of other Eversource customers, the DER shall provide, at its sole cost and expense, an interconnection transformer between the DER facility and the Company-owned equipment, unless this requirement is waived by the Company in its sole discretion. When required, the DER owner shall propose to the Company an interconnection transformer and grounding configuration (if required), which shall be subject to the approval of the Company at its sole discretion. The final winding connection and grounding configuration is subject to the approval of the Company at its sole discretion. See also Section 2.8 (Grounding and Bonding) and Section 3.4 (GSU Transformer Configurations). 3.2 Power Quality Requirements All DER facilities shall comply with the power quality requirements in the latest version of IEEE 1547. The DER shall not cause voltage step or ramp change at the POI exceeding 3% at medium distribution voltages per IEEE 1547-2018 clause 7.2.2. Eversource also requires that the maximum Rapid Voltage Change (RVC) shall not exceed the values listed below, unless the Company establishes alternate limits in special situations that include, but are not limited to, tap changer and capacitor operation, and the type and number of customers on the circuit. Simultaneous output changes on other DER sites on the circuit may be considered for the analysis if they are the same type, since a common event could affect more than one site. If the circuit occupies a large geographic area, the Company may determine volatility of DER output. Harmonic current injection into the EPS at the Point of Common Coupling (“PCC”) shall be consistent with limits established by IEEE 519 and IEEE 1547. The interconnection of the DER facility shall not increase the potential for Ferroresonance in the EPS. The interconnection of the DER facility shall not cause temporary under voltages or over-voltages as determined by the Company when studying the proposed interconnection. 3.3 Voltage Regulation and Power Factor The DER facility shall not: (i) actively regulate the voltage of the EPS unless specifically agreed by the Company; (ii) cause the voltage at any point along the EPS to deviate from the voltage range defined in the regulatory requirements for each State. of nominal or (iii) cause any voltage - 10 -Page 12 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 12 of 34 deviations, which are objectionable to other customers of the Company as determined by the Company when studying the proposed interconnection. A DER owner may be required to install equipment that can be set to operate at a power factor between 0.90 lagging (Vars to the Company EPS) and 0.90 leading (Vars from the Company EPS). All DERs greater than 1 MW connecting to the Eversource distribution system are required to have capability to operate in Volt-Var control mode per the latest version of IEEE 1547. The Company regulates the voltage on the EPS by employing load tap changing transformers, line voltage regulators and/or capacitors. Upgrades to these facilities may require system modifications resulting from DER interconnection. 3.4 Transformer Reverse Power Capability Any proposed DER facility that has the potential to cause reverse power flow through an Eversource substation transformer may require an Impact Study. The Impact Study will specifically address the ability of the transformer to accommodate reverse power flow. The following items will be evaluated: System Voltage Control: The Impact Study shall determine if system voltage control can be maintained at various boundary conditions and will evaluate excessive load tap changer (“LTC”) operation caused by intermittent DER sources. LTC Design, Controller Type and Controller Settings: The Impact Study will evaluate the capability of LTC and controller to accommodate reverse power conditions and to respond with appropriate control strategies. Voltage and current inputs must be available to the LTC controller. Any LTC controller that is not appropriate for reverse power must be replaced with a suitable controller with both voltage and current inputs. The requirement to add a backup controller will also be evaluated. LTC upgrades may require system modifications resulting from a DER facility interconnection. Controller settings will be determined on case-by-case analysis of DER type and penetration. Capacity Limit: Unless constrained by other more limiting requirements, aggregate DER (in kVA) will be permitted up to 95% of the transformer’s top nameplate ampere rating (in kVA) with maximum cooling operational. The minimum forward loading of the transformer shall be considered for the assessment. Reverse power flow that will significantly add to the transformer insulation loss of life on a routine basis, based on the transformer specification and the insulation aging description in the - 11 -Page 13 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 13 of 34 latest version of IEEE Std. C57.91, will be evaluated. Any required transformer upgrades will be included in the system modifications section of the impact study that are required before interconnecting the DER facility. DER facilities must supply a balanced three-phase output such that there would never be a situation where a substation transformer could experience forward power flow on one or more phases while experiencing reverse power flow on the other phase(s). As a part of the Impact Study process, projects will be reviewed on a case-by-case basis to determine if additional relays or other protection devices will be required. Any required protection devices will be included in system modifications required to interconnect the DER facility. 3.5 Dispatch Limiting Schedule The DER Dispatch Limiting Schedule is calculated during technical review and provides maximum operating capabilities for both charging and discharging activity of the DER based on type. The following provides the format for schedule that DERs > 500 kW are required to follow. Charge Limiting Schedule (CLS) and Discharge Limiting Schedule (DLS) refer to importing from and exporting to the grid in all cases respectively. Discharge Limiting Schedule (DLS) 07:00 - 12:00 12:00 - 15:00 15:00 - 19:00 19:00 - 07:00 Spring % % % % Summer % % % % Fall % % % % Winter % % % % Charge Limiting Schedule (CLS) 06:00 - 11:00 11:00 - 15:00 15:00 - 22:00 22:00 - 06:00 Spring % % % % Summer % % % % Fall % % % % Winter % % % % - 12 -Page 14 of 34
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 4 Page 14 of 34 The Seasons are defined as follows: • Spring: March, April, May • Summer: June, July, Aug • Fall: Sept, Oct • Winter: Nov, Dec, Jan, Feb 3.6 Insulation Coordination The DER facility connected to the EPS (even in closed transition mode) must be able to withstand the normal steady state and abnormal transient voltages that can be experienced on the EPS. Lightning and switching of equipment are two common sources of high abnormal voltage transients. The DER shall be responsible for procuring equipment with a level of insulation and fault withstand capability compatible with the grounding method specified below. 3.7 BIL (Basic Impulse Insulation Level) Equipment connected to the EPS must be designed with a certain minimum Basic Impulse Insulation Level (“BIL”). BIL, in general terms, is a measure of the ability of a piece of equipment to withstand normal and abnormal voltages. The DER shall ensure that the BIL of all the installed equipment meets the applicable standards set forth above, as well as applicable UL, ANSI and IEEE standards. Furthermore, such equipment shall be installed in compliance with all applicable local, state and federal codes. 3.8 Arc Flash The interconnection of a DER facility to the EPS shall not increase available fault current and associated arc flash energy to a level where Company workers would have to use the next level of enhanced Personal Protective Equipment (“PPE”) and/or restrictive work methods above and beyond what the workers would normally use for work at the same location without the DER facility present. System modifications to address unacceptable increase in arc flash energy levels will be addressed in the Impact Study on a case-by-case basis. 3.9 DER Facility Capacity The DER facility size is determined by the total aggregate maximum AC output of all DERs as specified on the individual DER equipment specifications (“cut sheet”) and the export/import limitations clearly defined on the one-line. - 13 -
Text of ICC-001 Attachment 5.pdf
Extracted from the file · 67 pages · 136,480 characters
Text of ICC-002_Final.pdf
Extracted from the file · 2 pages · 2,788 characters
Text of ICC-002 Attachment 1.pdf
Extracted from the file · 29 pages · 46,015 characters
Text of ICC-002 Attachment 2.pdf
Extracted from the file · 74 pages · 148,550 characters
Text of ICC-002 Attachment 3.pdf
Extracted from the file · 27 pages · 91,051 characters
Text of ICC-004_Final.pdf
Extracted from the file · 1 page · 983 characters
Text of ICC-010_Final.pdf
Extracted from the file · 4 pages · 11,507 characters
Text of ICC-018_Final.pdf
Extracted from the file · 2 pages · 2,628 characters
As listed on the current system
Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026