Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

  1. Page 58 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 58 of 67 Eversource | CT Information & Requirements 2024 Article 643-648 | Section 6 — Metering Self-Contained Single Phase Meter Installations 643. Refer to Article 611 for services where this type of meter installation is required. • Customer shall furnish, install, own, and maintain approved, single phase ringless meter sockets, factory installed lever bypass with clamping jaws. The lever bypass shall not be used for load breaking purposes. Visit www.eversource.com, Builders and Contractors, Connecticut for current metering equipment information. • Company shall furnish, install, own, and maintain the electric meter only. Sequence of Meter and Service Equipment – Single Phase Installations 644. 645. Single phase service equipment shall be installed on the load side of self-contained meters Hot and Cold Meter Sequence – Self Contained except for: • Services fed from a network system and the disconnect device shall have an AIC (ampere interrupting capacity) rating of 100,000 amps. • Services fed from a transformer that exceeds the AIC rating of the self-contained single or multi position meter socket. Contact the Company for AIC rating of transformer feeding new or existing services. • Grouped metering containing greater than 6 metering positions. • Any service voltage greater than 240 volts must be cold sequenced. For all of the cold sequenced conditions listed above, the main disconnect with overcurrent protection shall be installed on the line side of and adjacent to the meter on the same wall, no greater than 3 feet in distance. The main disconnect shall be service rated for the appropriate AIC and shall include Class R (rejection) type clips installed. Meter Socket Connections – Single Phase Installations 646. Utility/line conductors are always connected to the top terminals of meter sockets. Customer conductors are always connected to the bottom terminals. Refer to Single Phase Self-Contained Metering Connections. 647. Service conductors for all underground fed meter sockets and disconnects shall enter from the bottom left knockout. Refer to Self-Contained Meter Socket Sequence and Mounting Arrangement. Grouped Metering – Single Phase Installations 648. Approved modular metering shall be used for groups of meters such as apartment buildings. Prints of grouped metering arrangements must be submitted to the Company and approved by the Company Meter Department prior to installation. Refer to Modular Meter Panels for Group Metering. 56
  2. Page 59 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 59 of 67 Eversource | CT Information & Requirements 2024 Article 649-655 | Section 6 — Metering Mobile Home - Campground - Marina Metering – Single Phase Installations 649. Mobile home, campground, and marina services shall be 120/240 volts. 650. Mobile home metering facilities shall be provided by the Owner on permanent supports not physically attached to the mobile home. The supports shall be adequate for one or more meter installation and shall be set at a 4-foot minimum depth, galvanized steel set in concrete. Refer to Permanent Built Meter Pedestal and Permanent Manufactured Meter Pedestal. 651. The Company will not provide individual metered services to locations in campgrounds and marinas used for transient purposes. Self-Contained Three Phase Meter Installations 652. Refer to Article 611 for services where this type of meter installation is required. • Customer shall furnish, install, own, and maintain approved, single phase ringless meter sockets, factory installed lever bypass with clamping jaws. The lever bypass shall not be used for load breaking purposes. Visit www.eversource.com, Builders and Contractors, Connecticut for current metering equipment information. • Company shall furnish, install, own, and maintain the electric meter only. Sequence of Meter and Service Equipment – Three Phase Installations 653. Three phase service equipment shall be installed on the load side of self-contained meters Hot and Cold Meter Sequence – Self Contained except for: • Services fed from a network system and the disconnect device shall have an AIC rating of 100,000 amps. • All switchgear, not fed from a network system, shall have a minimum AIC rating of 65,000 amps. • All metering equipment and utility operated disconnects that support distributed generation must accommodate the AIC rating for all sources of energy. • Services fed from a transformer that exceeds the AIC rating of the self-contained single or multi position meter socket. Contact the Company for AIC rating of transformer feeding new or existing services. • Grouped metering containing greater than 6 metering positions. • All 480-volt services must be cold sequenced. 654. For all of the cold sequenced conditions listed above, the main disconnect with overcurrent protection shall be installed on the line side of and adjacent to the meter on the same wall, no greater than 3 feet in distance. The main disconnect shall be service rated for the appropriate AIC and shall include Class R (rejection) type clips installed. 655. Utility/line conductors are always connected to the top terminals of meter sockets. Customer conductors are always connected to the bottom terminals. Refer to Self-Contained Meter Socket Sequence and Mounting Arrangement. 57
  3. Page 60 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 60 of 67 Eversource | CT Information & Requirements 2024 Article 656-659 | Section 6 — Metering Instrument Transformer Installations – Current and Voltage 656. Refer to Article 611 for services where this type of meter installation is required. • Installations that require IT’s (current and voltage) shall be referred to the Company Meter Department for approval before equipment is ordered. Visit www.eversource.com, Builders and Contractors, Connecticut for current metering equipment information. • Service and metering equipment shall not be energized prior to being fully wired and inspected by the Company’s Meter Department and shall be in accordance with arc flash requirements included in this section. Instrument Transformer Metering Equipment – Enclosure/Conduit/Socket 657. The Customer shall furnish, install, own, and maintain Company approved IT enclosure, for the exclusive use of the Company. • Unapproved equipment is not permitted. • Any modification to approved metering equipment shall not be permitted unless explicitly approved by the Company’s Meter Department. • Customer shall procure proper provisions for mounting current and voltage transformers in the same compartment with hinged sealable doors. 600 amp – 1800 amp (12 inch) bar type transformers. 2000 amp – 3000 amp window type current transformers. Horizontal VT mounting provision(s) bolted to the bottom of the instrument transformer cabinet is required for all services greater than 240 volts. Customer shall furnish, install, own, and maintain an approved prewired combination meter socket and test switch. Visit www.eversource.com, Builders and Contractors, Connecticut for current metering equipment information. Entry through the hub opening at the top of the meter socket is not allowed. Refer to Instrument Transformer Connections for installation and wiring requirements. • • • • • • 658. All disconnecting switches that are under the control of the Company shall have proper provisions for lock out tag out requirements. 659. In order to provide isolation of the metering equipment, in accordance to arc flash requirements, the Customer shall furnish, install, own, and maintain the following: • A cold sequenced fused disconnect or breaker installed directly adjacent to the instrument transformer enclosure and within 3 feet. • A disconnect switch, displaying visible break, mounted within 3 feet, on the load side of the IT enclosure. No electrical connections are allowed between the IT enclosure, and the disconnect switch. Refer to Main Switch and Instrument Transformer Enclosure and Instrument Transformer Installation. 58
  4. Page 61 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 61 of 67 Eversource | CT Information & Requirements 2024 Article 660-664 | Section 6 — Metering Meter - Instrument Transformer – Test Switch – Wiring Installation 660. The Company shall: • Provide the IT(s) with the shorting device in the closed position for the Customer to install. • • • 661. Provide the instrument transformer wiring and making terminations to the IT equipment and test switches. Provide, install, and maintain the electric meter. Maintain the IT(s). The Customer shall: • • • • • • • • • • • Coordinate the pickup/drop off of the IT(s). Provide an approved IT enclosure. Mount current transformer (CT) and torquing to manufacturer specifications. Mount voltage transformers (VT) using appropriate nut and bolt hardware. Self-tapping screws shall not be permitted. Ensure line and load conductors are terminated within the IT enclosure. The connection of Customer equipment to or before the meter or to the secondary of the IT(s) is prohibited. All Customer equipment shall be installed on the load side of the utility CT(s). No other connection shall be permitted within the IT, for example, no piercing connectors or power distribution block, no drilling into the bus bar, etc. The IT cabinet shall not be used as a raceway or splice box. IT(s) are for the use of the Company only. There shall be no Customer owned equipment attached to the IT(s) or test switches. Refer to Instrument Transformer Connections for installation and wiring requirements. Fire Pumps 662. Fire pump services shall be one of the two configurations: • When the fire pump service is supplied by its own designated utility transformer, this service shall be IT rated and hot sequenced. The CT(s) VT(s) shall be installed in an approved IT enclosure. • The fire pump instrument enclosure shall be labeled: DE-ENERGIZE FIRE PUMP SERVICE FROM UTILITY TRANSFORMER. • No fire pump shall be fed from a self-contained meter. Arc Flash Equipment Requirements 663. The Company’s arc flash requirements are based on National Fire Protection Association for safe work practices (NFPA70E). 664. The Company reserves the right to request and review all arc flash study documents from the Customer. 59
  5. Page 62 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 62 of 67 Eversource | CT Information & Requirements 2024 Article 665-671 | Section 6 — Metering 665. This applies to all service-related work, including and not limited to: • Meter sets. • Meter exchanges. • Inspection. • Any service troubleshooting and maintenance. • Voltage monitoring requests. • Billing complaint investigations. • Customer requested service disconnects and reconnects. 666. Arc flash requirements apply to all metering equipment and utility operated disconnects, associated with any service configurations fed from a three phase source with the following conditions: • Instrument transformer rated. • Fire pump. • Modular metering includes single phase service fed from a three phase source. • Class 320-amp meter sockets with bus bar. • The Company reserves the right to request an arc flash study for any equipment that is not listed above. 667. ll arc flash studies shall be performed and properly maintained by a licensed engineer, provided by the Customer, prior to energizing the service. Contact the Company for AIC rating of transformer feeding new or existing services. 668. Any service modification, including the addition of distributed generation shall require service equipment to follow all arc flash requirements. 669. The service must be disconnected at the transformer, at the Customer’s expense, prior to any service work or inspection being performed if the following criteria are not met: • In the absence of properly certified arc flash study with proper labeling. • The arc flash rating exceeds 20 cal/cm2. Arc Flash Labeling Requirements 670. All labeling for arc flash rating must meet NFPA70E requirements including: • Ampere Interrupting Capacity (AIC) or Ampere Interruption Rating (AIR). • Nominal system voltage. • Arc flash boundary. • Minimum arc rating of clothing (cal/cm2). • Certification date. 671. If mitigation exists, a separate label containing the same items as referenced in article 869 with the alternative rating, after the mitigation has been applied. 60
  6. Page 63 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 63 of 67 Eversource | CT Information & Requirements 2024 Article 672-674 | Section 6 — Metering 672. The owner of the electrical equipment shall be responsible for retaining the documentation, installation, and maintenance of the marked label. 673. Proper labeling shall be applied to the exterior part of the following equipment: • Any utility operated disconnect. • Any additional disconnect devices utilized to isolate any distributed or backup generation. • IT rated cabinets. • Meter socket(s). • Limiter cabinets required for any network services. 674. If the calorie rating exceeds 20 cal/cm2 the following remediation shall be required at the Customer’s expense in order to reduce the minimum calorie rating below 20 cal/cm2: • Remote operation provisions • Addition of equipment containing maintenance mode settings (MMS) • De-energization of service during maintenance • Other remediation options may be required based on the Company safety requirements 61
  7. Page 64 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 64 of 67 Eversource | CT Information & Requirements 2024 Article 700-707 | Section 7 — Utilization Equipment Specifications General 700. When Customer owned equipment could or actually does interfere with the operation of any components of the Company’s electric system or the electric supply to others, the Company reserves the right to refuse service or disconnect service in accordance with the Company’s Terms and Conditions for Delivery Service. Such instances include, but are not limited to, harmonic distortion, poor power factor, voltage fluctuations, unacceptable transformers, and capacitor installations. Customers shall consult with the Company in advance of making any commitments for large motors, air conditioning equipment, welders, x-ray machines, electric tank-less water heaters, phase converters, or other equipment which may have a high instantaneous electric demand. The Company will determine the effect such installations may have on the Company’s system. Should the Company determine that the installation is likely to cause interference with the electric system or the electric service to others, the Company may refuse to connect service, discontinue service, require the Customer to make modifications to its system, or require the Customer pay the cost of modifications to the Company’s system to enable the equipment to be operated. It is the Customer’s responsibility to determine and correct the problems such equipment may have on their own system. Motor/Motor Driven Equipment Including Air Conditioning Equipment 701. The Customer is responsible for contacting the Company before purchasing motors/motor driven equipment to understand the application and the character of service. In general, motors of 3 horsepower or less will be supplied from a single phase service and motors larger than 3 horsepower will be supplied from a three phase service. 702. The electrical limitations of supply circuits may, in some cases, make it necessary to limit the size of the largest motor to be operated on any given part of the Company’s system. Written information as to such limitations is available upon inquiry to the Company. 703. In general, single phase 120/240 volt and three phase 120/208 volt equipment with an instantaneous draw of 68 amps or less, and three phase 277/480 volt equipment with an instantaneous draw of 30 amps or less, may be installed without modifications to the equipment or the Company’s system. The installation of equipment which has an instantaneous draw which is greater than specified in this paragraph may only be done upon written approval by a Company Representative, typically the Distribution Engineering Supervisor. 704. Upon application to the Company, the Company will determine if the motor is permissible. 705. All motors and motor driven equipment shall be equipped with suitable protective devices. Among such devices to be considered are those to provide protection against single phase operation of poly-phase motors, reversal of rotation in poly-phase motors, overloads, and voltage and frequency variations. 706. The Company will not be responsible for damage caused to Customer owned equipment where such damage is caused by the absence, failure, or misapplication of any Customer owned protective device. The Company will not be held responsible for damage caused by lightning or other acts of nature. Voltage Sensitive Equipment 707. Customers owning or planning to purchase electronic or other voltage sensitive equipment shall consult the manufacturer of the equipment and install suitable devices to protect against power system transients and/or loss of voltage. 62
  8. Page 65 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 65 of 67 Eversource | CT Information & Requirements 2024 Article 800-811 | Section 8 — Distributed Energy Resources Owned by Customers General 800. The information included in this section provides guidelines and requirements for Customer owned and/or customer Distributed Energy Resource systems. 801. The installation, connection, and operation of Customer-owned Distributed Energy Resource systems by a Customer receiving service from the Company shall adhere to the Company’s Tariffs, Terms and Conditions, and specific program guidelines. 802. The Customer shall contact the Company to obtain information as part of the Customer’s planning to make any installation of a Customer owned Distributed Energy Resource system. 803. Customer contact with the Company well in advance of equipment ordering and installation is imperative in order to allow sufficient time for the Company to conduct necessary interconnection studies. 804. An application to the Company is required to initiate the review of any request to interconnect to the Company’s grid. Refer to eversource.com, DG, Interconnections & Net Metering, Connecticut. 805. Any Customer construction shall not proceed until all Company approvals are received by the Customer. A service request and consultation with a Company representative may be required. 806. A Company issued permission to operate is required before proceeding with any interconnection to the Company’s grid. 807. Any changes to an existing service shall meet the requirements of this booklet. 808. Should a customer owned Distributed Energy Resource system require a planned shutdown, it must be disconnected on the load side of the production meter only. The production meter shall remain energized at all times. Parallel Generation 809. Proposals to install generation to operate in parallel with the Company distribution system must follow the formal procedure and application process as documented in the Eversource Energy and United Illuminating Company Guidelines for Generator Interconnection – Exhibit B – Generator Interconnection Technical Requirements. Refer to eversource.com, DG, Interconnections & Net Metering, Connecticut. Non-Parallel Generation (Standby or Emergency) 810. A Closed Transition “make before break” generating facility must be synchronized with the Company’s electric power system prior to transfer occurring. 811. When you are considering any on site generating facilities that will operate in parallel (closed transition) with the Company’s system the Customer must follow all of the applicable requirements of this booklet and follow the formal procedure and application process as documented in the Eversource Energy and United Illuminating Company Guidelines for Generator Interconnection. Refer to eversource.com, DG, Interconnections & Net Metering, Connecticut, Application to Connect. 63
  9. Page 66 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 66 of 67 Eversource | CT Information & Requirements 2024 Article 812-818 | Section 8 — Distributed Energy Resources Owned by Customers Distributed Energy Resource Metering and Service Requirements 812. The meter socket or instrument transformer (IT) compartment shall not be used as a raceway or interconnection point for a generator. Auxiliary wires shall not be inside any meter socket or metering IT compartment. Refer to Article 615. 813. Any indoor metering shall be relocated outdoors. The revenue and production meters and utility emergency disconnects shall be grouped on the exterior of the building, co-located within 10 feet of the revenue meter. The utility emergency disconnect shall be within 3 feet of the associated production meter. Refer to eversource.com, DG, Interconnections & Net Metering, Connecticut. 814. The requirements for the emergency disconnect is independent of any disconnects associated with cold sequence metering. 815. Customer owned Distributed Energy Resource systems may qualify for a variety of metering configurations as outlined in the programs available. Refer to eversource.com, DG, Interconnections & Net Metering, Connecticut for available program details and requirements. 816. Bi-directional metering (also referred to as netting) is a method of measuring how much energy is consumed and how much is exported to the Company grid. This configuration includes a bidirectional revenue meter and a production meter. • The production meter measures the total generation from the Customer owned Distributed Energy Resource system. The production meter shall be energized at all times. Over current protection is required between the point of interconnection and the utility side of the production meter. • The bi-directional revenue meter measures Company electricity consumed by the Customer and any excess electricity generated by the Customer owned Distributed Energy Resource system that is exported to the Company grid. Bi-directional metering interconnections shall always be behind the revenue meter. • Refer to eversource.com, DG, Interconnections & Net Metering, Connecticut for full program details. 817. Buy-all installations require a new service request for a standalone single metered service for generation only (no customer load). This configuration includes a bi-directional revenue meter only. The revenue meter measures both electricity consumed by the customer and power generated by the Distributed Energy Resource system. Refer to eversource.com, DG, Interconnections & Net Metering, Connecticut for full program details. 818. Refer to eversource.com, DG, Interconnections for meter socket labeling requirements. 64
  10. Page 67 of 67

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-001 Attachment 5 Page 67 of 67

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

Text of ICC-002 Attachment 1.pdf

Extracted from the file · 29 pages · 46,015 characters

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)