Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

  1. Page 38 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 38 of 67 Eversource | CT Information & Requirements 2024 Trenching Requirements for Service or Secondary Line Finished grade Caution tape supplied and installed by Customer Suitable backfill 24" 12" Conduit depth to finish grade 24 in. min./36 in. max. 3 in. min. conduit NOTES 1. Trench shall not be installed over septic tanks or fields and shall maintain 2 feet of clearance from septic lines, and 5 feet of clearance from septic fields. 2. Electrical grade schedule 40 PVC conduit shall be sunlight resistant and suitable for direct buried and above ground use. 3. Horizontal clearance from other utilities shall be 12 inches minimum or more, as necessary to permit access for maintenance and without damage to other utilities. 4. Vertical crossing clearance shall be constructed and supported to ensure the upper facility will not transfer harmful load onto any lower facility. There shall be adequate vertical clearance to permit access for maintenance of all facilities without damage. In general, 12 inches is considered adequate separation. 5. Fuel (gas and oil) and water lines shall be no closer than 18 inches in all directions. 6. Customer provided caution tape shall be red plastic with black lettering. The warning message on the red plastic caution tape shall read: CAUTION – ELECTRICAL LINE BURIED BELOW. 7. Suitable backfill shall not contain ash, cinder, shell, frozen material, loose debris, or stones larger than 2 inch maximum dimension. 8. All service conduit shall be inspected by the local municipal authority prior to backfilling. 36
  2. Page 39 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 39 of 67 Eversource | CT Information & Requirements 2024 Article 100-104 | Section 1 — General Information 100. These requirements have been developed to ensure reliable and adequate service to the user of electricity and to improve communication and coordination between Customers, Contractors, Architects, Engineers, Civic Planning Groups, and the Company. These requirements supplement the Company’s New Business Polices and Tariff and contain the most recent revisions (at the time of publishing) to the Company’s Construction and Meter Standards. 101. The character of electric service made available in accordance with rate provisions will differ to some extent from one location to another on the Company’s system. Customers, Contractors, Architects, Engineers, and Civic Planning Groups should therefore determine from the Company the types of service available for any new installation and for any existing installation which is to be enlarged or modified. 102. It is impractical to attempt to cover in a booklet of this type all Company approved standards or all of the conditions and problems which may be encountered in various installations. Accordingly, Customers, Contractors, Architects, Engineers, and Civic Planning Groups are strongly urged to make use of the advisory services available through the Company without charge or obligation. Electric distribution system design services and meter design services after the initial design (i.e., redesign at a Customer’s request or due to municipal requirements), and inspections after a failed inspection may be billed to the Customer, unless the failed inspection was caused by the Company design. 103. With respect to Customer’s wiring and electrical installations, no requirement, interpretation, or standard specified in this booklet is intended to supersede or conflict with the standards and regulations of the National Electrical Code, or with any state or municipal law, rule, or ordinance now in force or hereafter enacted or promulgated. The Company shall have no obligation to determine whether or not the Customer’s wiring and electrical installations are proper and safe or comply with the National Electrical Safety Code or any other code or regulation in effect at the Customer’s location. However, if it should come to the Company’s attention that the Customer’s wiring and electrical installations are not proper and safe, or do not comply with such codes, the Company shall have the right to refuse or discontinue service. In all municipalities which require permits and/or certificates of inspection for electrical work, it shall be the responsibility of the Customer or Contractor to obtain such documents from the proper authorities and provide copies to the Company before electric service is provided. The Company will not energize a service until it is approved by the local municipal authority, and it meets the requirements of this booklet. 104. Safe and adequate access shall be maintained to Company owned equipment located on a Customer’s premises. The Company shall have free right to enter the Customer’s premises to enable the Company to install, read, inspect, repair, remove, replace, disconnect, or otherwise maintain its meters, equipment, facilities, and for all other proper purposes. The access area must be clear of obstacles and capable of carrying heavy vehicles and equipment if required. The Company is not responsible for restoring trees, shrubs, and/or grass if damage is caused due to inadequate access. The Customer, if a tenant, shall authorize and request the landlord to permit the Company to enter said premises. If safe and adequate access to the meter is not available for the Company’s employees, the Company reserves the right to discontinue service upon proper notice. The Customer shall not permit access to the Company’s meters, equipment, and facilities located on the premises by other than an authorized representative of the Company or of the Public Utilities Regulatory Authority. In case of loss or damage to Company property on the Customer’s premises due to Customer negligence, the Customer shall pay to the Company the value of such property or the cost of repairs. 37
  3. Page 40 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 40 of 67 Eversource | CT Information & Requirements 2024 Article 105-112 | Section 1 — General Information 105. All employees authorized by the Company to visit the Customer’s premises are required to carry means of identification which will be shown upon request. The Company will be responsible for the actions and workmanship of such employees. 106. Should the use or operation of any equipment by a customer including but not limited to electric motors, welders, electronic power supplies, speed controls, or distributed generation adversely affect the Company’s ability to render adequate service to others, the Company reserves the right to discontinue service until suitable corrections are made by the Customer. 107. The Company reserves the right to install protective apparatus so arranged as to disconnect or limit service to the Customer if the Company’s capability to render service at the point of delivery is exceeded. 108. The Company will make or cause to be made, application for any necessary street permits or licenses for its facilities and will not be required to make electricity available on the premises of the Customer until a reasonable time after such permits or licenses are granted. Construction of lines on or across private property will be done only if the Customer provides, without expense or cost to the Company, the necessary permits, easements, and consents for a satisfactory right-of-way for the erection, maintenance, and operation of a line to be used exclusively to serve the Customer. The Customer shall also be responsible for any on-going fees associated with any required permits or consents for rights-of-way located on or across private property. All Company owned equipment located on private property such as poles, conductors, meters, instrument transformers, auxiliary metering equipment, transformers, ducts, etc., shall remain Company property and may be removed by the Company in the event such equipment is no longer needed. The Company shall be responsible for the construction and maintenance of all electric distribution facilities to serve the customer’s premises, as specified in the Company’s Tariff. 109. The actual cost to the Company for moving meters and services shall be billed to the Customer in the following cases: (a) If a meter or service is relocated on the same premises at the request of the Customer. (b) If a meter or service is discontinued or removed temporarily at the request or for the convenience of the Customer. (c) When the cost of covering, instead of moving or temporarily removing a service exceeds 1 crew hour, the excess cost to the Company shall be billed to the Customer. 110. The cost of installing and removing a temporary overhead or underground service, which is not converted to a permanent service, shall be billed to the Customer. 111. The distribution and meter standards included in this booklet are not all inclusive of Company standards. Because distribution and meter standards are revised periodically and are subject to Article 103, the standards in this booklet may be obsolete. Any person who is uncertain or has a question as to the latest standard applicable should Contact Us at the Electric Service Support Center. 112. Installation of oil filled equipment within 400 feet of public or community water systems are subject to special requirements. Customers, Contractors, Architects, Engineers, and Civic Planning Groups should determine from the Company the requirements applicable to any new installations and for any existing installation which is to be enlarged or modified. The Company’s requirements were developed based on Connecticut Department of Environmental Services rules. Excess costs for the associated equipment shall be billed to the Customer. Consult with a Company representative prior to starting projects with impacts in environmentally sensitive locations. 38
  4. Page 41 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 41 of 67 Eversource | CT Information & Requirements 2024 Article 113-125 | Section 1 — General Information 113. When changes, alterations, or additions to an existing building structure affect the attachment of service entrance equipment, the attachment point and installation, the changes must conform to the current requirements outlined in this booklet and applicable codes. No structures such as decks, sidewalks, or swimming pools shall be constructed over buried service equipment. 114. Connecticut State Law allows homeowners to perform electrical work on a single family, owneroccupied residence only. Homeowners have two options to complete work. Refer to Residential Cut and Reconnect Policy. 115. The purpose of Company inspections is to ensure Company requirements outlined in this booklet are met. Company inspections of customer facilities or wiring is not an approval of conformance to applicable codes. 116. Connecticut General Statutes prohibit theft of electric service. Theft of electrical service is defined as the taking or acceptance of electric service without the knowledge or consent of the Company. This includes any method or device used by any person(s) which prevents an electric meter from accurately registering the quantity of electricity supplied by the Company. Theft of electric service is unlawful, unsafe, and can result in serious injuries, electrocution, fires, explosions, and death. Where there is evidence of meter tampering and/or diversion of electric service, such person, or persons responsible shall be liable for criminal prosecution under the penalty of all applicable laws. All lost revenue, intended or unintended, is subject to recovery by the Company. To report suspected meter tampering or diversion of electric service, call the Company confidential energy theft hotline at [phone removed]. Callers will not be asked to identify themselves. 117. Connecticut State Law House Bill 6292 is an act ensuring the safety of vacant buildings. The Company shall abide by House Bill to resume delivery of electricity at locations where the circumstances apply. Refer to the State of Connecticut House Bill No. 6292. Public Act No. 03-214. 118. An electric service request shall be submitted for any new, relocated, upgraded, changed, removed or temporary service, including load data prior to starting the work. The service request process provides a method for responding to and processing requests in advance to allow for proper planning. 119. To initiate a service request, check on the status of an existing request, and obtain additional information, visit eversource.com or Contact Us at the Electric Service Support Center. 120. When a service request is received, the Company will determine the type of service based on the location, size, and character of the proposed load. 121. When a service request is received, the Company will designate an approved outside service location. New service locations are typically on the front of the building and on the side adjacent to Company’s distribution facilities. 122. When a service request is received, the Company will specify the location and requirements for metering equipment. Refer to Metering. 123. When a service request is received, the Company will advise of any advance charges and customer contributions. 124. When a service request is received, the Company will provide available fault current for the specific installation. 125. When a service request is received, the Company will advise of any special requirements. 39
  5. Page 42 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 42 of 67 Eversource | CT Information & Requirements 2024 Article 126-137 | Section 1 — General Information 126. Service installation requests involving special conditions due to size of load, physical limitations, rate application, environmental considerations, or other special requirements shall be subject to review and agreement with the Company. 127. Attachment of non-Company equipment to Company owned poles is generally not allowed. Requests to install non-Company equipment to a Company owned pole such as cameras, speed limit signs, lights, or sensors require a service request, Company review, and approval. When required, coordination with telephone, cable, or other utilities is the customer’s responsibility. 128. Normally, only one service will be installed to a single building or structure. 129. Multiple services of the same voltage to one building or structure will not be permitted without written approval from the local municipal authority having jurisdiction. 130. Each service will be separately metered and will be billed as serving a separate customer under the appropriate rate. 131. The Company or its agents shall install, operate, and maintain all Company owned equipment. 132. The Company will not maintain or operate customer owned equipment. 133. With the exception of jobs that meet the Residential Cut and Reconnect Policy criteria, all connections and disconnections between Company owned facilities and Customer owned facilities shall be performed by the Company or its agents. 134. With sufficient advance notice, the Company will temporarily disconnect an overhead or underground service to allow for maintenance work on the load side of the service. Customer billing may apply. 135. The Company will temporarily disconnect a service at no charge to allow for siding, painting, or tree removal work. Contact Us at the Electric Service Support Center to schedule an appointment. Customer billing may apply for requests that fall outside of normal business hours. 136. The Company will remove electrical facilities once the Removal of Service Building Demolition or Construction form is received in usable format from the property owner, as per Connecticut State law. The building owner is responsible for providing the Company with safe access. If the property includes separately metered tenants, the form shall be notarized. The form is available at eversource.com or Contact Us at the Electric Service Support Center. 137. A “repair”, emergency or non-emergency, that involves the replacement of service equipment is considered a change and requires a service request, permit, and any required municipal inspection. This includes the meter socket, service entrance conductors, conduit, and mast. If an emergency arises after business hours, weekends, or holidays it is permissible to perform repairs or replacement however, the electrical contractor must initiate a service request and obtain a municipal inspection within 10 business days. 40
  6. Page 43 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 43 of 67 Eversource | CT Information & Requirements 2024 Section 2 — Residential Cut and Reconnect Policy The Residential Cut and Reconnect Policy is restricted to two-wire 120 volt, three-wire 120/240 volt or three-wire 120/208 volt single-phase overhead residential services of 400 amps or less. Definitions Licensed Electrician - a Master electrician holding a valid E-1 or E-9 license issued by the State of Connecticut. Department of Consumer Protection - Occupational & Professional Licensing Division. The Licensed Electrician (hereinafter referred to as the electrician) is responsible for all work performed under this policy. E-2 License - an E-2 license holder can only perform electrical work while under the employ of a contractor licensed for such work. E-9 License - an E-9 license-holder is restricted to residential and light commercial work only. Authority Having Jurisdiction – a duly appointed building code official (formerly referred to as Local Municipal Authority), responsible for inspecting and ensuring that electrical contractor work is complying with all applicable local, State and Federal regulations. Self-Contained Meter - a meter capable of measuring the entire amperage of the electric service without the use of current and/or voltage transformers. Policy 1. Homeowners are not authorized to cut and reconnect electric services. • Refer to General Information, Article 114. • If a permit has been issued to a homeowner, an electrician is not allowed to perform any electrical work, including the Cut and Reconnect of the service. 2. If a permit has been issued to an electrician, the State-approved Residential Cut and Reconnect policy must be abided by. All electricians who hold a valid State of Connecticut E-1 or E-9 license are permitted to perform cut and reconnect services as outline within this policy. To maintain this privilege, all requirements of the Residential Cut and Reconnect policy must be strictly adhered to. Violations of the policy will result in termination of these privileges. 3. The electrician must contact the Company and obtain a valid service request number at least 15 days prior to starting work to avoid potential code violations or non-compliance with the Company’s requirements. 4. The electrician must obtain a valid service request number, either through the Eversource website (www.eversource.com) or by telephone ([phone removed]). a. The service request job description must indicate that the work involves a Residential Cut and Reconnect. b. The work must be completed within 60 days from the date of the service request. c. If an emergency arises outside of the Company’s business hours, weekends, or holidays, it is permissible to perform repairs or replacement of the service. However, the electrician must obtain a valid service request number from the Company and a municipal permit within 1 business day (as per State of Connecticut Building Code, Section R105.2.1 - Emergency Repairs). 41
  7. Page 44 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 44 of 67 Eversource | CT Information & Requirements 2024 Section 2 — Residential Cut and Reconnect Policy 5. The electrician shall cut the service entrance cable at the point of attachment (weatherhead) on the line side of the existing service drop connectors, replace or repair the service, and re-connect the service in compliance with the Company’s requirements. a. This work may be performed by an E-2 Journeyman or Apprentice working under the direct supervision of an E-1 or E-9 licensee. b. All applicable rules of the State of Connecticut Department of Consumer Protection Occupational & Professional Licensing Division apply. 6. If the point of attachment is going to be changed or there are existing clearance conflicts, the electrician must receive the Company’s approval prior to starting work. The service drop shall be relocated by the Company only. 7. The electrician is responsible for obtaining the appropriate permits from the Authority Having Jurisdiction in advance of starting work. 8. The electrician is responsible for taking all necessary steps to ensure the meter(s) are reinstalled into the same service location from which removed. Refer to Metering for additional details. a. For all multiple meter installations, each house, store, office, apartment, or area serviced must be permanently marked with its unique identification on the inside of each meter position and the outside of the cover of each associated meter socket and load disconnect for which the service is provided (to avoid erroneous customer billing conditions). b. Each meter and meter position should be marked with the unique identification for the location serviced prior to the start of any service work to ensure compliance with this requirement. 9. The service must be reconnected utilizing properly sized connectors as listed below. Phase/Hot Leg /Conductor: • Properly taped Parallel Groove Connector • Properly taped Pliers-applied Wedge Connector Neutral Conductor • Bare Parallel Groove Connector • Bare Pliers-applied Wedge Connector 10. Upon completion of the job, the electrician will be responsible for re-installing the meter into the new meter socket under the following conditions: a. The existing meter is appropriate for the new service when: • Upgrading from a 60-100A single phase, 3 wire service to a 100-200A single phase, 3-wire service. • Replacing 320A meter socket with a 320A meter socket. b. The meter has not been damaged either prior to or during the service upgrade. Note 1: Installation of a meter does not supersede the inspection requirements by the Authority Having Jurisdiction. Note 2: For multiple metering locations, the electrician shall reinstall the meter into the same service location from which it was removed (to avoid erroneous customer billing conditions). 42
  8. Page 45 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 45 of 67 Eversource | CT Information & Requirements 2024 Section 2 — Residential Cut and Reconnect Policy 11. If any conditions as stated in (a) or (b) above prevents the meter from being reinstalled or if a meter is not available to be installed, the electrician shall contact the Electric Service Support Center (1888-544-4826) within 1 business day to either make appropriate arrangements to install a meter or request permission to install Company approved jumpers and clear meter socket covers. Any type of commercially available jumper and clear meter socket cover designed for such use will be approved. The use of non-approved home-made jumpers shall be prohibited. 12. All Company requirements, the National Electrical Code (NEC), State and Municipal building requirements must be met. 13. The electrician is responsible for obtaining approval from the Authority Having Jurisdiction as soon as the work is completed. 14. Unless notified of a building code violation by the Authority Having Jurisdiction, the Company will either reseal or install a new meter. Non-Compliance and Violations 1. Non-compliance with any of the requirements of the Residential Cut and Reconnect Policy, noncompliance with NEC, OSHA, and State and local building codes will result in the Company sending a written inquiry to the electrician, customer, and the Authority Having Jurisdiction as necessary, to resolve the problem. 2. Repeated non-compliance violations by an electrician will result in notification to the appropriate State and Municipal authorities. 3. The electrician will be notified in writing that a violation letter has been sent and that their privilege to perform work under the Residential Cut and Reconnect Policy may be suspended. In the case where risk of public safety is a factor; the Company will immediately suspend Residential Cut and Reconnect privileges for said electrician. 4. The State of Connecticut Department of Consumer protection - Occupational & Professional Licensing Division will review violations to determine if Connecticut General Statute, Section 20334 has been violated and will take appropriate action, up to and including penalties as described in the Connecticut General Statute, Section 20-341. 5. The electrician will be billed for all costs that may be incurred by the Company to correct any violation. 43
  9. Page 46 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 46 of 67 Eversource | CT Information & Requirements 2024 Article 300-303 | Section 3 — Types of Electric Service 300. Line Extensions It is important to consult with the Company in advance for locations that will require a single or three-phase line extension along a town-maintained road, state highway, or into new residential developments, commercial complexes, or industrial parks. • Under certain circumstances customer charges apply. • In addition, there are specific policies for line extensions into new residential developments. 301. Primary/High Voltage Service Requirements for primary/high voltage service are not included in this booklet. Primary metering is normally for services with load characteristics larger than 3000 amps. To provide such service, the Company requires early and detailed consultation. 302. Types of Secondary Service Refer to Characteristics of Supply 480 Volts and Below. 303. Overhead Service from Overhead System a. The Company service drop will be attached to the structure at the approved location, accessible and at a height to provide adequate clearance. The minimum clearances are: - Twelve feet above finished grade, sidewalks, residential driveways, and commercial areas not subject to truck traffic and located more than 25 feet in any direction from a swimming pool, swimming area, or diving platform. - Sixteen feet over roads, streets, alleys, parking lots or other areas subject to truck traffic. - Refer to Overhead Service Entrance and Overhead Service Drop. b. Customer owned service entrance conductors or cable shall be terminated with an approved detachable weather head and be safely accessible from a ladder on the ground. Refer to Overhead Service Drop. c. Location of customer owned weather head shall be positioned to permit the installation of the Company service drop at or below the weather head. A minimum of 20 inches of conductor must extend from the weather head to make a connection to the service drop with a proper drip loop. Refer to Overhead Service Entrance. d. Customer is responsible for providing adequate tree trimming and/or tree removals for the service. 44
  10. Page 47 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 47 of 67 Eversource | CT Information & Requirements 2024 Article 304 | Section 3 — Types of Electric Service 304. Service Lateral from Overhead System or Conduit System Consult with an Electric Service Designer for a conduit service 200 feet or longer. Customer is responsible for: a. Providing a trench with conduit at a depth that provides a cover of 24 inches above the conduit that will run from the Company designated service location at the foundation to the Company’s facilities. In some instances, the Company may require the installation of more than one conduit. b. Ensuring the designated point of attachment for overhead services shall be in direct line of sight to the Company’s distribution facilities. The Company shall be consulted for any installations that may not conform to this requirement. Refer to Article 614. c. Ensuring the conduit systems do not enter the building ahead of the first point of disconnect and metering. Refer to Article 614. d. Using conduit that is electrical grade schedule 40 PVC; minimum of 3-inch diameter for single phase service and minimum of 4-inch diameter for three phase service. e. Providing and installing caution tape in the trench backfill, including conduit encased in concrete. Metallic foil tape is not acceptable. Refer to Trenching Requirements for Service or Secondary Line. f. Coordinating with other utilities, such as telephone, cable, water, and gas. g. Providing and installing conduit, including an approved slip joint, from the metering equipment to the trench conduit. The line side conduit shall enter the meter cabinet through the bottom left knock-out. The slip joint shall be securely fastened to the building with one clamp. The end of the conduit at our facilities shall be capped and left accessible. Refer to Conduit Service - Supply End. Contact the Company for conduit size. For single phase, a minimum of 3-inch diameter is required. For three phase, a minimum of 4-inch diameter is required. h. At the service end, providing and installing an electrical grade schedule 40 PVC sweep (or steel, if required by the Company) with a 90-degree bend, 24-inch minimum radius from the slip joint to the conduit in the trench. i. If the designated point on the distribution system is on the opposite side of the road, a conduit road crossing is required. The conduit shall be concrete encased or steel. Such road crossing is at the customer’s expense. If allowed by the local municipality, an overhead crossing may be installed at the customer’s expense. This includes the pole, the length of customer-dedicated road crossing conductor and any required guying. If a road crossing pole exists or is provided by another utility, a customer’s conduit service may be taken from that pole. Contact the Electric Service Designer whenever a road crossing is required. 45

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)