Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

  1. Page 31 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 31 of 67 Eversource | CT Information & Requirements 2024 Single Phase Self Contained Metering Connections Line/Utility Line/Utility Approved lever bypass Approved lever bypass N N Load Single-phase, 3-wire 4 terminal meter socket Load Single-phase, 3-wire 5 terminal meter socket NOTES 1. Refer to approved meter socket list located on eversource.com. 2. When using the fifth terminal kit it shall be the same manufacturer as the meter socket and installed per manufacturer instructions in the 9 o’clock position. 3. When a cold sequence disconnect is required, it shall be within 3 feet of the meter socket. 4. Any new or upgraded service (200 amps or less) in the downtown network area in Hartford shall have a 5 terminal meter socket installed even with a 120/240 volt service. 5. For Company 120/208 volt underground network areas, consult with the Company. 6. Refer to Article 611 for Company allowed single phase services. 29
  2. Page 32 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 32 of 67 Eversource | CT Information & Requirements 2024 Temporary Electric Service - Conduit System Temp service shall be mounted on a temporary structure not on a building 7 ft. Approx. 5 ft. Handhole/ Transformer pad Caution tape supplied and installed by Customer 10 ft. min. Finished Grade 24" min/ 36" max 3 ft. 12" 10 ft. max. NOTES 1. A temporary electric service shall be in service no longer than one year. 2. The Company shall install conductors for a customer erected temporary electric service that meets the requirements included here. 3. Location of the temporary service pole shall be specified by the Company. 4. Timber shall be structural grade fir or pine with cross section not less than nominal solid 6 inch x 6 inch or 2 inch by 6 inch spiked together on 8 inch centers. 5. Temporary service timber is to be at least 10 feet long and set a minimum of 3 feet in firm ground with well tampered backfill. 6. There shall be no excavation near the temporary service timber which may reduce its stability. 7. A Company approved manual lever operation bypass meter socket is to be installed approximately 5 feet above ground. 8. Outdoor type service equipment rating must be installed on the load side of the meter socket and within 12 feet of an approved meter socket with ground fault interrupter protection. 30
  3. Page 33 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 33 of 67 Eversource | CT Information & Requirements 2024 Temporary Electric Service - Conduit System continued Temp service shall be mounted on a temporary structure not on a building 7 ft. Approx. 5 ft. Handhole/ Transformer pad Caution tape supplied and installed by Customer 10 ft. min. Finished Grade 24" min/ 36" max 3 ft. 12" 10 ft. max. NOTES 9. Electrical grade schedule 40 PVC conduit shall be supplied by the Customer. 10. Conduit will be listed and labeled for direct burial and above ground use. 11. Pipe strap or clamp and minimum 3 inch slip joint required. 12. Customer provided caution tape shall be red plastic with black lettering. The warning message on the red plastic caution tape shall read: CAUTION – ELECTRICAL LINE BURIED BELOW. 13. Opening existing electrical structures such as handholds, transformer pads or switch vaults, when installing the pulling line is prohibited. 14. Suitable backfill shall not contain ash, cinder, shell, frozen material, loose debris, or stones larger than 2 inch maximum dimension. 15. All conduit shall be inspected by the local municipal authority prior to backfilling. 31
  4. Page 34 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 34 of 67 Eversource | CT Information & Requirements 2024 Temporary Electric Service - Overhead System 12" 12 5f t. m ax . to po le 12 ft. min. 16 ft. min. 12" 20 ft. min. 2" x 4" Approx. 5 ft. 6f 4 ft. min. 3' minimum in length with minimum 2' below grade 2" x 4" t. m in. Finished grade Driven Ground Rod NOTES 1. A temporary electric service shall be in service no longer than one year. 2. There are additional charges if the service drop will not be transferred to a permanent location. 3. The Company shall dead end its service drop for temporary service on a pole or timber to be erected by the Customer that meets the requirements included here. 4. The location of the temporary service pole or timber shall be specified by the Company and not exceed 125 feet measured from the Company pole to the Customer pole. 5. The timber shall be structural grade fir or pine with cross section not less than nominal solid 6 inch x 6 inch or 2 inch x 6 inch spiked together on 8 inch centers (one solid piece of wood) to be 20 feet minimum. 6. Additional length may be required in order to provide a 16 foot service drop clearance over finish grade of 16 feet minimum. 7. The temporary service pole or timber is to be set a minimum of 4 feet in firm ground with well tampered backfill. 32
  5. Page 35 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 35 of 67 Eversource | CT Information & Requirements 2024 Temporary Electric Service - Overhead System continued 12" 12 5f t. m ax . to po le 12 ft. min. 16 ft. min. 12" 20 ft. min. 2" x 4" Approx. 5 ft. 6f 4 ft. min. 3' minimum in length with minimum 2' below grade 2" x 4" t. m in. Finished grade Driven Ground Rod NOTES 8. The temporary service pole or timber is to be adequately braced to support at its top both a man on a ladder and a service drop tension of 600 pounds. A minimum of two 2 inch by 4 inch braces at right angles to each other with one in line with the service drop shall be installed. 9. Braces are to be well spiked flat against the side of the pole at least 12 feet above ground and to solidly driven 2 inch by 4 inch stakes 3 feet minimum located a minimum of 6 feet from the service pole. 10. There shall be no excavation near the temporary service pole or its braces which may reduce stability. 11. A weatherhead is to be installed approximately 12 inches from top of pole and 14 feet minimum above ground. 12. An approved manual lever operated bypass meter socket is to be installed. No grounding electrode conductor shall be run in the meter socket. 33
  6. Page 36 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 36 of 67 Eversource | CT Information & Requirements 2024 Three Phase Self Contained Metering Connections Line/Utility N Load Three-phase, 4-wire 7 terminal meter socket Approved lever bypass NOTES 1. Refer to approved meter sockets list located at eversource.com. 2. The grounding electrode conductor connection shall be made at an accessible location in the service equipment, and not in or through the meter socket. 3. All three phase network 120/208 or 277/480 volts shall have a main disconnect with over current protection ahead of the meter (cold sequence). • Neutral isolation shall be installed for all cold sequence metering. • The disconnect shall be on the same wall and no greater than 3 feet from the meter socket. • The main disconnect shall be service rated for the appropriate AIC (ampere interrupting capacity). 34
  7. Page 37 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 37 of 67 Eversource | CT Information & Requirements 2024 Transfer Switch Installation in Conjunction with Auxiliary Supply Line/Utility Overhead Setup Transfer Switch Meter Socket Disconnect Load Auxiliary supply from generator/battery storage Underground Setup Meter Socket Disconnect Transfer Switch Load Line/Utility Auxiliary supply from generator/battery storage NOTES 1. Break before make type transfer switch is required. 2. There shall be no splices inside the meter socket. 3. Meter socket shall not be used as a race way. Conductors for load must be fed through a separate conduit and not through the meter socket. 4. Customer auxiliary wiring shall not terminate in or travel through the meter socket. 35
  8. Page 38 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 38 of 67 Eversource | CT Information & Requirements 2024 Trenching Requirements for Service or Secondary Line Finished grade Caution tape supplied and installed by Customer Suitable backfill 24" 12" Conduit depth to finish grade 24 in. min./36 in. max. 3 in. min. conduit NOTES 1. Trench shall not be installed over septic tanks or fields and shall maintain 2 feet of clearance from septic lines, and 5 feet of clearance from septic fields. 2. Electrical grade schedule 40 PVC conduit shall be sunlight resistant and suitable for direct buried and above ground use. 3. Horizontal clearance from other utilities shall be 12 inches minimum or more, as necessary to permit access for maintenance and without damage to other utilities. 4. Vertical crossing clearance shall be constructed and supported to ensure the upper facility will not transfer harmful load onto any lower facility. There shall be adequate vertical clearance to permit access for maintenance of all facilities without damage. In general, 12 inches is considered adequate separation. 5. Fuel (gas and oil) and water lines shall be no closer than 18 inches in all directions. 6. Customer provided caution tape shall be red plastic with black lettering. The warning message on the red plastic caution tape shall read: CAUTION – ELECTRICAL LINE BURIED BELOW. 7. Suitable backfill shall not contain ash, cinder, shell, frozen material, loose debris, or stones larger than 2 inch maximum dimension. 8. All service conduit shall be inspected by the local municipal authority prior to backfilling. 36
  9. Page 39 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 39 of 67 Eversource | CT Information & Requirements 2024 Article 100-104 | Section 1 — General Information 100. These requirements have been developed to ensure reliable and adequate service to the user of electricity and to improve communication and coordination between Customers, Contractors, Architects, Engineers, Civic Planning Groups, and the Company. These requirements supplement the Company’s New Business Polices and Tariff and contain the most recent revisions (at the time of publishing) to the Company’s Construction and Meter Standards. 101. The character of electric service made available in accordance with rate provisions will differ to some extent from one location to another on the Company’s system. Customers, Contractors, Architects, Engineers, and Civic Planning Groups should therefore determine from the Company the types of service available for any new installation and for any existing installation which is to be enlarged or modified. 102. It is impractical to attempt to cover in a booklet of this type all Company approved standards or all of the conditions and problems which may be encountered in various installations. Accordingly, Customers, Contractors, Architects, Engineers, and Civic Planning Groups are strongly urged to make use of the advisory services available through the Company without charge or obligation. Electric distribution system design services and meter design services after the initial design (i.e., redesign at a Customer’s request or due to municipal requirements), and inspections after a failed inspection may be billed to the Customer, unless the failed inspection was caused by the Company design. 103. With respect to Customer’s wiring and electrical installations, no requirement, interpretation, or standard specified in this booklet is intended to supersede or conflict with the standards and regulations of the National Electrical Code, or with any state or municipal law, rule, or ordinance now in force or hereafter enacted or promulgated. The Company shall have no obligation to determine whether or not the Customer’s wiring and electrical installations are proper and safe or comply with the National Electrical Safety Code or any other code or regulation in effect at the Customer’s location. However, if it should come to the Company’s attention that the Customer’s wiring and electrical installations are not proper and safe, or do not comply with such codes, the Company shall have the right to refuse or discontinue service. In all municipalities which require permits and/or certificates of inspection for electrical work, it shall be the responsibility of the Customer or Contractor to obtain such documents from the proper authorities and provide copies to the Company before electric service is provided. The Company will not energize a service until it is approved by the local municipal authority, and it meets the requirements of this booklet. 104. Safe and adequate access shall be maintained to Company owned equipment located on a Customer’s premises. The Company shall have free right to enter the Customer’s premises to enable the Company to install, read, inspect, repair, remove, replace, disconnect, or otherwise maintain its meters, equipment, facilities, and for all other proper purposes. The access area must be clear of obstacles and capable of carrying heavy vehicles and equipment if required. The Company is not responsible for restoring trees, shrubs, and/or grass if damage is caused due to inadequate access. The Customer, if a tenant, shall authorize and request the landlord to permit the Company to enter said premises. If safe and adequate access to the meter is not available for the Company’s employees, the Company reserves the right to discontinue service upon proper notice. The Customer shall not permit access to the Company’s meters, equipment, and facilities located on the premises by other than an authorized representative of the Company or of the Public Utilities Regulatory Authority. In case of loss or damage to Company property on the Customer’s premises due to Customer negligence, the Customer shall pay to the Company the value of such property or the cost of repairs. 37
  10. Page 40 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 40 of 67 Eversource | CT Information & Requirements 2024 Article 105-112 | Section 1 — General Information 105. All employees authorized by the Company to visit the Customer’s premises are required to carry means of identification which will be shown upon request. The Company will be responsible for the actions and workmanship of such employees. 106. Should the use or operation of any equipment by a customer including but not limited to electric motors, welders, electronic power supplies, speed controls, or distributed generation adversely affect the Company’s ability to render adequate service to others, the Company reserves the right to discontinue service until suitable corrections are made by the Customer. 107. The Company reserves the right to install protective apparatus so arranged as to disconnect or limit service to the Customer if the Company’s capability to render service at the point of delivery is exceeded. 108. The Company will make or cause to be made, application for any necessary street permits or licenses for its facilities and will not be required to make electricity available on the premises of the Customer until a reasonable time after such permits or licenses are granted. Construction of lines on or across private property will be done only if the Customer provides, without expense or cost to the Company, the necessary permits, easements, and consents for a satisfactory right-of-way for the erection, maintenance, and operation of a line to be used exclusively to serve the Customer. The Customer shall also be responsible for any on-going fees associated with any required permits or consents for rights-of-way located on or across private property. All Company owned equipment located on private property such as poles, conductors, meters, instrument transformers, auxiliary metering equipment, transformers, ducts, etc., shall remain Company property and may be removed by the Company in the event such equipment is no longer needed. The Company shall be responsible for the construction and maintenance of all electric distribution facilities to serve the customer’s premises, as specified in the Company’s Tariff. 109. The actual cost to the Company for moving meters and services shall be billed to the Customer in the following cases: (a) If a meter or service is relocated on the same premises at the request of the Customer. (b) If a meter or service is discontinued or removed temporarily at the request or for the convenience of the Customer. (c) When the cost of covering, instead of moving or temporarily removing a service exceeds 1 crew hour, the excess cost to the Company shall be billed to the Customer. 110. The cost of installing and removing a temporary overhead or underground service, which is not converted to a permanent service, shall be billed to the Customer. 111. The distribution and meter standards included in this booklet are not all inclusive of Company standards. Because distribution and meter standards are revised periodically and are subject to Article 103, the standards in this booklet may be obsolete. Any person who is uncertain or has a question as to the latest standard applicable should Contact Us at the Electric Service Support Center. 112. Installation of oil filled equipment within 400 feet of public or community water systems are subject to special requirements. Customers, Contractors, Architects, Engineers, and Civic Planning Groups should determine from the Company the requirements applicable to any new installations and for any existing installation which is to be enlarged or modified. The Company’s requirements were developed based on Connecticut Department of Environmental Services rules. Excess costs for the associated equipment shall be billed to the Customer. Consult with a Company representative prior to starting projects with impacts in environmentally sensitive locations. 38

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026