Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

  1. Page 51 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 51 of 67 Eversource | CT Information & Requirements 2024 Article 411-417 | Section 4 — Characteristics of Supply 480 Volts and Below 411. The largest standard three-phase underground service the Company can provide with one transformer is 3000 amps. Consult with an Electric Service Designer. 412. Three-phase service is normally available for three phase supply loads of 75 kVA or larger only. Consult with an Electric Service Designer. 413. Three-phase supply is not normally available for single family housing. For large residential complexes that may require a three-phase service to the building, individual residential customers will be serviced with single-phase 120/208 volts, 200 amps maximum per position. 414. The Company may refuse to supply electric service to loads with characteristics that may adversely affect the supply to other customers, such as harmonic distortion, voltage fluctuations, noise, or low power factor. 415. The Company no longer offers new 2-phase supply. Customers with existing 2-phase shall consult with the Company before making any changes or additions. 416. The Company no longer offers new three phase, 3 wire, delta supply. Any major upgrade to a Customer’s premise or service entrance shall require an upgrade to a three-phase, four-wire system. This includes any upgrade necessary to accommodate a Distributed Energy Resource system. 417. The Company reserves the right to remove any Company owned facilities or services that become inactive. 49
  2. Page 52 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 52 of 67 Eversource | CT Information & Requirements 2024 Article 500-509 | Section 5 — Customer Owned Facilities Service Equipment 500. Customer owned service equipment must be properly rated for voltage, current, interrupting duty, and ground fault current. Refer to Metering for proper service equipment specifications and/or sizing. 501. The Company, upon request, will furnish information necessary to select proper Customer owned service equipment. 502. Higher than usual interrupting duty is required for the main disconnect when supplied from a network system or transformer capacity of 75 KVA or greater. Contact the Company for detailed requirements. 503. Customer owned service equipment shall be installed on the load side of self-contained meters up to 240 volts. 504. Consult with the Company for installations with the main disconnect installed on the line side of the meter (cold sequence): a. All 480-volt services. b. Services fed from a Company network (208Y/120V) system. Contact the Company for this type of installation. Refer to Hot and Cold Meter Sequence – Self Contained and Modular Meter Panels for Group Metering. c. Single phase overhead residential installations with multiple meter positions exceeding 400 amps. Consult with the Company for this type of installation. d. All Instrument Transformer rated services. e. The Company reserves the right to make any service cold sequenced for safety and protection of Company equipment. 505. A Customer provided cable limiter cabinet may be required for a network service. Consult with the Company. 506. There shall be no more than six disconnects per service grouped in any one location. Refer to Modular Meter Panels for Group Metering. Utilizing a main disconnect is the preferred installation to allow for additional meters beyond six. 507. All fire pump and alarm circuits shall be metered. If the authority having jurisdiction requires the fire pump or alarm service connections to be ahead of the normal metering, a separate service meter shall be installed at the Customer’s expense. Consult with the Company. Refer to Article 662. 508. For multiple unit residential buildings, all common facilities (hallway lighting, alarm systems, well pumps, etc.) must be metered separately. This is commonly referred to as an owner’s meter. 509. When changes or alteration are made to Customer owned service equipment the service entrance and meter installations must conform to Company requirements and applicable codes. 50
  3. Page 53 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 53 of 67 Eversource | CT Information & Requirements 2024 Article 510-516 | Section 5 — Customer Owned Facilities Service Entrance Conductors 510. Where a main switch or circuit breaker constitutes the service equipment for a residential single-phase installation, the minimum ampacity of the service entrance conductors shall be at least equal to the rating of the main circuit breaker or the largest main fuse which can be installed in the service equipment. 511. For single-phase installation to an individual customer where more than one switch or circuit breaker is permitted as the service equipment, the ampacity of the service entrance conductors and meter socket-shall be a minimum of 100 amperes. 512. For multiple occupancy buildings where up to six individual switches or circuit breakers function as the disconnecting means, the service entrance conductors must have adequate ampacity for the load. 513. Metered and unmetered conductors shall not occupy the same cable raceway, conduit, handhole, underground box, or encloser. Pole Mounted Service Equipment and Metering (Special Installation) 514. The Company does not allow pole mounted service equipment and metering. 515. For existing installations, if the Company determines the pole needs to be replaced, the Company will replace the pole. Shifting the existing customer owned service equipment to the new pole is the customer’s responsibility and at the customer’s expense. 516. Repairs and upgrades to existing customer owned service equipment mounted on a Company pole is not allowed. When repairs or an upgrade to customer equipment is necessary, the Customer shall install and shift the equipment to a pedestal service at the customer’s expense. 51
  4. Page 54 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 54 of 67 Eversource | CT Information & Requirements 2024 Article 600-610 | Section 6 — Metering General 600. The Company may refuse to connect a service or install a meter on any metering installation that does not conform to the requirements in this booklet or is deemed unsafe. 601. Electricity shall not be supplied without being metered or otherwise accounted for as defined by rates. No unmetered conductors shall be installed, pulled, or run through the inside of a building. 602 In the event of Company metering equipment failure, the electrical contractor is responsible for scheduling an outage within a reasonable time frame to allow for repairs. 603. The Company will not supply service to a Customer whose wiring is designed for resale of electricity through submetering except for facilities as approved, in writing, by the Public Utilities Regulatory Authority (PURA). 604. The Customer shall furnish, install, own, and maintain the meter socket and/or instrument transformer (IT) enclosure. Meter sockets must be approved by the Company. Visit www. eversource.com, Builders and Contractors, Connecticut for current metering equipment information. 605. All new, changed, modified, or upgraded service including customer owned metering equipment shall have a municipal inspection before energizing the service. 606. After the Customer meter socket is installed, the Customer shall protect the interior of the socket by installing an approved optically clear cover. 607. The Company shall designate the meter location. This includes new, changed, modified, and upgraded services. 608. The Customer shall maintain a clear and safe workspace directly in front of each meter location. In areas where meter equipment is subject to vehicular traffic, doors, etc., additional protection (such as bollards) is required. Refer to Electric Equipment Ownership and Required Meter Clearances. • The meter socket must be located at least 3 feet measured horizontally from a gas meter, regulator, propane cylinder, exhaust, or any other fuel storage vessel. • All single position meter sockets will require 6 inches of clearance around it. 609. The Company shall furnish, own, and maintain the meter, IT, and any wiring between the IT and the meter. 610. Meter(s) shall be installed, removed, and changed only by authorized Company employees and/or in accordance with the Residential Cut and Reconnect Policy. 52
  5. Page 55 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 55 of 67 Eversource | CT Information & Requirements 2024 Article 611-620 | Section 6 — Metering 611. There are two standard metering installations. Self-Contained and Instrument Transformer. The type of meter installation is determined by the voltage, phase, and total name plate rating of the disconnect. Refer to the table below and to the Construction Requirements section of this booklet for illustrations. SUPPLY CHARACTERISTICS NOMINAL VOLTAGE 120/240 120/208 208Y/120 480Y/277 FIRE PUMP PHASE WIRE 1 1 3 3 1 3 3 3 4 4 3 4 SELF CONTAINED METER 320 AMPS CONTINUOUS OR LESS INSTRUMENT TRANSFORMER METER TOTAL NAME PLATE RATING OF SERVICE SIZE TOTAL NAME PLATE RATING OF SERVICE SIZE 600 – 1200 AMPS Not Applicable 600 – 3000 AMPS 600 – 3000 AMPS 600 – 1200 AMPS 600 – 3000 AMPS 100 - 400 AMPS 100 - 200 AMPS 100 - 400 AMPS 100 - 400 AMPS Must be IT rated service 612. Totalized metering is not available. 613. Contact the Company for services over 3000 amps before construction. 614. Meters shall be located outdoors for all services and be accessible at all times. • For all residential services, the meter location shall be on the front or front side corner of the structure or property. The front is considered to be the side adjacent to the street. • For any location with a fence that restricts access to metering equipment (including, but not limited to cell towers, government facilities, schools), a designated entry gate is required with an approved Company lock for 24/7 access. 615. Meter sockets and IT equipment shall not be used as a junction box, raceway, or as a grounding point with no taps permitted for any parallel generation or additional services. 616. Customer owned devices shall not be installed between the meter and the meter socket. 617. No Customer owned transformation shall be allowed between the Company’s transformer and the first metering point. 618. Customers planning to install generation running in parallel, refer to Distributed Energy Resources Owned by Customers. Previously installed service configurations do not set precedent. 619. The Customer shall provide a one-line schematic diagram showing the service entrance, main switch, and proposed meter location when requesting a new, changed, modified, or upgraded service and/or an additional meter. 620. Facilities with multiple meters shall have all meters grouped together within ten feet of one another. 53
  6. Page 56 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 56 of 67 Eversource | CT Information & Requirements 2024 Article 621-634 | Section 6 — Metering 621. A service location that has not had an active meter for six months, will require a municipal inspection and must abide by all requirements of this booklet prior to service reconnection. 622. No Customer owned equipment or conductors other than load side conductors directly serving the Customer’s service shall be placed in any Company metering enclosure. 623. Single residential homes shall display the official address on record that was provided by the municipality on the exterior of the building. Lot numbers are unacceptable. 624. In multiple meter installations, each meter mounting device and Customer disconnecting means shall be permanently marked with a weatherproof label on the cover of the associated breaker, inside the associated meter socket, and inside the load center before the meter is installed. The entry door of each unit shall also be marked with the corresponding unique identifier before the meter is installed. It is the Customer’s (i.e., property owner/landlord) responsibility to notify the Company of any renumbering changes. 625. Typical meter installations are illustrated in the Construction Requirements section of this booklet. 626. Metered and unmetered conductors shall not occupy the same cable, conduit, handhole, underground box, or enclosure. 627. Crossing of metered and unmetered conductors is not permitted. 628. Field modifications of metering equipment or disconnects which impact the UL listing are not permitted unless approved by the manufacturer and recertified by UL. 629. No conductors of any type shall travel on the right-hand side of the meter socket. The lever bypass must be operable at all times without interference. 630. Jumpers or other devices that result in unmetered electric service shall not be used. Refer to the Residential Cut and Reconnect Policy. 631. Customer owned pole-mounted meters are a special installation that is permitted only if the Customer furnishes, owns, and maintains the pole. Consult with the Company. Meter Equipment Mounting and Supports 632. Meter sockets shall be mounted plumb and be securely fastened to a permanent rigid wall protected from any corrosive material, exhaust systems, falling objects, or ice buildup. Appropriate screws of sufficient size shall be used to hold the socket secure. Refer to Self-Contained Meter Socket Sequence and Mounting Arrangement for specific requirements. 633. An individual meter or meters mounted adjacent to each other horizontally shall be installed so that the center is approximately 5 feet from the floor to final grade. Refer to Electric Equipment Ownership and Required Meter Clearances. 634. Requirements for vertically positioned, multiple meter installations only, refer to Modular Meter Panels for Group Metering. 54
  7. Page 57 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 57 of 67 Eversource | CT Information & Requirements 2024 Article 635-642 | Section 6 — Metering Grounding 635. The grounding electrode conductor shall be at an accessible location in the service equipment and not run through the meter socket nor the IT compartment. 636. The Customer service entrance installation shall have a neutral which is grounded at the first point of disconnect. Meter sockets are not considered a disconnect device. • • Cold sequenced metering • The first point of disconnect shall have a location to connect the neutral that is bonded to ground. • All subsequent metering equipment shall have an isolated neutral. • In instances when a neutral isolation kit is required, the isolation kit shall be from the same meter equipment manufacturer. Hot sequenced metering • The meter socket enclosure must be bonded to the neutral position. 637. Copper and aluminum shall never be in physical contact with each other. Use special devices designed for this purpose where electrical connection is necessary. 638. The meter socket shall never be used as a grounding point. Meter Seals 639. All metering equipment and access points to unmetered wiring shall have Company sealing provisions. 640. All disconnecting switches that are utilized for utility metering shall have a locking provision in the off position. 641. Connecting, disconnecting, or tampering with metering equipment is strictly prohibited. When it is necessary to gain access to sealed meter equipment, the Customer shall contact the Company for permission to do so. Upon completion of the work the Customer shall notify the Company to reseal the equipment. 642. Unsafe conditions observed by the Company may result in disconnection of service until made safe. 55
  8. Page 58 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 58 of 67 Eversource | CT Information & Requirements 2024 Article 643-648 | Section 6 — Metering Self-Contained Single Phase Meter Installations 643. Refer to Article 611 for services where this type of meter installation is required. • Customer shall furnish, install, own, and maintain approved, single phase ringless meter sockets, factory installed lever bypass with clamping jaws. The lever bypass shall not be used for load breaking purposes. Visit www.eversource.com, Builders and Contractors, Connecticut for current metering equipment information. • Company shall furnish, install, own, and maintain the electric meter only. Sequence of Meter and Service Equipment – Single Phase Installations 644. 645. Single phase service equipment shall be installed on the load side of self-contained meters Hot and Cold Meter Sequence – Self Contained except for: • Services fed from a network system and the disconnect device shall have an AIC (ampere interrupting capacity) rating of 100,000 amps. • Services fed from a transformer that exceeds the AIC rating of the self-contained single or multi position meter socket. Contact the Company for AIC rating of transformer feeding new or existing services. • Grouped metering containing greater than 6 metering positions. • Any service voltage greater than 240 volts must be cold sequenced. For all of the cold sequenced conditions listed above, the main disconnect with overcurrent protection shall be installed on the line side of and adjacent to the meter on the same wall, no greater than 3 feet in distance. The main disconnect shall be service rated for the appropriate AIC and shall include Class R (rejection) type clips installed. Meter Socket Connections – Single Phase Installations 646. Utility/line conductors are always connected to the top terminals of meter sockets. Customer conductors are always connected to the bottom terminals. Refer to Single Phase Self-Contained Metering Connections. 647. Service conductors for all underground fed meter sockets and disconnects shall enter from the bottom left knockout. Refer to Self-Contained Meter Socket Sequence and Mounting Arrangement. Grouped Metering – Single Phase Installations 648. Approved modular metering shall be used for groups of meters such as apartment buildings. Prints of grouped metering arrangements must be submitted to the Company and approved by the Company Meter Department prior to installation. Refer to Modular Meter Panels for Group Metering. 56
  9. Page 59 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 59 of 67 Eversource | CT Information & Requirements 2024 Article 649-655 | Section 6 — Metering Mobile Home - Campground - Marina Metering – Single Phase Installations 649. Mobile home, campground, and marina services shall be 120/240 volts. 650. Mobile home metering facilities shall be provided by the Owner on permanent supports not physically attached to the mobile home. The supports shall be adequate for one or more meter installation and shall be set at a 4-foot minimum depth, galvanized steel set in concrete. Refer to Permanent Built Meter Pedestal and Permanent Manufactured Meter Pedestal. 651. The Company will not provide individual metered services to locations in campgrounds and marinas used for transient purposes. Self-Contained Three Phase Meter Installations 652. Refer to Article 611 for services where this type of meter installation is required. • Customer shall furnish, install, own, and maintain approved, single phase ringless meter sockets, factory installed lever bypass with clamping jaws. The lever bypass shall not be used for load breaking purposes. Visit www.eversource.com, Builders and Contractors, Connecticut for current metering equipment information. • Company shall furnish, install, own, and maintain the electric meter only. Sequence of Meter and Service Equipment – Three Phase Installations 653. Three phase service equipment shall be installed on the load side of self-contained meters Hot and Cold Meter Sequence – Self Contained except for: • Services fed from a network system and the disconnect device shall have an AIC rating of 100,000 amps. • All switchgear, not fed from a network system, shall have a minimum AIC rating of 65,000 amps. • All metering equipment and utility operated disconnects that support distributed generation must accommodate the AIC rating for all sources of energy. • Services fed from a transformer that exceeds the AIC rating of the self-contained single or multi position meter socket. Contact the Company for AIC rating of transformer feeding new or existing services. • Grouped metering containing greater than 6 metering positions. • All 480-volt services must be cold sequenced. 654. For all of the cold sequenced conditions listed above, the main disconnect with overcurrent protection shall be installed on the line side of and adjacent to the meter on the same wall, no greater than 3 feet in distance. The main disconnect shall be service rated for the appropriate AIC and shall include Class R (rejection) type clips installed. 655. Utility/line conductors are always connected to the top terminals of meter sockets. Customer conductors are always connected to the bottom terminals. Refer to Self-Contained Meter Socket Sequence and Mounting Arrangement. 57
  10. Page 60 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 60 of 67 Eversource | CT Information & Requirements 2024 Article 656-659 | Section 6 — Metering Instrument Transformer Installations – Current and Voltage 656. Refer to Article 611 for services where this type of meter installation is required. • Installations that require IT’s (current and voltage) shall be referred to the Company Meter Department for approval before equipment is ordered. Visit www.eversource.com, Builders and Contractors, Connecticut for current metering equipment information. • Service and metering equipment shall not be energized prior to being fully wired and inspected by the Company’s Meter Department and shall be in accordance with arc flash requirements included in this section. Instrument Transformer Metering Equipment – Enclosure/Conduit/Socket 657. The Customer shall furnish, install, own, and maintain Company approved IT enclosure, for the exclusive use of the Company. • Unapproved equipment is not permitted. • Any modification to approved metering equipment shall not be permitted unless explicitly approved by the Company’s Meter Department. • Customer shall procure proper provisions for mounting current and voltage transformers in the same compartment with hinged sealable doors. 600 amp – 1800 amp (12 inch) bar type transformers. 2000 amp – 3000 amp window type current transformers. Horizontal VT mounting provision(s) bolted to the bottom of the instrument transformer cabinet is required for all services greater than 240 volts. Customer shall furnish, install, own, and maintain an approved prewired combination meter socket and test switch. Visit www.eversource.com, Builders and Contractors, Connecticut for current metering equipment information. Entry through the hub opening at the top of the meter socket is not allowed. Refer to Instrument Transformer Connections for installation and wiring requirements. • • • • • • 658. All disconnecting switches that are under the control of the Company shall have proper provisions for lock out tag out requirements. 659. In order to provide isolation of the metering equipment, in accordance to arc flash requirements, the Customer shall furnish, install, own, and maintain the following: • A cold sequenced fused disconnect or breaker installed directly adjacent to the instrument transformer enclosure and within 3 feet. • A disconnect switch, displaying visible break, mounted within 3 feet, on the load side of the IT enclosure. No electrical connections are allowed between the IT enclosure, and the disconnect switch. Refer to Main Switch and Instrument Transformer Enclosure and Instrument Transformer Installation. 58

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)