Interrogatory responses
Answers to questions 1, 2, 4, 10, 18, 20
Files13
ICC-001_Final.pdf
PDF · 114 KB · 1 pageText searchable
Download ICC-001_Final.pdfRead the text of ICC-001_Final.pdf
ICC-001 Attachment 1.pdf
PDF · 3.4 MB · 28 pagesText searchable
Download ICC-001 Attachment 1.pdfRead the text of ICC-001 Attachment 1.pdf
ICC 001 Attachment 2.pdf
PDF · 4.0 MB · 68 pagesText searchable
Download ICC 001 Attachment 2.pdfRead the text of ICC 001 Attachment 2.pdf
ICC-001 Attachment 3.pdf
PDF · 1.1 MB · 34 pagesText searchable
Download ICC-001 Attachment 3.pdfRead the text of ICC-001 Attachment 3.pdf
ICC-001 Attachment 4.pdf
PDF · 1.3 MB · 34 pagesText searchable
Download ICC-001 Attachment 4.pdfRead the text of ICC-001 Attachment 4.pdf
ICC-001 Attachment 5.pdf
PDF · 3.5 MB · 67 pagesText searchable
Download ICC-001 Attachment 5.pdfRead the text of ICC-001 Attachment 5.pdf
ICC-002_Final.pdf
PDF · 143 KB · 2 pagesText searchable
Download ICC-002_Final.pdfRead the text of ICC-002_Final.pdf
ICC-002 Attachment 1.pdf
PDF · 1.1 MB · 29 pagesText searchable
Download ICC-002 Attachment 1.pdfRead the text of ICC-002 Attachment 1.pdf
ICC-002 Attachment 2.pdf
PDF · 1.5 MB · 74 pagesText searchable
Download ICC-002 Attachment 2.pdfRead the text of ICC-002 Attachment 2.pdf
ICC-002 Attachment 3.pdf
PDF · 2.5 MB · 27 pagesText searchable
Download ICC-002 Attachment 3.pdfRead the text of ICC-002 Attachment 3.pdf
ICC-004_Final.pdf
PDF · 127 KB · 1 pageText searchable
Download ICC-004_Final.pdfRead the text of ICC-004_Final.pdf
ICC-010_Final.pdf
PDF · 168 KB · 4 pagesText searchable
Download ICC-010_Final.pdfRead the text of ICC-010_Final.pdf
ICC-018_Final.pdf
PDF · 135 KB · 2 pagesText searchable
Download ICC-018_Final.pdfRead the text of ICC-018_Final.pdf
Text of ICC-001 Attachment 3.pdf
Extracted from the file · 34 pages · 76,972 characters
Text of ICC-001 Attachment 4.pdf
Extracted from the file · 34 pages · 72,650 characters
Page 48 of 67
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 48 of 67 Eversource | CT Information & Requirements 2024 Article 304 | Section 3 — Types of Electric Service j. Providing and installing a galvanized steel sweep (or electrical grade schedule 80 PVC if approved by the Company in advance) and conduit with cap at the riser pole if from the Company’s overhead system. The sweep shall be a 90-degree bend with a minimum 24-inch radius. Refer to Conduit Service – Supply End. k. Installing a ¼ inch diameter nylon pulling line from the meter socket to the end of the conduit at our facilities (transformer pad, temporary dead-end, handhole or riser pole). Do not enter or open existing electrical structures such as handholes, transformer pads or switch vaults, when installing the pulling line. If access is needed, contact the Electric Service Designer. l. Providing and installing the ground assembly at the steel sweep at the customer’s service entrance. The ground assembly shall consist of a ground clamp suitable for direct burial, Number 6 bare copper wire, a ground rod connector, and a five-eighth inch by eight-foot ground rod. Refer to Conduit Service – House End. m. Taking pictures of trench, metering, and service entrance equipment to confirm correct installation/clearances. n. Backfilling the trench before the cable install. Exercise care while backfilling to avoid damaging the conduit by not dropping rocks or frozen earth onto it. Suitable backfill shall not contain ash, cinder, shell, frozen material, loose debris, or stones larger than 2 inch maximum dimension. o. The trench shall be as straight as possible from the point of termination on the building to Company facilities. The total of all bends shall not exceed 225 degrees with no reverse bends. p. Ensuring that proper clearances for pad-mounted transformers are maintained from travel ways, windows, doors, and any other structures per the following table: MINIMUM DISTANCE IN FEET ITEM Door Air Intake Window Fire Escape Combustible Wall Noncombustible Wall Fuel Tanks above & below grade Natural gas or propane connections Gasoline dispensing unit IN FRONT TO SIDE OF BELOW 20 10 10 20 6 5 10 3 20 10 10 3 20 6 3 10 3 20 25 5 - 46Page 49 of 67
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 49 of 67 Eversource | CT Information & Requirements 2024 Article 305-308 | Section 3 — Types of Electric Service 305. Installation and maintenance responsibilities for conduit system service laterals a. Residential Service Entrance. The Company will install conductors in the conduit and terminate in customer owned meter socket and main switch. b. Commercial / Industrial Services to Service Entrance Capacity of 400 amps or less. The Company will furnish the cable, install the cable in the conduit, and terminate at the customer owned meter socket and main switch, or duct box. The Company will maintain its cable. The Customer will furnish, install, and maintain the conduit and all conductors and disconnecting device (breaker or fuse) beyond the termination point. Refer to Article 611 for types of metering available. c. Commercial / Industrial Services to Service Entrance Capacity more than 400 Amps. The Customer will furnish, install, own and maintain all secondary conduit and conductors loosely make up all transformer connections (Company supplied) to the secondary bushings and ensure proper conductor length to avoid tension on the bushings. The Company will make the final connections. Transformer bushings should never be used as a stanchion in the course of pulling conductors. 306. Service Lateral from Underground Manhole System The Company must be consulted for service lateral from underground manhole system service requests. a. The service shall include approved Customer provided conduit from the service entrance location to a point on the distribution system designated by the Company. The Customer will install this conduit, including replacement, if necessary, for service upgrades. The service entrance location must be located on the exterior wall of the building. b. The Company will install conductors into the customer provided conduit. Charges will be in accordance with Company policy. The Company will furnish, install, and own the seal between the customer provided conduit and the Company conductors. The Company will maintain the seal at the Customer’s request but will not be responsible for damage due to a leaking seal. The Customer will furnish, install, own, and maintain the seal between its conduit and the wall. c. If service is fed from a network system, the conduit shall be concrete encased or steel. If service is fed from a non-network system, the conduit shall be concrete encased or steel to the end of the town/state right of way. 307. Temporary Service Temporary services must be removed within one year. The Company will supply temporary electric service when it can be served from existing lines or facilities. Customer is responsible for: • Supplying and maintaining suitable service entrance equipment (weatherproof, if required) in accordance with the International Residential Code. Used material, equipment and devices shall not be reused unless approved by the building official. • Rendering payment in advance for the cost of connecting and disconnecting the service. This includes the cost of installation and removal of any poles, wires, transformers, meter equipment, or other facilities. These charges are in addition to the regular rate applicable to the use of energy. Refer to Temporary Electric Service - Conduit System and Temporary Electric Service Overhead System. 308. It is the Customer’s responsibility to notify the Company when the temporary service is to be discontinued. All electric service equipment will be removed at that time. 47Page 50 of 67
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 50 of 67 Eversource | CT Information & Requirements 2024 Article 400-410 | Section 4 — Characteristics of Supply 480 Volts and Below 400. The Company will supply and meter alternating current with a nominal frequency of 60 hertz (cycles per second). 401. Consult with the Company before purchasing equipment or beginning any electric construction for a new service or an increase in capacity. 402. The Company will designate available nominal voltage and phase characteristics: NORMAL VOLTAGE 120/240 120/208 208Y/120 480Y/277 PHASE 1 1 3 3 WIRES 3 3 4 4 403. The voltage rating of Customer equipment should be compatible with the normal voltage which the Company will supply. 404. The Company cannot guarantee to maintain the voltage level of these nominal values under all conditions; however, voltage will normally be maintained within reasonable limits and as specified by the regulatory authority. 405. The Company recommends the use of suitable voltage regulating devices where equipment sensitive to voltage is in use. Devices shall be installed after the metering equipment. 406. In general, only single phase service will be supplied to residential loads. 407. Campground and mobile home park services must be 120/240 volts. 408. The maximum single-phase service from an overhead distribution system is 400 amps, including the total rated ampacity for multiple main switches. Under some circumstances a 400-amp main disconnect is required ahead of multiple sub-main switches when the total rated ampacity exceeds 400 amps (excluding the owner’s loop if it is rated at 60 amps). Consult with an Electric Service Designer. 409. A single-phase service exceeding 400 amps to a maximum of 1200 amps must be fed from a pad mounted transformer. Consult with an Electric Service Designer. 410. The maximum three-phase service allowed from an overhead distribution system is 400 amps, including the total rated capacity for multiple main switches. Under some circumstances, a 400amp main disconnect may be required ahead of multiple sub-main switches whose total rated capacity exceeds 400 amps. Consult with an Electric Service Designer. 48Page 51 of 67
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 51 of 67 Eversource | CT Information & Requirements 2024 Article 411-417 | Section 4 — Characteristics of Supply 480 Volts and Below 411. The largest standard three-phase underground service the Company can provide with one transformer is 3000 amps. Consult with an Electric Service Designer. 412. Three-phase service is normally available for three phase supply loads of 75 kVA or larger only. Consult with an Electric Service Designer. 413. Three-phase supply is not normally available for single family housing. For large residential complexes that may require a three-phase service to the building, individual residential customers will be serviced with single-phase 120/208 volts, 200 amps maximum per position. 414. The Company may refuse to supply electric service to loads with characteristics that may adversely affect the supply to other customers, such as harmonic distortion, voltage fluctuations, noise, or low power factor. 415. The Company no longer offers new 2-phase supply. Customers with existing 2-phase shall consult with the Company before making any changes or additions. 416. The Company no longer offers new three phase, 3 wire, delta supply. Any major upgrade to a Customer’s premise or service entrance shall require an upgrade to a three-phase, four-wire system. This includes any upgrade necessary to accommodate a Distributed Energy Resource system. 417. The Company reserves the right to remove any Company owned facilities or services that become inactive. 49Page 52 of 67
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 52 of 67 Eversource | CT Information & Requirements 2024 Article 500-509 | Section 5 — Customer Owned Facilities Service Equipment 500. Customer owned service equipment must be properly rated for voltage, current, interrupting duty, and ground fault current. Refer to Metering for proper service equipment specifications and/or sizing. 501. The Company, upon request, will furnish information necessary to select proper Customer owned service equipment. 502. Higher than usual interrupting duty is required for the main disconnect when supplied from a network system or transformer capacity of 75 KVA or greater. Contact the Company for detailed requirements. 503. Customer owned service equipment shall be installed on the load side of self-contained meters up to 240 volts. 504. Consult with the Company for installations with the main disconnect installed on the line side of the meter (cold sequence): a. All 480-volt services. b. Services fed from a Company network (208Y/120V) system. Contact the Company for this type of installation. Refer to Hot and Cold Meter Sequence – Self Contained and Modular Meter Panels for Group Metering. c. Single phase overhead residential installations with multiple meter positions exceeding 400 amps. Consult with the Company for this type of installation. d. All Instrument Transformer rated services. e. The Company reserves the right to make any service cold sequenced for safety and protection of Company equipment. 505. A Customer provided cable limiter cabinet may be required for a network service. Consult with the Company. 506. There shall be no more than six disconnects per service grouped in any one location. Refer to Modular Meter Panels for Group Metering. Utilizing a main disconnect is the preferred installation to allow for additional meters beyond six. 507. All fire pump and alarm circuits shall be metered. If the authority having jurisdiction requires the fire pump or alarm service connections to be ahead of the normal metering, a separate service meter shall be installed at the Customer’s expense. Consult with the Company. Refer to Article 662. 508. For multiple unit residential buildings, all common facilities (hallway lighting, alarm systems, well pumps, etc.) must be metered separately. This is commonly referred to as an owner’s meter. 509. When changes or alteration are made to Customer owned service equipment the service entrance and meter installations must conform to Company requirements and applicable codes. 50Page 53 of 67
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 53 of 67 Eversource | CT Information & Requirements 2024 Article 510-516 | Section 5 — Customer Owned Facilities Service Entrance Conductors 510. Where a main switch or circuit breaker constitutes the service equipment for a residential single-phase installation, the minimum ampacity of the service entrance conductors shall be at least equal to the rating of the main circuit breaker or the largest main fuse which can be installed in the service equipment. 511. For single-phase installation to an individual customer where more than one switch or circuit breaker is permitted as the service equipment, the ampacity of the service entrance conductors and meter socket-shall be a minimum of 100 amperes. 512. For multiple occupancy buildings where up to six individual switches or circuit breakers function as the disconnecting means, the service entrance conductors must have adequate ampacity for the load. 513. Metered and unmetered conductors shall not occupy the same cable raceway, conduit, handhole, underground box, or encloser. Pole Mounted Service Equipment and Metering (Special Installation) 514. The Company does not allow pole mounted service equipment and metering. 515. For existing installations, if the Company determines the pole needs to be replaced, the Company will replace the pole. Shifting the existing customer owned service equipment to the new pole is the customer’s responsibility and at the customer’s expense. 516. Repairs and upgrades to existing customer owned service equipment mounted on a Company pole is not allowed. When repairs or an upgrade to customer equipment is necessary, the Customer shall install and shift the equipment to a pedestal service at the customer’s expense. 51Page 54 of 67
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 54 of 67 Eversource | CT Information & Requirements 2024 Article 600-610 | Section 6 — Metering General 600. The Company may refuse to connect a service or install a meter on any metering installation that does not conform to the requirements in this booklet or is deemed unsafe. 601. Electricity shall not be supplied without being metered or otherwise accounted for as defined by rates. No unmetered conductors shall be installed, pulled, or run through the inside of a building. 602 In the event of Company metering equipment failure, the electrical contractor is responsible for scheduling an outage within a reasonable time frame to allow for repairs. 603. The Company will not supply service to a Customer whose wiring is designed for resale of electricity through submetering except for facilities as approved, in writing, by the Public Utilities Regulatory Authority (PURA). 604. The Customer shall furnish, install, own, and maintain the meter socket and/or instrument transformer (IT) enclosure. Meter sockets must be approved by the Company. Visit www. eversource.com, Builders and Contractors, Connecticut for current metering equipment information. 605. All new, changed, modified, or upgraded service including customer owned metering equipment shall have a municipal inspection before energizing the service. 606. After the Customer meter socket is installed, the Customer shall protect the interior of the socket by installing an approved optically clear cover. 607. The Company shall designate the meter location. This includes new, changed, modified, and upgraded services. 608. The Customer shall maintain a clear and safe workspace directly in front of each meter location. In areas where meter equipment is subject to vehicular traffic, doors, etc., additional protection (such as bollards) is required. Refer to Electric Equipment Ownership and Required Meter Clearances. • The meter socket must be located at least 3 feet measured horizontally from a gas meter, regulator, propane cylinder, exhaust, or any other fuel storage vessel. • All single position meter sockets will require 6 inches of clearance around it. 609. The Company shall furnish, own, and maintain the meter, IT, and any wiring between the IT and the meter. 610. Meter(s) shall be installed, removed, and changed only by authorized Company employees and/or in accordance with the Residential Cut and Reconnect Policy. 52Page 55 of 67
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 55 of 67 Eversource | CT Information & Requirements 2024 Article 611-620 | Section 6 — Metering 611. There are two standard metering installations. Self-Contained and Instrument Transformer. The type of meter installation is determined by the voltage, phase, and total name plate rating of the disconnect. Refer to the table below and to the Construction Requirements section of this booklet for illustrations. SUPPLY CHARACTERISTICS NOMINAL VOLTAGE 120/240 120/208 208Y/120 480Y/277 FIRE PUMP PHASE WIRE 1 1 3 3 1 3 3 3 4 4 3 4 SELF CONTAINED METER 320 AMPS CONTINUOUS OR LESS INSTRUMENT TRANSFORMER METER TOTAL NAME PLATE RATING OF SERVICE SIZE TOTAL NAME PLATE RATING OF SERVICE SIZE 600 – 1200 AMPS Not Applicable 600 – 3000 AMPS 600 – 3000 AMPS 600 – 1200 AMPS 600 – 3000 AMPS 100 - 400 AMPS 100 - 200 AMPS 100 - 400 AMPS 100 - 400 AMPS Must be IT rated service 612. Totalized metering is not available. 613. Contact the Company for services over 3000 amps before construction. 614. Meters shall be located outdoors for all services and be accessible at all times. • For all residential services, the meter location shall be on the front or front side corner of the structure or property. The front is considered to be the side adjacent to the street. • For any location with a fence that restricts access to metering equipment (including, but not limited to cell towers, government facilities, schools), a designated entry gate is required with an approved Company lock for 24/7 access. 615. Meter sockets and IT equipment shall not be used as a junction box, raceway, or as a grounding point with no taps permitted for any parallel generation or additional services. 616. Customer owned devices shall not be installed between the meter and the meter socket. 617. No Customer owned transformation shall be allowed between the Company’s transformer and the first metering point. 618. Customers planning to install generation running in parallel, refer to Distributed Energy Resources Owned by Customers. Previously installed service configurations do not set precedent. 619. The Customer shall provide a one-line schematic diagram showing the service entrance, main switch, and proposed meter location when requesting a new, changed, modified, or upgraded service and/or an additional meter. 620. Facilities with multiple meters shall have all meters grouped together within ten feet of one another. 53Page 56 of 67
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 56 of 67 Eversource | CT Information & Requirements 2024 Article 621-634 | Section 6 — Metering 621. A service location that has not had an active meter for six months, will require a municipal inspection and must abide by all requirements of this booklet prior to service reconnection. 622. No Customer owned equipment or conductors other than load side conductors directly serving the Customer’s service shall be placed in any Company metering enclosure. 623. Single residential homes shall display the official address on record that was provided by the municipality on the exterior of the building. Lot numbers are unacceptable. 624. In multiple meter installations, each meter mounting device and Customer disconnecting means shall be permanently marked with a weatherproof label on the cover of the associated breaker, inside the associated meter socket, and inside the load center before the meter is installed. The entry door of each unit shall also be marked with the corresponding unique identifier before the meter is installed. It is the Customer’s (i.e., property owner/landlord) responsibility to notify the Company of any renumbering changes. 625. Typical meter installations are illustrated in the Construction Requirements section of this booklet. 626. Metered and unmetered conductors shall not occupy the same cable, conduit, handhole, underground box, or enclosure. 627. Crossing of metered and unmetered conductors is not permitted. 628. Field modifications of metering equipment or disconnects which impact the UL listing are not permitted unless approved by the manufacturer and recertified by UL. 629. No conductors of any type shall travel on the right-hand side of the meter socket. The lever bypass must be operable at all times without interference. 630. Jumpers or other devices that result in unmetered electric service shall not be used. Refer to the Residential Cut and Reconnect Policy. 631. Customer owned pole-mounted meters are a special installation that is permitted only if the Customer furnishes, owns, and maintains the pole. Consult with the Company. Meter Equipment Mounting and Supports 632. Meter sockets shall be mounted plumb and be securely fastened to a permanent rigid wall protected from any corrosive material, exhaust systems, falling objects, or ice buildup. Appropriate screws of sufficient size shall be used to hold the socket secure. Refer to Self-Contained Meter Socket Sequence and Mounting Arrangement for specific requirements. 633. An individual meter or meters mounted adjacent to each other horizontally shall be installed so that the center is approximately 5 feet from the floor to final grade. Refer to Electric Equipment Ownership and Required Meter Clearances. 634. Requirements for vertically positioned, multiple meter installations only, refer to Modular Meter Panels for Group Metering. 54Page 57 of 67
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 57 of 67 Eversource | CT Information & Requirements 2024 Article 635-642 | Section 6 — Metering Grounding 635. The grounding electrode conductor shall be at an accessible location in the service equipment and not run through the meter socket nor the IT compartment. 636. The Customer service entrance installation shall have a neutral which is grounded at the first point of disconnect. Meter sockets are not considered a disconnect device. • • Cold sequenced metering • The first point of disconnect shall have a location to connect the neutral that is bonded to ground. • All subsequent metering equipment shall have an isolated neutral. • In instances when a neutral isolation kit is required, the isolation kit shall be from the same meter equipment manufacturer. Hot sequenced metering • The meter socket enclosure must be bonded to the neutral position. 637. Copper and aluminum shall never be in physical contact with each other. Use special devices designed for this purpose where electrical connection is necessary. 638. The meter socket shall never be used as a grounding point. Meter Seals 639. All metering equipment and access points to unmetered wiring shall have Company sealing provisions. 640. All disconnecting switches that are utilized for utility metering shall have a locking provision in the off position. 641. Connecting, disconnecting, or tampering with metering equipment is strictly prohibited. When it is necessary to gain access to sealed meter equipment, the Customer shall contact the Company for permission to do so. Upon completion of the work the Customer shall notify the Company to reseal the equipment. 642. Unsafe conditions observed by the Company may result in disconnection of service until made safe. 55
Text of ICC-002_Final.pdf
Extracted from the file · 2 pages · 2,788 characters
Text of ICC-002 Attachment 1.pdf
Extracted from the file · 29 pages · 46,015 characters
Text of ICC-002 Attachment 2.pdf
Extracted from the file · 74 pages · 148,550 characters
Text of ICC-002 Attachment 3.pdf
Extracted from the file · 27 pages · 91,051 characters
Text of ICC-004_Final.pdf
Extracted from the file · 1 page · 983 characters
Text of ICC-010_Final.pdf
Extracted from the file · 4 pages · 11,507 characters
Text of ICC-018_Final.pdf
Extracted from the file · 2 pages · 2,628 characters
As listed on the current system
Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026