Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

  1. Page 28 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 28 of 67 Eversource | CT Information & Requirements 2024 Remote Communications Power Site - Typical Company approved meter socket 6" Meter height Approx. 5 ft Structural concrete pad Driven Ground rod 3 in. diameter steel conduit cast integral with the pad NOTES 1. Company approval required prior to construction or installation. 2. A slip joint is not required when the steel conduit is integrated with the concrete pad. 26
  2. Page 29 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 29 of 67 Eversource | CT Information & Requirements 2024 Self-Contained Meter Socket Sequence and Mounting Arrangement Conduit service Utility/Line Utility/Line Load Load 16" 22" Approx. 5 ft Load Finished Grade Utility/ Line NOTES 1. Network and 480Y/277 volt services require a main disconnect ahead of the meter (cold sequence). 2. Self-contained meter sockets are required. Refer to Article 611. 3. Meter socket shall be located outside. For required meter clearances, refer to Electric Equipment Ownership and Required Meter Clearances. 4. The grounding electrode conductor shall not run through the meter socket. Refer to Hot and Cold Sequence Metering. 5. Overhead meter socket requires a weatherproof hub. 6. Slip joint for conduit service shall be installed on the left side of the meter socket only. 27
  3. Page 30 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 30 of 67 Eversource | CT Information & Requirements 2024 Service Mast Service weatherhead Service mast 2 in. min. galvanized steel conduit or 2-1/2 in. min. aluminum conduit unless supported by guys or braces Reinforced service clevis to be provided by Customer Service drop furnished, installed, owned, and maintained by the Company (maximum 1/0 triplex) 2-1/2 ft. max. 4 ft. min. All facilities, except meter, beyond this point furnished, installed, owned and maintained by Customer. Allow sufficient conductor (20") to form drip loops 10 ft. min. above ground to drip loop Lag or bolt into stud Minimum one conduit hanger Finished Grade 12 ft. min. above ground to service drop Conduit to meter socket NOTES 1. Only electric service drop conductors shall be attached to service mast. No telephone, cable, or other conductors allowed. 28
  4. Page 31 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 31 of 67 Eversource | CT Information & Requirements 2024 Single Phase Self Contained Metering Connections Line/Utility Line/Utility Approved lever bypass Approved lever bypass N N Load Single-phase, 3-wire 4 terminal meter socket Load Single-phase, 3-wire 5 terminal meter socket NOTES 1. Refer to approved meter socket list located on eversource.com. 2. When using the fifth terminal kit it shall be the same manufacturer as the meter socket and installed per manufacturer instructions in the 9 o’clock position. 3. When a cold sequence disconnect is required, it shall be within 3 feet of the meter socket. 4. Any new or upgraded service (200 amps or less) in the downtown network area in Hartford shall have a 5 terminal meter socket installed even with a 120/240 volt service. 5. For Company 120/208 volt underground network areas, consult with the Company. 6. Refer to Article 611 for Company allowed single phase services. 29
  5. Page 32 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 32 of 67 Eversource | CT Information & Requirements 2024 Temporary Electric Service - Conduit System Temp service shall be mounted on a temporary structure not on a building 7 ft. Approx. 5 ft. Handhole/ Transformer pad Caution tape supplied and installed by Customer 10 ft. min. Finished Grade 24" min/ 36" max 3 ft. 12" 10 ft. max. NOTES 1. A temporary electric service shall be in service no longer than one year. 2. The Company shall install conductors for a customer erected temporary electric service that meets the requirements included here. 3. Location of the temporary service pole shall be specified by the Company. 4. Timber shall be structural grade fir or pine with cross section not less than nominal solid 6 inch x 6 inch or 2 inch by 6 inch spiked together on 8 inch centers. 5. Temporary service timber is to be at least 10 feet long and set a minimum of 3 feet in firm ground with well tampered backfill. 6. There shall be no excavation near the temporary service timber which may reduce its stability. 7. A Company approved manual lever operation bypass meter socket is to be installed approximately 5 feet above ground. 8. Outdoor type service equipment rating must be installed on the load side of the meter socket and within 12 feet of an approved meter socket with ground fault interrupter protection. 30
  6. Page 33 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 33 of 67 Eversource | CT Information & Requirements 2024 Temporary Electric Service - Conduit System continued Temp service shall be mounted on a temporary structure not on a building 7 ft. Approx. 5 ft. Handhole/ Transformer pad Caution tape supplied and installed by Customer 10 ft. min. Finished Grade 24" min/ 36" max 3 ft. 12" 10 ft. max. NOTES 9. Electrical grade schedule 40 PVC conduit shall be supplied by the Customer. 10. Conduit will be listed and labeled for direct burial and above ground use. 11. Pipe strap or clamp and minimum 3 inch slip joint required. 12. Customer provided caution tape shall be red plastic with black lettering. The warning message on the red plastic caution tape shall read: CAUTION – ELECTRICAL LINE BURIED BELOW. 13. Opening existing electrical structures such as handholds, transformer pads or switch vaults, when installing the pulling line is prohibited. 14. Suitable backfill shall not contain ash, cinder, shell, frozen material, loose debris, or stones larger than 2 inch maximum dimension. 15. All conduit shall be inspected by the local municipal authority prior to backfilling. 31
  7. Page 34 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 34 of 67 Eversource | CT Information & Requirements 2024 Temporary Electric Service - Overhead System 12" 12 5f t. m ax . to po le 12 ft. min. 16 ft. min. 12" 20 ft. min. 2" x 4" Approx. 5 ft. 6f 4 ft. min. 3' minimum in length with minimum 2' below grade 2" x 4" t. m in. Finished grade Driven Ground Rod NOTES 1. A temporary electric service shall be in service no longer than one year. 2. There are additional charges if the service drop will not be transferred to a permanent location. 3. The Company shall dead end its service drop for temporary service on a pole or timber to be erected by the Customer that meets the requirements included here. 4. The location of the temporary service pole or timber shall be specified by the Company and not exceed 125 feet measured from the Company pole to the Customer pole. 5. The timber shall be structural grade fir or pine with cross section not less than nominal solid 6 inch x 6 inch or 2 inch x 6 inch spiked together on 8 inch centers (one solid piece of wood) to be 20 feet minimum. 6. Additional length may be required in order to provide a 16 foot service drop clearance over finish grade of 16 feet minimum. 7. The temporary service pole or timber is to be set a minimum of 4 feet in firm ground with well tampered backfill. 32
  8. Page 35 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 35 of 67 Eversource | CT Information & Requirements 2024 Temporary Electric Service - Overhead System continued 12" 12 5f t. m ax . to po le 12 ft. min. 16 ft. min. 12" 20 ft. min. 2" x 4" Approx. 5 ft. 6f 4 ft. min. 3' minimum in length with minimum 2' below grade 2" x 4" t. m in. Finished grade Driven Ground Rod NOTES 8. The temporary service pole or timber is to be adequately braced to support at its top both a man on a ladder and a service drop tension of 600 pounds. A minimum of two 2 inch by 4 inch braces at right angles to each other with one in line with the service drop shall be installed. 9. Braces are to be well spiked flat against the side of the pole at least 12 feet above ground and to solidly driven 2 inch by 4 inch stakes 3 feet minimum located a minimum of 6 feet from the service pole. 10. There shall be no excavation near the temporary service pole or its braces which may reduce stability. 11. A weatherhead is to be installed approximately 12 inches from top of pole and 14 feet minimum above ground. 12. An approved manual lever operated bypass meter socket is to be installed. No grounding electrode conductor shall be run in the meter socket. 33
  9. Page 36 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 36 of 67 Eversource | CT Information & Requirements 2024 Three Phase Self Contained Metering Connections Line/Utility N Load Three-phase, 4-wire 7 terminal meter socket Approved lever bypass NOTES 1. Refer to approved meter sockets list located at eversource.com. 2. The grounding electrode conductor connection shall be made at an accessible location in the service equipment, and not in or through the meter socket. 3. All three phase network 120/208 or 277/480 volts shall have a main disconnect with over current protection ahead of the meter (cold sequence). • Neutral isolation shall be installed for all cold sequence metering. • The disconnect shall be on the same wall and no greater than 3 feet from the meter socket. • The main disconnect shall be service rated for the appropriate AIC (ampere interrupting capacity). 34
  10. Page 37 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 37 of 67 Eversource | CT Information & Requirements 2024 Transfer Switch Installation in Conjunction with Auxiliary Supply Line/Utility Overhead Setup Transfer Switch Meter Socket Disconnect Load Auxiliary supply from generator/battery storage Underground Setup Meter Socket Disconnect Transfer Switch Load Line/Utility Auxiliary supply from generator/battery storage NOTES 1. Break before make type transfer switch is required. 2. There shall be no splices inside the meter socket. 3. Meter socket shall not be used as a race way. Conductors for load must be fed through a separate conduit and not through the meter socket. 4. Customer auxiliary wiring shall not terminate in or travel through the meter socket. 35

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)