Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

  1. Page 18 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 18 of 67 Eversource | CT Information & Requirements 2024 Main Switch and Instrument Transformer Enclosure NOTES 6 in. min. 3 ft. max. 6 in. min. 50 ft. max. INSTRUMENT TRANSFORMER Load ENCLOSURE 1. Consult with the Company before beginning the design and before ordering equipment for any job requiring an instrument transformer (IT). ON OFF 2. Encloser shall be National Electrical Manufacturers Association (NEMA) rated, 3R minimum. OFF ON Main Switch 3. Customer is responsible for providing and installing inside the Instrument Transformer (IT) cabinet: Load Finished Grade Line Side to Utility Feed • An approved isolated neutral from the same manufacturer and a number 10 connector on the neutral. Service Ground • Two number 10 grounding connectors. 4. Conduit from meter socket to IT cabinet shall be electrical grade schedule 40 PVC or galvanized steel. Conduit to be 1 ½ inch in diameter with a minimum length of 6 inches and a maximum length 50 feet. 6 in. min. 50 ft. max. 6 in. min. 3 ft. max. ON ON Load OFF INSTRUMENT TRANSFORMER ENCLOSURE Line Side to Utility Feed Approx. 5 ft. 6 in. min. 3 ft. max. OFF Load Finished Grade • If PVC, provide and install an equipment grounding conductor. Number 10 wire or larger. 5. Line box (LB) connections are not allowed. 6. A locking provision for the main breaker and IT in the off position is required. 7. A single load breaking switch with a visible break is required immediately after the utility IT. 8. If 480/277 volt equipment is installed, provisions must be supplied for mounting voltage transformers (VT) horizontally and in the same compartment as the current transformers (CT). 16
  2. Page 19 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 19 of 67 Eversource | CT Information & Requirements 2024 Meter Load Pulse Enclosure (8"W x 8"H x 4"D) Company approved meter socket Cable supplied and installed by Customer Company supplied LOAD PULSE OUTPUT PROJECTOR (LPOP) NOTES 1. The Company will supply and install the Meter Interface Enclosure and Load Pulse Output Protector (LPOP). 2. A LPOP is for kilowatt hour pulse measurement only. 3. Customer will provide wetting voltage no greater than 30 volts AC/DC. 4. Multiple units of measure require individual load pulse output protector relays. 17
  3. Page 20 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 20 of 67 Eversource | CT Information & Requirements 2024 Metering For Secured Locations Secured Location Customer Access Only Meter Equipment 24/7 Access Secured Location Meter Equipment 24/7 Access Customer Access Only Company Access Only 18
  4. Page 21 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 21 of 67 Eversource | CT Information & Requirements 2024 Modular Meter Panels For Group Metering Service load disconnects Individual barriers are required and shall be installed by the Customer ON 6 ft. OFF max. Disconnect with overcurrent protection needed on groups of meters over 6 2 ft. min. Floor or Finished Grade NOTES 1. Service load disconnects may be located above, below, or beside meter. 2. Individual meter sockets for meter packs require individual barriers to be purchased and installed by the Customer with provisions for seals and barrel locks. 3. For single and three phase 120/208 volt network and 277/480 volt services, the entire bank shall be cold sequenced. 4. When modular metering is 277/480 volts, each individual socket shall be cold sequenced. 5. Sketch of meter panel arrangements must be submitted to the Company for approval prior to layout and installation of equipment. 6. Refer to Metering for labeling requirements. 7. The grounding electrode conductor connection shall be made at an accessible location in the service equipment and not in the meter socket. 8. Bollards are required when there is a potential for damage by vehicles. Refer to Metering for required clearances. 19
  5. Page 22 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 22 of 67 Eversource | CT Information & Requirements 2024 Outdoor Instrument Transfomer Meter Socket With Test Switch Approx. 5 ft. Finished Grade NOTES 1. Consult with the Company before starting design of any job where an instrument transformer (IT) installation is required. 2. Refer to approved meter socket list located at eversource.com. 3. Conduit from meter socket to IT cabinet shall be electrical grade schedule 40 PVC or galvanized steel. Conduit to be 1 ½ inch in diameter with a minimum length of 6 inches and a maximum length 50 feet. • If PVC, provide and install an equipment grounding conductor. Number 10 wire or larger. 4. Conduit is to be installed in the bottom of the meter socket only utilizing the manufacturer provided knockouts. Top feed is not allowed. 5. A slip joint shall be required if the conduit is fed from underground. 6. All conduit connections in the meter socket shall be weather tight. 20
  6. Page 23 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 23 of 67 Eversource | CT Information & Requirements 2024 Overhead Service Drop Service drop furnished, installed and maintained by the Company All facilities beyond this service point, except the meter, shall be furnished installed, owned and maintained by the Customer 16 ft. min. Road or street surface UNACCEPTABLE Service point located above building extension is not acceptable because the service point cannot be directly reached from a ladder placed on the ground 21
  7. Page 24 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 24 of 67 Eversource | CT Information & Requirements 2024 Overhead Service Entrance Service drop furnished, installed, owned and maintained by the Company Clevis Weatherhead All facilities beyond the service point, except the meter, shall be furnished, installed, owned and maintained by the Customer 12 ft. min. Allow sufficient conductor (20") to form drip loops 10 ft. min. Approved outdoor manual lever operated by-pass Meter Socket Approx. 5 ft. 2 ft. min. clearance to nearest wall 3 ft. min. clearance Gas meter, regulator, propane cylinder, exhaust vent Service equipment, 100 amp or larger recommended NOTES 1. Stud location for the Company clevis shall be marked by the Customer. 2. Contact the Company for a service attachment point exceeding 20 feet in height. 3. Contact the Company for a service exceeding 125 feet in length. 22
  8. Page 25 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 25 of 67 Eversource | CT Information & Requirements 2024 Permanent Built Meter Pedestal Minimum 3 in. galvanized pipe with end caps 12 gauge galvanized steel "U" channel Service equipment Line side conduitLeft side only Approx. 5 ft. 3 in. min. slip joint with one clamp Finished Grade Driven Ground Rod 12" 24" Footing Caution tape supplied and installed by Customer 90 degree bend 24 in. min. radius NOTES 1. Single phase 120/208 volt network, three phase 208Y/120 volt network, and three phase 480Y/277 volt services shall be cold sequenced. 2. Company shall provide service conductors to line side of meter socket. 3. Customer shall provide, own, and maintain approved conduit, load side conductors from the meter, and main disconnect. 4. Customer shall install 3 inch minimum schedule 40 PVC conduit for service conductors. 5. Customer provided caution tape shall be red plastic with black lettering. The warning message on the red plastic caution tape shall read: CAUTION – ELECTRICAL LINE BURIED BELOW. 6. Footing shall be a minimum of 8 inches in diameter with a depth no less than 4 feet, filled with concrete from bottom of hole to just above finish grade. 23
  9. Page 26 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 26 of 67 Eversource | CT Information & Requirements 2024 Permanent Manufactured Meter Pedestal FRONT Customer Disconnect REAR Approx. 5 ft. Driven Ground Rod Pad mount sleeve must be used to mount to pedestal Finished Grade 24" Caution tape supplied and installed by Customer 12" Footing NOTES 1. This applies to single phase 120/240 volt services only. 2. Refer to approved meter socket list located at eversource.com. 3. Company shall provide service conductors to line side of meter socket. 4. Customer shall provide, own, and maintain approved conduit, load side conductors from the meter, and main disconnect. 5. Customer shall install 3 inch minimum schedule 40 PVC conduit. 6. The footing shall be a minimum of 8 inches in diameter with a depth no less than 4 feet, filled with concrete from bottom of hole to just above finish grade. 7. Customer provided caution tape shall be red plastic with black lettering. The warning message on the red plastic caution tape shall read: CAUTION – ELECTRICAL LINE BURIED BELOW. 24
  10. Page 27 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 27 of 67 Eversource | CT Information & Requirements 2024 Permanent Multi-Gang Meter Pedestal (Includes Cell Cites) Approved group with individual barriers Min. 3 in galvanized steel pipe with end cap Disconnect with overcurrent protection needed on groups of meters over 6 12 gauge galvanized steel "U" channel 6 ft. max. Caution tape supplied and installed by Customer 2 ft. min. Finished Grade 4 ft. min. set in concrete from base of pole to just above ground 24" 12" Service conductors 3 in. min. slip joint with one clamp 12" 90 degree bend 24 in. min. radius electrical grade Schedule 40 PVC NOTES 1. A Company approved meter and equipment location is required prior to the start of customer construction. 2. Meter equipment shall be located outside of secured or enclosed areas. 3. All network 208Y/120 volt services and 480Y/277 volt services shall be cold sequenced. 4. Main disconnect shall be service rated for the appropriate AIC (ampere interrupting capacity). 5. Three phase 480Y/277 volt services shall be individually cold sequenced per each meter position. 6. Refer to Metering for labeling requirements. All meter labeling shall be in place as per requirements prior to meter installation. 7. Customer shall install 3 inch minimum schedule 40 PVC conduit for service conductors. 8. Footing shall be a minimum of 8 inches in diameter with a depth no less than 4 feet, filled with concrete from bottom of hole to just above finish grade. 9. Customer provided caution tape shall be red plastic with black lettering. The warning message on the red plastic caution tape shall read: CAUTION – ELECTRICAL LINE BURIED BELOW. 10. Bollards are required when there is a potential for damage by vehicles. Refer to Metering for required clearances. 25

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)