Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

  1. Page 11 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 11 of 67 Eversource | CT Information & Requirements 2024 Conduit Service - House End 16 in. min. Manual lever operated by-pass 22 in. min. Set socket Line Load Center of Meter Pan Slip joint Minimum one clamp Approx 5 ft. Install line side conduit into bottom left Knock Out only Compact soil to prevent settlement and strain on socket 90 degree Schedule 40 PVC sweep is required 24 in. min./ 36 in. max. Finished Grade Caution tape supplied and installed by the Customer 12" 3 in. min. electrical grade Schedule 40 PVC conduit NOTES 1. Grounding and bonding supplied by the customer required when using galvanized steel sweeps. 2. Customer provided caution tape shall be red plastic with black lettering. The warning message on the red plastic caution tape shall read: CAUTION – ELECTRICAL LINE BURIED BELOW. 3. Conduit shall be inspected by the municipal authority prior to backfilling. 4. Suitable backfill shall not contain ash, cinder, shell, frozen material, loose debris, or stones larger than 2 inch maximum dimension. 9
  2. Page 12 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 12 of 67 Eversource | CT Information & Requirements 2024 Conduit Service - Supply End Supply From Company Conduit System Finished grade Caution tape supplied and installed by Customer Company hand hole or other facility 24 in. min./ 36 in. max. 12" 1/4 in. Nylon Pulling line Approved conduit plug Minimum 3 in. electrical grade Schedule 40 PVC Supply From Company Overhead System Finished grade Caution tape supplied and installed by Customer 1/4 in. Nylon Pulling line 90 degree sweep, 24 in. min. Approved radius, galvanized steel conduit unless otherwise allowed plug by the Company Pole 4 in. min. Bonded to system neutral by the Company if required Steel sweep grounded by Eversource 24 in. min./ 36 in. max. 12" Minimum 3 in. electrical grade Schedule 40 PVC PVC coupling NOTES 1. Do not enter or open existing electrical structures such as hand holes, transformer pads, or switch vaults when installing the pulling line. 2. Minimum 3 inch electrical grade schedule 40 PVC. Contact the Company for acceptable conduit size. 3. Grounding and bonding supplied by the customer required when using galvanized steel sweeps. 4. Electrical service sweeps shall be located on the pole side away from oncoming traffic. 5. Customer provided caution tape shall be red plastic with black lettering. The warning message on the red plastic caution tape shall read: CAUTION – ELECTRICAL LINE BURIED BELOW. 6. Conduit shall be inspected by the municipal authority prior to backfilling. 7. Suitable backfill shall not contain ash, cinder, shell, frozen material, loose debris, or stones larger than 2 inch maximum dimension. 10
  3. Page 13 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 13 of 67 Eversource | CT Information & Requirements 2024 Electric Equipment Ownership & Required Meter Clearances CT ELECTRIC EQUIPMENT OWNERSHIP & REQUIRED METER CLEARANCES In the event your home’s electrical equipment is damaged, you may have questions regarding which parts of your electric service are privately owned, which parts are maintained by Eversource, and what the proper clearances are for safe meter access. Service Drop: Installed, owned and maintained by Eversource Clevis (House Knob): Customer owned and maintained To Utility Pole Weatherhead: Customer owned and maintained Who Owns What n Eversource maintains the electric poles, All equipment (except meter) beyond the point of connection is furnished, installed, owned and maintained by the customer wires and other equipment you see along your street, ending at the service drop (see diagram, right). Eversource also repairs any damage to the meter itself. n The wires and equipment that run from the service drop into a residence are the responsibility of the customer. If you have damage to the wires or equipment after the service drop, please contact a licensed and insured electrical contractor to perform the necessary repairs. In a storm situation, this will expedite your service restoration as the damaged equipment will need to be fixed prior to Eversource reconnecting the power lines to your home. Meter: Eversource owned and maintained Meter Box: Customer owned and maintained Main Service Panel: Customer owned and maintained ................................................................................................................... Required Meter Clearances n For safe meter access, a clearance of four feet wide 6’ 3’ by three feet deep by six feet high is required (see diagram, left). Please keep shrubs, debris, fences and other structures clear of this area. n A three feet minimum distance between the edge of the electric meter and a gas meter is required. 4’ Contact Us 3’ For your safety and ours, do not tamper with Eversource meter(s), its seals or connections. It’s dangerous and against the law. Please visit us at eversource.com to view the Information and Requirements for Electric Supply booklet for Connecticut or call Eversource Customer Service at: Connecticut Electric [phone removed] 11 LM/CT-MA Rev8/19
  4. Page 14 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 14 of 67 Eversource | CT Information & Requirements 2024 Flood Plain Meter Installation - Overhead Approx. 5 ft. Approx. 5 ft. NOTES 1. Consult with the Company prior to construction of any location in a flood zone area. 2. In some shoreline areas designated as a flood plain, the customer may be required by FEMA regulations to install all electrical equipment above the DFE (Design Flood Elevation). This conflicts with the Company’s requirements for meter sockets to be installed no higher than 72 inches to the top of the meter. In such cases, the Customer will be required to construct a suitable permanent stepped platform that meets local code and FEMA requirements, or other means to facilitate access for Company employees to perform meter work prior to energizing the service. 3. If a suitable platform cannot be constructed due to zoning or physical location of the service, an approved meter socket can be installed below the DFE. In this case, the Customer assumes full responsibility of cost to replace the service entrance equipment in the event of flood damage. Failure to comply with these requirements may result in the Company de-energizing the service and the Customer will be responsible for bringing service to Company standards. 12
  5. Page 15 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 15 of 67 Eversource | CT Information & Requirements 2024 Flood Plain Meter Installation - Underground Approx. 5 ft. Approx. 5 ft. 2 ft. min./ 3 ft. max. NOTES 1. Consult with the Company prior to construction of any location in a flood zone area. 2. In some shoreline areas designated as a flood plain, the customer may be required by FEMA regulations to install all electrical equipment above the DFE (Design Flood Elevation). This conflicts with the Company’s requirements for meter sockets to be installed no higher than 72 inches to the top of the meter. In such cases, the Customer will be required to construct a suitable permanent stepped platform that meets local code and FEMA requirements, or other means to facilitate access for Company employees to perform meter work prior to energizing the service. 3. If a suitable platform cannot be constructed due to zoning or physical location of the service, an approved meter socket can be installed below the DFE. In this case, the Customer assumes full responsibility of cost to replace the service entrance equipment in the event of flood damage. Failure to comply with these requirements may result in the Company de-energizing the service and the Customer will be responsible for bringing service to Company standards. 13
  6. Page 16 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 16 of 67 Eversource | CT Information & Requirements 2024 Hot and Cold Meter Sequence - Self Contained Hot Sequence Line Barrier Between Phases Plastic Safety Shield Company approved Meter Socket Neutral Breaker or Fused Disconnect Disconnect Lever Bypass Load Line Cold Sequence Barrier Between Phases Plastic Safety Shield Neutral Disconnect Company approved Meter Socket Breaker or Fused Disconnect Lever Bypass Load 14
  7. Page 17 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 17 of 67 Eversource | CT Information & Requirements 2024 Instrument Transformer Connections Line Side to Utility Feed Line Side to Utility Feed 208Y/120v Used with Three-phase, 4-wire 13 Terminal Meter Socket Ø-A Ø-B Ø-C Ø-A Ø-B Ø-C CT CT CT CT CT CT VT VT VT Load Bond Load Line Side to Utility Feed L1 120/240v Used with Single-phase, 3-wire 6 Terminal Meter Socket 480Y/277v Used with Three-phase, 4-wire 13 Terminal Meter Socket Bond H1 white dot L2 H2 CT CT Utility/Line Load Current Transformer (CT) Load Bond NOTES Customer Responsibility: 1. Current transformers (CT) installed and torqued with H1 white dot polarity mark towards line/utility side. 2. Mounting provisions for voltage transformers (VT) in the horizontal position. 3. Providing and installing inside the Instrument Transformer (IT): • An approved isolated neutral from the same manufacturer and a #10 connector on the neutral. • Two #10 grounding connectors. 4. Labeling the service line and load side within the IT cabinet. 5. Conduit from the meter socket and into the IT cabinet must be 1 ½ inch in diameter and continuous. Conduit length shall be 50 feet or less. 6. Line box (LB) connections are not allowed. 15
  8. Page 18 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 18 of 67 Eversource | CT Information & Requirements 2024 Main Switch and Instrument Transformer Enclosure NOTES 6 in. min. 3 ft. max. 6 in. min. 50 ft. max. INSTRUMENT TRANSFORMER Load ENCLOSURE 1. Consult with the Company before beginning the design and before ordering equipment for any job requiring an instrument transformer (IT). ON OFF 2. Encloser shall be National Electrical Manufacturers Association (NEMA) rated, 3R minimum. OFF ON Main Switch 3. Customer is responsible for providing and installing inside the Instrument Transformer (IT) cabinet: Load Finished Grade Line Side to Utility Feed • An approved isolated neutral from the same manufacturer and a number 10 connector on the neutral. Service Ground • Two number 10 grounding connectors. 4. Conduit from meter socket to IT cabinet shall be electrical grade schedule 40 PVC or galvanized steel. Conduit to be 1 ½ inch in diameter with a minimum length of 6 inches and a maximum length 50 feet. 6 in. min. 50 ft. max. 6 in. min. 3 ft. max. ON ON Load OFF INSTRUMENT TRANSFORMER ENCLOSURE Line Side to Utility Feed Approx. 5 ft. 6 in. min. 3 ft. max. OFF Load Finished Grade • If PVC, provide and install an equipment grounding conductor. Number 10 wire or larger. 5. Line box (LB) connections are not allowed. 6. A locking provision for the main breaker and IT in the off position is required. 7. A single load breaking switch with a visible break is required immediately after the utility IT. 8. If 480/277 volt equipment is installed, provisions must be supplied for mounting voltage transformers (VT) horizontally and in the same compartment as the current transformers (CT). 16
  9. Page 19 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 19 of 67 Eversource | CT Information & Requirements 2024 Meter Load Pulse Enclosure (8"W x 8"H x 4"D) Company approved meter socket Cable supplied and installed by Customer Company supplied LOAD PULSE OUTPUT PROJECTOR (LPOP) NOTES 1. The Company will supply and install the Meter Interface Enclosure and Load Pulse Output Protector (LPOP). 2. A LPOP is for kilowatt hour pulse measurement only. 3. Customer will provide wetting voltage no greater than 30 volts AC/DC. 4. Multiple units of measure require individual load pulse output protector relays. 17
  10. Page 20 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 20 of 67 Eversource | CT Information & Requirements 2024 Metering For Secured Locations Secured Location Customer Access Only Meter Equipment 24/7 Access Secured Location Meter Equipment 24/7 Access Customer Access Only Company Access Only 18

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)