Interrogatory responses

Answers to questions 1, 2, 4, 10, 18, 20

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of ICC-001 Attachment 3.pdf

Extracted from the file · 34 pages · 76,972 characters

Text of ICC-001 Attachment 4.pdf

Extracted from the file · 34 pages · 72,650 characters

Text of ICC-001 Attachment 5.pdf

Extracted from the file · 67 pages · 136,480 characters

Text of ICC-002_Final.pdf

Extracted from the file · 2 pages · 2,788 characters

  1. Page 1 of 29

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 1 Page 1 of 29 Eversource Energy The United Illuminating Company Docket No. 03-01-15RE04 Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 20 kW (ac) or Less April 8, 2019 1 Eversource - Internal Use
  2. Page 2 of 29

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 1 Page 2 of 29 Table of Contents 1) General Considerations 2) Procedure 3) Terms & Conditions 4) Technical Requirements 5) Instructions on filing an Interconnection Application 6) Appendix A: Glossary 7) Appendix B: Codes & Standards The Electric Distribution Companies (“EDCs”) of Connecticut have a responsibility to the public and to EDC customers to ensure that all generator interconnections to the Electric Power System (“EPS”) are safe and do not adversely impact the reliability of the EPS. These Guidelines include the application form, procedure, terms and conditions and technical requirements to ensure an expedited and successful interconnection process. These guidelines are only for certified inverter based residential single phase interconnections at generating facilities with an aggregate nameplate rating of 20kW (ac) or less. All others should follow the Guidelines for Generator Interconnection Fast Track and Study Process. 2 Eversource - Internal Use
  3. Page 3 of 29

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 1 Page 3 of 29 1 General Considerations 1.1 This document provides guidance for projects that fall under the State of Connecticut jurisdiction. From time to time amendments to existing standards and regulations are implemented that could require the implementation of added functionalities on inverters that are now generally associated with advanced inverter technology. It is important to note that compliance with other authorities having jurisdiction may result in additional requirements not covered in this document (i.e. NERC, ISONE, Voltage and/or frequency Ride-Through etc.). 1.2 In order to accommodate higher levels of distributed generation penetration and to reduce the need for EPS upgrades, the EDCs may recommend the use of inverters with added functionalities such as voltwatt and volt-var control that are now associated with advanced inverters including communication and metering capabilities. 1.3 The Interconnection Customers (“Customers”) shall be fully responsible for ensuring ongoing compliance or causing ongoing compliance with these Guidelines. 1.4 When interconnecting Generating Facilities to the EPS, it is important to minimize the potential hazard to life and property. The interconnection of a new Generating Facility to the EPS must not degrade any of the existing EDC protection and control schemes nor lower the existing levels of safety and reliability to other customers. 1.5 Neither the EDC nor the Customer should depend on the other for the protection of their respective equipment. The EDC’s minimum protection requirements are designed and intended to protect the EDC power systems alone. 1.6 The Customer is responsible for the costs of the EDC’s installation of any protective equipment necessary to ensure safe and reliable operation of both EPS and the Customer’s Generating facilities. The need for protective equipment will vary, depending on the Generating Facility’s location within an EDC circuit. 1.7 The Customer is responsible for obtaining any and all permits required for the construction and operation of the Generating Facility. 1.8 All Customers will be treated fairly and uniformly, on a first come first serve basis, without preferential treatment and in a non-discriminatory manner. 3 Eversource - Internal Use
  4. Page 4 of 29

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 1 Page 4 of 29 1.9 The EDC cannot recommend manufacturers, vendors or technical experts to assist Customers. 1.10 If the Customer has questions or needs clarification about the process or technical requirements, the Customer should consult the appropriate EDC contacts, posted on the generator interconnection website of the appropriate EDC. 1.11 If the EDC determines that the proposed generator will be interconnected to an Area Network, then the Customer may be required to file an application under the, Guidelines for Generator Interconnection Fast Track and Study Process, unless waived by the EDC. 1.12 Definitions and acronyms used in these Guidelines can be found in the “Definitions” section, in Appendix A. 4 Eversource - Internal Use
  5. Page 5 of 29

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 1 Page 5 of 29 2 Procedure The following steps outline the Interconnection process. Customer Submits Application EDC Sends Receipt Notification Conduct Screens (3 Business Days) Application Complete? Notify customer (10 Business Days) Yes Install system & secure Inspector’s Approval No Yes No Resolve Open issues Pass Screen? Send Contingent Approval 15 Business Days Notify customer (10 Business Days) If required, Request Witness Test 10 Business days Test Pass? No Resolve Open issues Payment Schedule Description Less or equal to 20 kW Application Fee $200.00 5 Eversource - Internal Use Discuss options with customer Yes Authorization to interconnect
  6. Page 6 of 29

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 1 Page 6 of 29 2.1 The Customer completes the Interconnection Application ("Application"), and submits it to the EDC with payment. 2.2 The EDC acknowledges to the Customer, receipt of the Application within three (3) Business Days of receipt of the Application. 2.3 The EDC evaluates the Application for completeness and notifies the Customer, within ten (10) Business Days of acknowledgment of receipt, whether the Application is complete. If the Application is not complete, the EDC will advise the Customer on what material is missing and/or incomplete. At the time the EDC informs the Customer that the Application is missing/incomplete, the EDC will place the subject Application on hold in the interconnection queue. Once the Customer provides all required information, the Application process will continue. However, if the Customer does not provide the required documentation within fifteen (15) Business Days of the EDC’s request, the EDC may be deem the Application withdrawn. 2.4 After receipt of a completed Application and the EDC verifies that the Certified Inverter-Based Generating Facility can be interconnected safely and reliably, the EDC facilitator will respond with a Contingent Approval to interconnect notification. The EDC will make a good faith effort within fifteen (15) Business Days of determination of a completed Application to either respond with a Contingent Approval to interconnect or notify them of its findings. 2.5 A Certified Inverter Based Generating Facility Application is approved for Interconnection to the EDC’s distribution system if all of the screens below are met: 2.5.1 For generating sources (e.g. solar or wind), the aggregate generating capacity does not exceed the nameplate rating of the service transformer for those Generating Facilities directly connected to the distribution transformer. 2.5.2 If the proposed Generating Facility is to be interconnected on single-phase shared secondary, the aggregate generation capacity on the shared secondary, including the proposed generator, will not exceed 20 kVA. 2.5.3 If the proposed Generating Facility is to be interconnected using a 120 Volt configuration, its addition will not exceed 15% of the nameplate rating of the service transformer. 6 Eversource - Internal Use
  7. Page 7 of 29

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 1 Page 7 of 29 2.5.4 The expected maximum change in voltage anywhere along the circuit due to the full output of the aggregate generation at corresponding light load periods does not exceed the difference between the exemption to the upper voltage variation established by the Public Utilities Regulatory Authority (“PURA”) by way of a Decision, dated March 6, 2019, in Docket No. 03-01-15RE04, or the upper voltage variation bound established in Conn. Agencies Regs. § 16-11-115(a) whichever is greater (currently maximum of 5% of standard voltage) and the expected primary voltage of the circuit at corresponding light load periods incorporating the bandwidth of voltage regulating equipment. 2.6 When Certified Inverter Based Generating Facility applications fail one or more of the above screens, the Customer will be provided options to allow them to comply with all screens or will be directed to the Fast Track & Study Interconnection Guidelines process. 2.7 After installation of the Generating Facility, the Municipal Electrical Inspector’s approval must be secured. Within ten (10) Business Days from the date the EDC receives the Municipal Electrical Inspector’s approval, the EDC may request a Commissioning/Witness test, and if necessary, may schedule appropriate metering replacement. 2.8 There will be no charge for EDC personnel to witness the Commissioning Test of Certified Inverter Based Generating Facility, provided that the testing is completed in one visit. If the testing cannot be completed or must be repeated, because of a problem on the first visit, the EDC will charge the Customer for EDC personnel to witness the Commissioning Test on any subsequent visit(s). 2.9 The EDC will not perform, aid in performance of, or provide equipment for the Commissioning Test. 2.10 The EDC may inspect the Generating Facility to ensure that all equipment has been appropriately installed. 2.11 Commissioning Tests of the Customer's installed equipment must be performed pursuant to applicable codes, standards and equipment manufacturers’ recommendations. The Customer may be required to provide a written Commissioning Test procedure for EDC approval, prior to the Commissioning Test. 7 Eversource - Internal Use
  8. Page 8 of 29

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 1 Page 8 of 29 2.12 If the EDC determines to inspect the Generating Facility, then such inspection must occur prior to the interconnection of the Generating Facility. The EDC will endeavor to conduct the inspection within ten (10) Business Days after receipt of the Electrical Inspector’s approval, and schedule it at a time agreeable to the Parties. 2.13 If the EDC does not require an inspection of the Generating Facility, the EDC shall provide written notice to the Customer and the witnessing of the Commissioning Test is deemed waived (unless the Parties agree otherwise). 2.14 If a Commissioning Test is required, the EDC shall provide a written statement that the Generating Facility has passed inspection or shall notify the Customer of the reason for failure. 2.15 The Customer cannot operate the Generating Facility in parallel until approval to do so has been provided by the EDC. 2.16 Codes and Standards applicable to the Application can be found in Appendix B. 2.17 For additional technical requirement refer to Section 4 of this document. 8 Eversource - Internal Use
  9. Page 9 of 29

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 1 Page 9 of 29 3 Terms and Conditions 3.1 Reasonable Efforts The applicable EDC shall make reasonable efforts to meet all timeframes provided in these procedures unless the EDC and the Customer agree to a different schedule. If the EDC fails to meet a deadline provided herein, it shall, within three (3) Business Days of receipt of the request of a status inquiry, (a) respond to the Customer, (b) explain the reason for the failure to meet the deadline, and (c) provide an estimated date by which it will complete the applicable Interconnection procedure in the process. 3.2 Disputes The Parties shall agree to attempt to resolve all disputes promptly, equitably and in a good faith manner. If Parties are unable to informally resolve their dispute, the following formal three step dispute resolution process must be followed: 3.2.1 Negotiation: Upon receipt of written request for formal dispute resolution, the Parties shall negotiate in good faith for ten (10) Business Days in an attempt to resolve the disputed issues. The negotiation will take place between appropriate representatives of each Party. An appropriate representative is a vice-president or a member of senior management with sufficient authority to resolve the dispute. 3.2.2 Mediation: If the Parties have not resolved the dispute through negotiation, the Parties agree to attempt to resolve their dispute through non-binding mediation. The Parties shall agree to a mutually agreeable mediation process and mediator. Each party will select a mediator within five (5) Business Days of the end of the negotiation period and the two selected mediators will attempt to, within five (5) Business Days, select a third, mutually agreeable, mediator. The Parties shall share the cost of mediation equally. Once the three mediators are selected and the mediation commences, the Parties agree to engage in mediation in good faith for a period of not less than 30 days. 9 Eversource - Internal Use
  10. Page 10 of 29

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 ICC-002 Attachment 1 Page 10 of 29 3.2.3 PURA Dispute Resolution: If the Parties cannot resolve their dispute through negotiation or mediation within 30 days, either Party may commence an action at PURA for resolution of the dispute. All timeframes in this process and the Dispute Resolution Process itself may be modified by mutual written agreement of the Parties. 3.3 Confidentiality The EDC shall maintain the confidentiality of all information so designated by the Customer if clearly marked and labeled “Confidential” except as otherwise required by system operators, applicable laws and regulations, and regulatory and judicial requests or requirements. In the event a third party requests that the EDC produce confidential information, the EDC shall provide advance notice to the Customer, if possible, to give the Customer an opportunity to seek protective treatment of such information. If such information is requested or required by PURA, the EDC will seek protective treatment of such information. Confidential information does not include information previously in the public domain or that becomes generally available to the public without violation of these Guidelines. 3.4 Comparability The EDC shall process and analyze all Interconnection Applications in a timely manner as set forth in this document. The EDC shall use the same reasonable efforts in processing and analyzing Interconnection Applications from all Customers. 3.5 Record Retention The EDC shall maintain, for three (3) years, records, subject to audit, of all Interconnection Applications received under these procedures, the times required to complete Interconnection Application approvals and disapprovals, and justification for the actions taken on the Interconnection Applications. 3.6 Acceptance of Guideline Requirements The Customer shall sign and return the Application which indicates the Customer’s acceptance of the terms, conditions, and requirements included in the Guidelines. After the EDC receives the Application signed by the Customer acknowledging acceptance of all terms and conditions contained 10 Eversource - Internal Use

Text of ICC-002 Attachment 2.pdf

Extracted from the file · 74 pages · 148,550 characters

Text of ICC-002 Attachment 3.pdf

Extracted from the file · 27 pages · 91,051 characters

Text of ICC-004_Final.pdf

Extracted from the file · 1 page · 983 characters

Text of ICC-010_Final.pdf

Extracted from the file · 4 pages · 11,507 characters

Text of ICC-018_Final.pdf

Extracted from the file · 2 pages · 2,628 characters

As listed on the current system

Question(s) Answered 1, 2, 4, 10, 18, 20 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)